underground power plant 中文意思是什麼
underground power plant
解釋
地下電站- underground : adj 1 地(面)下的。2 隱蔽的,秘密的。3 (電影,報刊等)標新立異的,試刊的,試驗性而非正式的。4 ...
- power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
- plant : n 1 植物,草木 (opp animal); 草本;〈商用語〉樹秧,苗木。2 莊稼,作物,收獲;(植物的)生育。3 ...
-
Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project
溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。 -
The electricity design of 4 - star hotel of xu zhou hua mei mansion ( 29 stories on the surface and 2 stories underground, 60, 000m2 construction areas ) ( 2 ) the work - out of the electric equipment document for tenders of xin cheng heat - and - power plant. ( 3 ) the work - out of the feasibitity report of jeluk power palnt ( 2 125mw ) of pakistan
徐州華美大廈四星級賓館(地面29層,地下二層,建築面積6萬平方米)的電氣設計工作沛縣新城熱電廠電氣設備招標文件的編制工作巴基斯坦傑魯克電廠( 2 125mw )可行性研究報告的編制工作。 -
The hydraulic fracturing technology has been developed into a reliable and practical method to determine the in - situ stress slate of underground caverns, self - bearing capability of wall rock of high - pressure cavern and the high - pressure hydraulic permeability of rock mass, which has been widely used in the disposal of nuclear waste, the long and deeply - buried communication tunnels and the high - pressure caverns of hydraulic power plant
摘要水壓致裂技術現已發展成為確定地下洞室二維原地應力狀態、高壓洞室圍巖的自身承載能力以及巖體高壓透水性的可靠實用方法,並已經在核廢料處置、長大深埋交通隧道以及水電站高壓力洞室工程中得到廣泛應用。 -
Futuregen would be a near zero - emissions plant that converted coal into hydrogen, to power electric turbines, and carbon dioxide, to be pumped underground
「未來發電」計劃將實現建設接近零排放的電廠,在這里將煤轉化為氫,再轉換到渦輪發電並且產生二氧化碳,將二氧化碳封存在地下。 -
Lastly, the time series analysis and time series data mining system of sas / ets are used to conduct tendency forecasting of displacement of the longtan water power project underground plant observation tunnel rock
應用sas的ets時序分析與挖掘系統對龍灘水電站地下廠房模型洞的位移觀測資料進行了巖體的位移變化趨勢預測。 -
Fire control work for military facilities, underground parts of mines and nuclear power plant shall be monitored and administered by their competent units
軍事設施、礦井地下部分、核電廠的消防工作,由其主管單位監督管理。 -
This paper analyzed the feature of the power plant ' s pipe and link installation in the underground. the meanings and purposes what developed the power plant geographic information system was put forward
本文通過分析江西豐城電廠地下網管設施的特徵,提出了開發電廠地理信息系統的目的和意義。
分享友人