  1. At first, based on the results of in - situ load tests, the load - settle curves are acquired, and the effects of different reinforcement parameters are presented. these parameters include the linear density ratio ( ldr ) ; the location of the top layer of the geobelt measured from the bottom of the load plate ( u ) ; the different materials of geobelt ; the number of reinforcement layers ( n ) and the distance between the two layers of geobelt ( a h ). these results show that the bearing capacities of the reinforced composite foundation can be improved and the settlement can be reduced

    首先,通過現場載荷試驗,獲取了加筋墊層復合地基荷載-沉降曲線,從筋帶鋪設的密度、筋帶的首層間距、不同筋帶材料、加筋層數以及雙層筋帶的層間距等幾個方面分析了以上加筋參數對加筋復合地基承載力的影響,指出筋帶的存在提高了加筋復合地基的承載力,減小了沉降。
  2. China grand theater has advanced push and pull lift mechanical stage and orchestra, which offers excellent assurance for the art treatment of performance ; the scientific and rational sound establishment and reinforcement system and top acoustics recording equipment let the high grade and high rank large - scale symphonic concert have best audiovisual effect. in addition, the luxury illmination in the hall, the 1500 luxury and cozy seats in the audience hall and big and small vip drawing rooms which can hold 100 people can all show the splendid and luxury style of china grand theater

    中國劇院具有較先進的推拉升降機械舞臺和樂池,為演出的藝術處理提供了良好保障;電腦控制的各類燈具使舞臺的藝術效果大放光彩;科學合理的建聲、擴聲系統和先進的音響錄音設備為舉辦高品位、高檔次的大型交響音樂會提供了最佳的視聽效果。劇院大廳吊裝的華麗燈飾、觀眾廳1500席美觀舒適的新型座椅、可容納100人的大小貴賓休息室等,無不顯示出中國劇院富麗堂皇的豪華氣派。
  3. Base on the practices, it was concluded that the " time - space effects " excavation method combining with the ground reinforcement could be employed to control the deflection in deep foundation pits under the top - down construction condition, and consequently to protect the neighboring facilities

    在工程實踐的基礎上提出結合坑內土體加固採用時空效應法的開挖技術是逆作開挖條件下控制深基坑卸載變形,保護周邊環境和設施的有效方法。
  4. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  5. Secondly, referring to the results of press box, the stress distributions on the top of soft soil layer under different reinforcement conditions are obtained. these results show that the effects of stress distributions of geobelt - reinforced gravel cushion are better than gravel cushion

    其次,通過壓力盒的觀測值,得到不同加筋參數條件下的加筋碎石墊層底部土壓力分佈曲線,了解了墊層下部土壓力的分佈情況,得出加筋墊層的應力擴散效果比無筋墊層顯著。
  6. Abstract : based on the systematic analysis of the shear behavior for r. c. beams, the tests of 11 simple supported beams under the top concentrated loads and the uniform loads are supplemented. the prime variable is shear span ratio, span depth ratio, horizontal web reinforcement ratio and vertical web reinforcement ratio. according to the test results, the working behavior, the prime shear failure modes, the effect of concrete and web reinforcement ( horizontal web reinforcement and vertical web reinforcement ) and other aspects of r. c. beams are analysed. the uniform calculation method for shear capacity of deep beams, short beams and shallow beams for practical is presented

    文摘:在對國內外鋼筋混凝土梁的受剪性能進行較系統分析的基礎上,補充了11根鋼筋混凝土簡支短梁在頂部集中荷載和均布荷載作用下的試驗,試驗梁的主要變化參數為剪跨比、跨高比、水平腹筋率和垂直腹筋率.根據試驗結果,對試驗梁的工作性能、主要的剪切破壞形態、混凝土項的抗剪作用、抗剪腹筋(包括水平腹筋、垂直腹筋)的作用等進行了較為深入的分析,提出了可適用鋼筋混凝土深梁、短梁和淺梁相互協調的受剪承載力的統一計算方法
  7. In recent years, during the detection of the established reinforced concrete or the prestressed concrete box girder bridges etc. the large structures, we can find that the concrete in particular structural positions such as the anchorage zones of prestressed reinforcement with dense reinforcement, the prestressed pipe in which the space of reinforcement or the thickness of concrete cover is small, the top and bottom flange of box girder and so on has brought great difficulty to concrete construction because of the small size and densely - packed reinforcement

    對于變截面t梁、工字梁、箱梁等常見結構,截面形式復雜,一些部位尺寸較小且密集配筋,如梁頂板,梁底板,預應力管道間,混凝土不可避免的造成不密實導致耐久性降低,而這些問題往往為設計者所忽略。對于新建橋梁混凝土的密實度問題,尤其是新建橋梁關鍵部位的混凝土密實度和耐久性問題,人們研究和關心的較少,這也為橋梁的質量監督控制和使用壽命埋下了隱患。
  8. Besides, compariative analysis was carried out on ductility and energy comsumption of the interior joints on the top story with 90 ? bent hooks, exterior joints in the intermediate stories with different detailing of longintudinal reinforcement in the columns, and the knee joints with different lap splices in the beam and the column under negative moments. seismic anchorage and lap splices schemes were presented for the longitudinal rebars in the joint core

    此外重點對不同條件下中間層端節點梁筋帶90彎折錨固端的試驗結果、頂層中節點採取不同柱筋構造方案的試驗結果以及樑柱負彎矩筋採取不同搭接方案的頂層端節點的試驗結果的延性和耗能性進行了對比分析。
  9. On march 23, 2007, by express delivery, sun wei forward a letter to the concerned departments of the beijing government, pointing out “ vacancy cavity exists in the top of the no. 10 subway construction site, suggests to apply exploration, fill - up and reinforcement as early as possible, otherwise a major accident might occur ”

    2007年3月23日,孫威以特快專遞致函北京市有關主管部門,指出「地鐵10號線頂部存在空洞,建議及早勘察、充填和加固,否則將可能釀成很大的事故」 。