翻模 的英文怎麼說

中文拼音 [fān]
翻模 英文
rolling over
  • : 動詞1 (變換位置; 歪倒; 反轉) turn over; turn around; reverse 2 (移動物體尋找) rummage; search...
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  1. Under the ceaseless conflagration of lightning that flamed in the skies, everything below stood out in clean - cut and shadowless distinctness : the bending trees, the billowy river, white with foam, the driving spray of spume - flakes, the dim outlines of the high bluffs on the other side, glimpsed through the drifting cloud - rack and the slanting veil of rain

    這時候,天空中風雨閃雷交加,狂暴至極。閃電把天空也照亮了,把天宇下的萬物映襯得分外鮮明被風吹彎的樹木白浪騰的大河大片隨風飛舞的泡沫以及河對岸高聳的懸崖峭壁的糊輪廓,都在那飛渡的亂雲和斜飄的雨幕中乍隱乍現。
  2. Formwork construction of 100 m high concrete chimney shaft

    百米混凝土煙囪內井架翻模施工
  3. Constructing quantitative model with ordinary differential equations for the cell - cycle control system, it is appropriate to use ordinary differential equations ( odes ), because molecular diffusion, transcription, translation and membrane transport seem to be fast ( a matter of seconds ) compared with the duration of the cell cycle ( hours ). spatial localization of reactions can be handled by compart - mental modelling, in the spirit of pharmacokinetics

    對于這樣的細胞周期控制系統,應用常微分方程是適合的,因為比起細胞周期的時間(以小時計)來,分子擴散,轉錄,譯和膜運輸是很快的(以秒計應用藥物動力學的區域化型的方法,可以處理反應的空間分佈。
  4. Through this translation, european mathematicians got to know methods for calculating the areas of triangles, volumes of spheres as well as square and cube root

    通過這種譯,歐洲數學家開始接觸三角形的計算型,同樣也有關于球體,矩形和立方根的卷冊。
  5. Roll over protective structure ( rops ) is a device which installs on out of construction vehicle. the main functions are : when the vehicle rolling over. rops can prevent the vehicle from rolling over further, and reduce the possibility of rolling vehicle injures operator ; when the vehicle traveling on freezing soil. concrete and rock, it has large resist continuous impact ability ; when the vehicle overturning rops can support the whole vehicle. arrangement of falling object protective structure ( fops ) can block objects ( such as trees, rocks ) so that supply protection for operator. this problem is that research rolling over and falling objects protective structure of bulldozer by learning research condition of rops / fops and relative lay down international standard. on the base of theory analysis. detrudes counting formula of rops / fops deformation through founding mechanics analysis model of rops / fops at the stage of elasticity and plastoelastic. and finds a set of feasible nonlinear finite element analysis counting. lt calculates rops / fops plastoelastic deforma variable of 320hp bulldozer, bulldozer has been carried out by optimizing design method

    其主要功能是:當車輛滾時, rops能刺入未凍土壤而阻止車輛的進一步滾,降低滾的車輛對系著安全帶司機軋傷的可能性;保證rops在碰撞和沖擊變形不大的地面(如凍土、混疑土上、巖石)時,能具有相當大的抗連續沖擊能力;當車輛已經處于顛覆狀態時,已經變形的rops應能支撐住整車。落物保護裝置(簡稱fops ) ,其構件的布置方式要能遮蔽墜落的物體(如,樹木、巖石等) ,以便對司機提供適當的保護。本課題主要通過了解國內外有關對rops fops的研究情況和有關國際標準的制定,對大型推土機傾和落物保護裝置進行研究,在理論分析的基礎上,通過建立rops fops的力學分析型,推導彈性、彈塑性階段rops fops變形的計算公式,建立一套可行的rops fops的非線性有限元分析計算方法。
  6. Construction of turnover formwork in reinforcement chimney hydraulic lifting frame

