top loading 中文意思是什麼

top loading 解釋
頂部加壓
  • top : n (opp bottom foot)1 頂,頂部,頂端。2 頭,頭頂;尖端;樹梢,樹頂;(事物的)上層部分。3 最高位...
  • loading : n. 1. 裝貨。2. 裝載量;重量;載荷;(船隻等的)貨載。 3. 填充物,填料。4. 額外人壽保險。
  1. Transport and handling rail cars and road tankers. permanent stations for top loading and unloading of pressurized liquefied or dissolved gases

    運輸和裝卸的軌道車和道路罐車.增壓液化氣體或溶解氣體頂部裝載和卸載用永久車站
  2. After loading there was a long delay before the horses were brought, these having been unharnessed during the ridding ; but at length, about two o clock, the whole was under way, the cooking - pot swinging from the axle of the waggon, mrs durbeyfield and family at the top, the matron having in her lap, to prevent injury to its works, the head of the clock, which, at any exceptional lurch of the waggon, struck one, or one - and - a - half, in hurt tones

    東西裝上車以後,她們又等了許久,拉車的馬才備好了牽過來,因為馬車到了以後,馬就從車上卸下來了一直耽誤到兩點鐘,人馬才一起上路做飯的鍋吊在車軸上,德北菲爾德太太和孩子們坐在馬車頂上,把鐘放在腿上抱著,防止馬車在猛烈顛簸時把機件震壞了馬車猛地晃一下,鐘就敲一下,或敲一下半。
  3. Standard test method of testing top - loading, direct - reading laboratory scales and balances

    直讀實驗室秤盤和天平的最大載荷試驗
  4. They must not be transported in open wagons on railways and, if by ship, no top loading is allowed ; if by truck, they must be securely fastened up and safely protected

    鐵路運輸不得使用敞車,水路運輸不得配裝倉面,公路運輸應當苫蓋嚴密,捆紮牢固。
  5. The following conclusions are gained : ( 1 ) the located shear band prongs the ligament near the top crack tip and the structure may occur shear - mode fracture at the angle of 155 ? to crack when load is 87. 92mpa ; the mode of fracture of the flange joint structure is not possible to be void - mode ; ( 2 ) it is proved that loading and then unloading repeatedly can not increase the possibility of invalidation of the structure when the times of loading and unloading are not too more when load is operating pressure ; the structure is safe when the vessel is operating ; ( 3 ) in the fe model of the thesis, not considering the influence of water pressure test which is in the process of fabrication of vessel in fe results in larger deviation in analysi

    得出了以下結論:在8792mpa的載荷下筒體一封頭連接結構處的集中剪切帶貫穿韌帶,可能發生沿與原裂紋線成155 「角方向剪切型斷裂;筒體一封頭連接結構不可能發生韌窩型斷裂; ( 2 )在工作壓力下進行次數不多的反復加、卸載,結構不會破壞,也不會喪失安定性:結構在工作狀態下是安全的; m在本文的彈塑性有限元模擬計算中,對于裂紋尖端進行力學分析時,不考慮壓力容器製造過程中水壓試驗的影響,將導致計算結果出現較大的偏差; ( 4 )筒體完全屈服時的載荷為92石3mpa ,封頭完全屈服時載荷為86
  6. Payment : irrevocable, confirmed, non transferable, automatically revolving documentary letter of credit ( dlc ), payable 100 % at loading sight issued and / or confirmed by a top 15 world bank, in favor of the seller in the amount of us dollars

    付款方式:不可撤消的,保兌的,不可轉讓的,自動循環的跟單信用證,由世界排名前15位的銀行開立,保兌並100 %支付,金額按美元,以賣方為受益人
  7. So how to transfer scientifically self - balanced test data into top load curve according to its actual working behavior, become the obstacle of its practical application. in accordance with actual forcing behavior and reaction mechanism between pile and soil, the article analyzes the relation between top part and bottom part, load transferring mechanism and difference with other loading way by ansys program. so the reliability of determine bearing capacity by self - balance method has been proved

    本文根據自平衡加載方式下樁身的實際受力狀況、樁土間的相互作用機理以及單樁破壞機理,建立了單樁的離散元模型,採用ansys通用分析軟體,選取合理的單元類型、材料特性等,數值分析了基樁在自平衡加載方式下上下樁段的相互關聯、荷載傳遞機理以及與其它加載方式的區別,論證了採用自平衡試樁法測定單樁極限承載力的可行性。
  8. Electronic top - loading balance

