underground base 中文意思是什麼

underground base 解釋
地下基地
  • underground : adj 1 地(面)下的。2 隱蔽的,秘密的。3 (電影,報刊等)標新立異的,試刊的,試驗性而非正式的。4 ...
  • base : n 1 基底,基,根基,底座;底層,底子;(紀念碑等的)基址;(山)麓。2 【軍事】基地,根據地。3 根...
  1. Based on the geological, hydrogeological and hydrochemical information, the genesis of the underground hot water in qi county of shanxi has been analyzed. it is concluded that the formation of underground hot water is related to the magmatic activity in yanshan period, the goup of the base fault block forming in new tectonic period, the large depth and fast variety to underground water cycle

    從地質、水文地質、水化學等方面,分析了祁縣地區地下熱水成因,得出該地區地下熱水形成與燕山期巖漿活動、新構造運動形成的基底斷塊隆起及地下水循環深度大、交替迅速有關。
  2. Based on a comprehensive analysis of stability for the rock seam above hanging wall at dongxiang copper mine, effects of the stability on structures on ground surface are demonstrated, which provides science base for treating rationally relation between the structures and underground mining

    通過對東鄉銅礦采空區上覆巖層穩定性的計算分析,論證其對地表建(構)築物的影響,為合理處理這些地表建築物和該采區地下開採的關系提供科學決策的依據。
  3. Based on these and other considerations, some scientists have proposed that methanogens living on geologically derived hydrogen might form the base of underground microbial ecosystems on mars and on jupiter ' s ice - covered moon, europa

    基於前述及若干理由,有些科學家便提出,在火星以及被冰層覆蓋的木星衛星木衛二上,以地質活動所產生的氫氣為生的產甲烷菌,可能會形成地下細菌生態系的主體。
  4. Localization underground target algorithm base on the best automatic curve fitter can survey velocity of electromagnetic wave in underground medium, and locate underground target. it ’ s virtue is small number of operation times. it ’ s shortcoming is subject to clutter

    基於自動最佳擬合曲線的波速測定和目標定位方法可以比較準確地計算出波速,計算出目標位置,優點是運算量小,缺點是容易受到雜波干擾的影響。
  5. First, on the base of investigating geleshan geologic environments, the author carefully analyzes them, studies their water storage structure, discusses the relationship of underground water dynamic changes and tunnel drainage by desiccation ; secondly, the author makes the dynamic analysis, regression analysis, routine hydrochemistry analysis, isotope analysis, so draws to guan - yin gorge anticlire east and west slot ' s karst developing features, alternated conditions underground water and supplying drain ways ; thirdly, by stating the fissuring ' s surveying data, the author calculates the seeping tensor

    作者在進行歌樂山地質環境調查的基礎上,仔細分析了大量觀測資料,研究其儲水構造,掌握地下水動態變化與隧道施工涌水的關系,及補給受降雨的影響情況。對隧道周圍的地下水進行動態分析、回歸分析、常規水化學分析以及同位素分析,得出觀音峽背斜東西翼槽谷的巖溶發育特徵,及地下水的循環交替條件、補給排泄途徑;統計分析裂隙測量數據,計算滲透張量。
  6. The nancha suspending - gay bridge of the changjiang road - bridge in jiangshu runyang, with a main span of 1490m, ranks first in china, third in the world. the north rivets, only 250m from the main stream of changjiang, have a tight liaison with the waterpower of it. especially, in this area, the face of rocks undulates a lot and exist fault - fabric. the soil there has apparent difference with the trend of water. the base - hole of north rivets can be named a super - deep one, with a 60m length, 50m widths, and 48m depths. the fence of the base takes advantages of the rectangular underground continuous wall structure and succeeds

    江蘇潤揚長江公路大橋南汊懸索橋,主跨1490m ,居中國第一,世界第三。該橋的北錨碇距長江幹流僅250m ,與長江水力聯系密切,錨碇區水文、地質情況復雜,表層淤泥質土及松軟粘土層較厚,基巖頂面起伏較大,且存在斷裂構造,土層具明顯的流變特性。北錨碇基坑為長60m 、寬50m 、深48m的矩形超深基坑,其基礎圍護在國內首次採用矩形地下連續墻結構,並獲得成功。
  7. Above ground, several stations are equipped with a base station antenna to cover their areas. below ground, communication is via leaky coaxial cables driven by radio base stations located in each underground station. as a result, interference at entrances to underground stations happens frequently

    3 .地面沿線部分由數個車站設置基地臺之天線電波涵蓋,地下車站每一車站皆有基地臺透過漏波電纜輻射涵蓋,因而地下車站出入口部分干擾常常很嚴重。
  8. The vibration problems in pumped storage hydroplant are outstanding, due to their high - velocity flow, high - speed units, etc. on the base of summarizing the development of inverse analysis methods, this paper proposed a dynamic inverse model for underground hydroplant was built, combining the modal analysis and inverse numerical computation

