tunnel approach road 中文意思是什麼

tunnel approach road 解釋
通往隧道入口道路
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  • approach : vt 1 向…接近,走近;使接近。2 探討;看待,對待,處理。3 向…接洽[提議]。4 〈美國〉企圖收買。vi 臨...
  • road : n 1 路,道路;街〈略 Rd 〉;公路;行車道;路程,行程。2 〈美國〉鐵路。3 方法,手段,辦法;(走向...
  1. Tai lam tunnel and yuen long approach road bylaw

    《大欖隧道及元朗引道附例》
  2. The field trial, on the k7 + 008 ~ k7 + 053 slope of the west approach at zhegu mount tunnel road 317, evaluates fully construction techniques and protection function of the ecological material

    選取國道317線鷓鴣山隧道西引道k7 + 008 k7 + 063路塹巖質陡坡作現場施工試驗,全面評價草種、生態基材在高寒氣候條件下的生態護坡功能及施工方法和工藝。
  3. Tai lam tunnel and yuen long approach road ordinance

    大欖隧道及元朗引道條例
  4. It comprises a two - kilometre tunnel, associated approach roads, a major road interchange on hong kong island and a toll plaza on kowloon side

    工程包括一條長兩公里的隧道相關的連接引道位於港島的交匯處及九的繳費廣場。
  5. Metre approach road, is operated and maintained by the discovery bay road tunnel company limited, which also built it

    米的接駁道路組成,並由愉景灣隧道有限公司建造、保養和營運。
  6. The 2. 4 - kilometre discovery bay tunnel link, which comprises a 630 - metre single tube two - way tunnel and a 1 770 - metre approach road, is operated and maintained by the discovery bay road tunnel company limited, which also built it

    4公里,由630米長的單管雙向行車隧道和1770米長的接駁道路組成,由愉景灣隧道有限公司建造、營運和保養。
  7. The 3. 8 - kilometre tai lam tunnel, together with the 6. 3 - kilometre yuen long approach road, forms the route 3 ( country park section ), which extends from ting kau to au tau

    3公里的元朗引道連接,組成三號干線(郊野公園段) ,由汀九伸展至凹頭。年內,大欖隧道平均每日行車量達44500架次。
  8. The tai lam tunnel measures 3. 8 kilometres and, together with the 6. 3 - kilometre yuen long approach road, forms the route 3 ( country park section ) which extends from ting kau to au tau

    8公里。該隧道與全長6 . 3公里的元朗引道連接,組成三號干線(郊野公園段) ,由汀九伸延至凹頭,一九九八年平均每日行車量達
  9. Driving in excess of speed limit indicated by a speed limit sign of the type shown in figure no. 6, 7, 8 or 9 in the schedule to the tai lam tunnel and yuen long approach road bylaw cap 474 sub. leg. by more than 15 kilometres an hour, other than where item 51 or 52 applies

    以比《大欖隧道及元朗引道附例》 (第474章,附屬法例)附表第6 、 7 、 8或9號圖型所示類型的速度限制標志顯示的速度限制高出逾每小時15公里的速度駕駛,但第51或52項適用的情況除外
  10. Sha tin heights tunnel approach - a 0. 6 - km dual two - lane tunnel approach road in tai wai connecting to the proposed road t3, with slip roads connecting to che kung miu road che kung miu road slip roads

    築建沙田嶺隧道引道在大圍築建一條長0 . 6公里的雙程雙線分隔隧道引道,連通擬建的t3道路。
  11. Upon its completion in 1999, the strategic link will provide access to the developments in the hung hom bay reclamation and relieve traffic congestion at the cross - harbour tunnel approach road

    該道路在一九九九年竣工后,將可提供一條通往紅?灣填海區的通道,並紓緩通往海底隧道的道路的交通擠塞情況。
  12. In this paper, the basic and important parts are studied. for example, the capacity of jet fan in tunnel, the flux distribution and resistance loss in the chimney. this approach is capable of modeling multi - dimensional, time dependent nature of fire in a road tunnel, this paper presents the critical ventilation velocity in various heat release rate and smoke release rate for jingfu highway

    以京福高速公路美菰林隧道的結構參數為依據,當隧道內發生火災時,對隧道煙霧隨時間的發展擴散過程進行了動態的模擬與研究,得出了不同的火災放熱率、發煙率的情況下,控制隧道煙霧迴流的臨界風速這一關鍵數據,為隧道突發火災時的緊急通風控制提供參考。
  13. Subcommittee to study western harbour crossing ordinance replacement of schedule 1 notice 2006 and tai lam tunnel and yuen long approach road ordinance toll increase notice 2006

    研究2006年西區海底隧道條例更換附表1公告及2006年大欖隧道及元朗引道條例增加使用費公告的小組委員會
  14. A subcommittee was formed to examine the tate s cairn tunnel ordinance replacement of schedule notice 2005 and tai lam tunnel and yuen long approach road ordinance replacement of schedule 1 notice 2005

    成立小組委員會,以研究2005年大老山隧道條例替換附表公告及2005年大欖隧道及元朗引道條例替換附表1公告。
分享友人