    電子上皿天平
  9. In the paper, other research results are summarized, and a big test model indoor of row pile retaining and protecting deep foundation pit is designed. for homogeneous soil or samdwich soil structure three different retaining and protecting kinds : dense pile, thin pile and without pile are designed, using excavation simulation and loading on the top of slope, the model test is divided into two stages : foundation pit excavation simulation stage and destroy test stage. in this paper, for three different retaining and protecting kinds, the relation between soil pressure and displacement of piles, the relation between soil stress and strain, interaction of pile and soil and retaining and protecting loss - stability destroy are systemic studied

    本文總結了前人研究成果,構築大型室內深基坑排樁支護試驗模型,在均質及層狀土層結構地基上,設計了密排樁、疏排樁及無支護三種不同支護型式,採用模擬開挖與坡頂均布加荷方式,進行了模擬基坑開挖和破壞性的兩個階段試驗,對三種不同支護型式的土壓力與樁位移、土體應力與變形、樁土共同作用及支護結構失穩破壞進行系統研究。
  10. The present invent ion utilizes the top loading technique and the smooth tapering technique to create the design of a compact and built - in antenna which will provide a planar antenna structure with broad bandwidth and high radiation efficiency

    饋入傳輸線的寬度大致與漸變帶段的底邊同寬,且頂邊與漸變帶段的底邊密接,而底邊藕接至頻電路。
  11. In this thesis, the stress intensity factors of top - down cracks caused by loading are calculated using three dimensional finite element model and compared to the results of plane strain model

    本文採用三維有限元模型分析了荷載作用下自上而下裂縫尖端的應力強度因子,並與二維平面應變模型分析的結果進行比較。
  12. The vertical loading plays a major role in the state of the flexural stress. beneath the mountain belts, the compression decreases and changes to extension from the top of the elastic plate to the bottom. the change of the flexural stress beneath the basin is vice versa

    從彈性板頂部向下,造山帶下方的擠壓逐漸減小,到中性面以下變為拉張,然後張應力逐漸增大,在彈性板底部達到最大;盆地下方的變化則與之相反。
  13. There are still many problems remain to be solved in these aspects, such as behavior research on the lateral resistant of steel frame and connection etc. in this paper three 1 : 2 - scale steel frame specimens and eight full - scale steel frame connection specimens are tested on their behavior under cycle loading. there are six aspects as below on the problems of steel resident building researched : 1 pseudo - static force testing of eight full - scale connections, including top - seat angle connections, two web flange and top - seat connections and dog - bone connections are carried out for the first time in our country

    本文針對鋼結構住宅體系中亟待解決的若干問題,完成了三榀1 : 2鋼框架模型和八個足尺比例的樑柱連接模型在低周往復荷載作用下的試驗,進行了以下幾個方面的深入研究: 1進行了頂底角鋼連接、帶雙腹板頂底角鋼連接等半剛性連接及狗骨式剛性連接這三種連接類型共八個原型試件的擬靜力試驗。
  14. Work - piece turntable is fixed on the detachable top cover is convenient for work - piece loading and unloading and also for maintenance

    安裝在真空室上蓋上的工件轉架便於工件的裝卸和維護。
  15. We base on the wind generators ' traits, have produced the generator related products, like charging system, inverter, and repacking system, it has the protection functions for the overcharging, over - discharging, short - circuit, over - loading and superheating etc. to top it off, the digital readout and the alarm system makes the generator run more safely

    充電、逆變、卸荷系統完全根據風力發電機的特點配套生產,有完善的過充、過放、短路、過載、過熱保護功能,採用數字顯示,簡單直觀,有聲報警,系統運行更加穩定可靠。
  16. 5. top air style shaftless fixing and liquid pressure lifting structure are adopted for raw material loading and discharging, and 7. screw motor is used for adjusting width

    5原料裝卸採用氣頂式無軸裝夾和液壓升降結構,由絲桿幅電動調寬。
  17. Mechanical top - loading balance

    機械式上皿天平
  18. Top - loading balance

    上皿天平
  19. Transport and handling of petroleum products - fixed positions for top loading in bulk of road tankers with butane and propane

    石油產品的運輸和裝卸.丙烷丁烷道路罐車散裝注入的固定裝置
  20. Forget everything you thought you knew about packs. this top - loading internal frame may be the most pioneering design we ' ve seen in a decade.

    忘記你關于背包的所有概念,這款頂部開口裝載的內架包也許是我們在這個時代見到的最先鋒的設計。
分享友人