    點,提出採用實驗模態分析與動力反演分析相結合,以試驗模態與計算模態某種偏差為目標函數,建立通用的結構最優化動力反分析模型。引入改進的遺傳演算法,實現了其與ansys軟體的介面。
  9. The dissertation detailedly explains the engineering geology conditions of zhe gu mount tunnel area, and has researched the crustal stress development process and the regulation of distribution. according to mounts of site tracing investigations, author has researched the formation mechanism of wall rocks at zhe gu mount tunnel. on the base of engineer geology analysis, applying the modern support theory and construction conception of underground engineer, and combining with modern monitor technique and numerical simulation, has researched and discussed about support, forecast and information design - construct etc. three phase on large deformation " prevention

    本文詳細闡明了鷓鴣山隧道區工程地質條件,對隧道區地應力場演化過程及分佈規律進行了研究;基於大量的施工現場跟蹤調研,研究了鷓鴣山隧道圍巖大變形的形成機制;在工程地質分析的基礎上,運用地下工程現代支護理論和施工理念,結合現代監測技術和數值模擬方法,從大變形的支護、預測、信息化設計施工三個方面對大變形的防治進行了探討。
  10. Abstract : by establishing accurate mathematical model of underground gas storage, storage characteristics and permeating process can be described on quantity and therefore theoretical base of the underground gas storage optimum operation can be provided

    文摘:通過建立枯竭氣藏型地下儲氣庫的數學模型,數值模擬出儲氣庫儲氣的歷史過程,予測儲庫的儲存容量,研究儲庫注采動態特徵。
  11. Based on structure calculation of the pool wall, the top - cover of thin brick shell, pull beam and base plate of underground round - arch single - well - head thin brick shell, the paper proves that such a structure can bear load well and safely

    摘要通過對地下圓拱式單井口磚薄殼的池壁、磚薄殼頂蓋及拉梁和底板進行受力分析和結構計算,闡明了該種結構是一種受力合理、安全可靠的結構。
  12. Research on big cross section structure parametres in underground mine of gongchangling base on sls system

    系統的弓長嶺井下礦大斷面結構參數應用研究
  13. At the last, on the base of that, the author builds up 2 - d model ( modflow ) to simulate numerical value of surrounding underground water changes by tunnel water invasion, researches the effects on surrounding underground water system for tunnel drainage by desiccation, forecasts the restoring cases after the exclusion of water, at the same, analyzes the influences in underground water level and surface collapse by tunnel excavating

    並且在此基礎上建立modflow二維模型對隧道涌水引起周圍地下水變化進行數值模擬,研究隧道疏干排水對周圍地下水系統影響,進行模擬並預測堵水成功后水位的恢復情況,最後分析隧道對周圍地下水位以及引起的地面塌陷的影響。
  14. M01 _ minimap _ 08 = { there is an underground area of this base. likely to hold both reavers, reaver leaders, and slaves

    基地的地下區域.這可能有收割者和他們的領袖以及奴隸
  15. In this paper, based on upwards problems, the monitoring methods and monitoring systems of blast vibration are stated, and the wansongling tunnel blast engineering is taken as the subject investigated, the influence that the blast vibration by this tunnel digging act on the ground buildings and underground construction were monitored, and a great lot monitoring data were obtained, which established the practical base for this paper

    基於以上問題,本文簡述了爆破振動的監測方法及監測系統,並以萬松嶺隧道開挖爆破為研究對象,對其施工爆破的爆破振動對地表建築及地下工程施工的影響進行了監測,獲得了大量的監測數據,為論文的研究奠定了實踐基礎。
  16. Finally, this paper cites an example to provide the scientific base for the design great - section underground structures

    並對南京地鐵某站進行地震響應分析,為地鐵等大斷面地下結構的設計提供科學的依據。
  17. This thesis combined with the commissioned scientific research about ventilation model experiment of langya shan hydropower station ’ s underground houses, first make out the history, status, development trend and existent problem of ventilation and air condition technology application in underground hydropower station at home and abroad by indexing and checking the related large quantity technology references and engineering analysis. this establish a well base for study of the model experiment

    本論文結合本院承接的瑯琊山水電站地下廠房通風后續模型試驗這一委託科研課題,通過檢索、查閱大量相關科技文獻和工程調研分析,摸清了國內外地下水電站通風空調技術應用的歷史、現狀、發展動向與存在問題。為該項目模型試驗研究奠定了良好的基礎。
  18. After complete demolition, excavation and reconstruction, the huinan eastern shopping mall will have an underground parking lot with 120 parking places, a base which is six levels high, and a tower section on top of the base which is 23 levels high including a level for building equipment, for a total height of 29 stories

    規劃重建后的「精品商廈」為一幢主體高24層的塔樓帶六層裙房的高層建築, 1 - 6樓每層建面3000 , 8 - 24層,每層建面1500 。
  19. Gpr was applied in the detection and location of underground artificial concrete base at hanyang yuehu and civil air defense at a building site of qingshan in wuhan city

    摘要運用探地雷達對武漢市漢陽區月湖一建築場地下人工混凝土基礎以及青山區某公寓建築場地地下人防工程進行探測定位。
  20. Recognition underground metal target algorithm base on phase of target echo can recognize buried mental target. it ’ s shorting is too many false alarm

    基於目標回波峰值相位特徵的地下金屬目標識別方法可以比較準確地識別出金屬目標,缺點是虛警高。
分享友人