    鋼筋混凝土煙囪液壓提升架翻模施工
  7. The whole thesis is made up of the following five chapters : chapter one is the preface. it shows the importance of studying the problems of generation module in interlingua - based machine translation system. and then it discusses the problems we concerns - lexical selection in target language generation module

    全文共分為五章:第一章是緒論,概述了機器譯研究的重要意義以及基於中間語言的機器譯系統中生成塊研究的重要性;提出了本文的研究課題? ?生成選詞問題,並簡要比較了不同系統對該問題的處理方式:最後列出了本文的工作要點。
  8. To deal with the difference on operating system level, this paper designs a thread - level algorithm based upon priority inheritance protocol to prevent priority inversion. a dynamic priority mapping and scheduling algorithm to achieve strict order is also presented. through analysis of multi - threaded execution order under fixed priority scheduling model, a multithreaded programming model with totally predicable execution order is proposed

    針對各種操作系統的差異,本文提出了基於優先級繼承協議的線程級防優先級轉演算法,提出了能夠嚴格保序的動態優先級映射方法及相關的調度演算法,通過研究固定優先級調度下的多線程執行順序問題,本文還提出了一種執行順序可預測的多線程程序設計式。
  9. The emphasis is on the rale based technology and statistical based technology

    其中重點討論了基於統計的水情電報型。
  10. The results show that the ass can effectively reduce the roll angle and roll angle acceleration in non - linear driving and improve the side tumbling stability

    擬分析得到主動懸架系統使得汽車在彎道行駛時的側傾角有效值下降了92 . 8 % ,側傾角加速度有效值下降了78 . 2 % ,側因子有效值下降了92 . 6 % 。
  11. Numerical study on flanging of v - shaped sheet metal part

    型件邊成形的數值
  12. First, mr dawkins wants to subvert the mode of transmission between parent and child

    首先,道金欲推父母同子女間傳輸信息的式。
  13. The thematic progression in english - chinese translation

    英漢譯中的主位推進
  14. A view on translator ' s mind in translation process

    譯過程中譯者的思維式透析
  15. Lexical, conceptual memory model hypothesis of bilingualism and translation

    概念記憶式假設與
  16. Formwork turnover construction of supper high concrete chimney

    超高混凝土煙囪門式鷹架翻模施工
  17. Concrete pylons are adopted for the fengdu yangtze suspension bridge, and normal construction methods for the pylons include slide formworks, turning shutters and climbing formworks. climbing formworks with assembled steel - pipe scaffolding is a newly - developed technique for this bridge. it causes saving of the steel skeleton for construction of the pylons. by utilizing regular simple rods and parts, construction progress is fast and the quality is good

    豐都長江大橋懸索橋採用混凝土橋塔,其常規的施工方法有滑翻模和爬等幾種,本橋施工中採用了新開發的鋼管爬升架倒新工藝,不僅節省了為橋塔施工而設計的橋塔型鋼骨架,而且利用常規的簡易桿件、施工速度快,施工質量好。
  18. Construction technology of hydraulic lifting and turning over formwork for concrete chimney 240 m high

    高鋼筋混凝土煙囪液壓提升翻模施工技術
  19. Then the rp model is used as a positive mould to build up a silica gel negative mould, the negative mould is sent to the factory to manufacture ti - 6al - 4v alloy articular cartilage through ordinary mould - melted founding process

    具經拋光后,用硅膠翻模,最後澆注臘,在西北有色金屬研究院進行精密鑄造,得到鈦合金廠人工關節軟骨。經後期拋光等處理,得到可用於臨床的人工關節軟骨。
  20. It is necessary to study the construction technology of concrete cable bent towers. the dissertation introduces construction sequence, construction methods ( supporter construction, slip - form construction, climbing formwork and turn - over formwork construction ), anti - overturning measures of the tilted tower, crossbeams " construction and its bracing structure

    本文主要介紹了混凝土塔柱的施工順序、施工方法(支架法、滑法、爬法和翻模法) 、傾斜塔柱的施工抗傾措施、橫梁施工及支撐系統。
分享友人