upstream state 中文意思是什麼

upstream state 解釋
上游國家
  • upstream : adv. 向上游,溯流。adj. 1. 溯流而上的。2. (石油工業等)上游的,和石油的勘探、開采及輸送到起運港口有關的〈石油工業此後的提煉等過程則稱為下游(downstream)產業〉。
  • state : n 1 〈常作 S 〉國,國家;〈通例作 S 〉(美國、澳洲的)州;〈the States〉 美國。2 國務,政權,政府...
  1. It is found that the liquid kerosene of injection upstream cavity could finish the process of atomization and evaporation in short distance, and enter into cavity through convection. aft wall is the primarily area of flame holding in cavity, and the only area when near the lean blowout limit, flame in area of fore wall are spread from it. cavity shear layer in reaction flow angle greatly to the main flow direction, and couldn ’ t reattach to aft wall anymore, it appears great difference in characteristics of cavity flowfield between non - reaction and reaction state

    研究發現:凹腔上游噴注的液體燃料能夠迅速霧化、蒸發,並在較短距離內依靠對流輸運過程進入凹腔內部;凹腔後壁始終是凹腔火焰駐留的主要區域,在貧油極限時,也是唯一區域,並存在明顯的火焰由後壁向前壁的傳播過程;燃燒狀態下的凹腔剪切層以較大角度向下游主流發展,不再附著于凹腔後壁,與冷流中的凹腔流場特徵相差較大。
  2. Combined with the significant project - gongboxia hydro - power station construction, emphasized on construction during flood period of power station construction period, the climate character of the upstream of yellow river basin and the practice operation state of cascade reservoirs are analyzed, some problems in construction during flood period such as flood propagation time, interval flood discharge forecast, construction risk, flood period pre - alarm and longyangxia reservoir ' s function on construction of gongboxia are also studied, with an aim at presenting real interval flood forecast scheme and dispatching method, so as to provide technological support for gongboxia hydro - power station construction period

    本論文結合國家重點工程項目?公伯峽水電站的建設,以電站建設期施工渡汛為研究重點,從實施出發,分析黃河上游氣候特性和梯級水庫群的實際運行狀況,對施工渡汛中的主要問題?洪水流達時間、區間洪水預報、渡汛風險、汛期預警、龍羊峽水庫在渡汛中的作用等進行了比較全面深入的研究,目的在於提出可用於實際的區間洪水預報方案和調度方法,為公伯峽水電站施工期建設提供技術支撐。
  3. According to the geological conditions of baise project, erosive bands and joint fissures, f6 fault and grout curtain are fully simulated to establish 3d numerical model of the dam and its foundation. 3d non - linear fem is used to analyze the stress and strain and to appraise the operation state of both the dam and it ' s foundation under different operation conditions. by overloading the upstream water level and reducing rock strength parameter, the dam foundation ' s degradation process is simulated and the damage pattern and paths are determined, and finally the safety factor is determined

    2 、根據百色的地形地質條件,充分模擬了蝕變帶、節理裂隙、 f6斷層、灌漿帷幕等,較為真實地建立了壩體與地基相互作用的整體三維數值模型;採用有限元法對壩體及壩基在不同工況下的應力應變狀態開展分析,評價各工況下壩基的運行狀態;而後採用超載法和綜合法對大壩穩定性進行分析,模擬壩基的漸進性破壞過程,從而得到壩基在超載和強度下降過程中的破壞模式和破壞發展路徑,最終確定壩基超載安全系數和綜合安全系數。
  4. Firstly, the displacement, stress, strain fields and the working state of dam body and foundation are evaluated by fem. by overloading the upstream water level and reducing rock strength parameters, the failure process of dam foundation is simulated and the failure mode and paths are determined. the results show that when overload method is used, damaged area develops from up - stream to down stream with failure front stays near the interface between dam body and bedrock

    首先採用非線性有限單元法對壩體及壩基在不同荷載工況下的變位、應力應變狀態展開分析,評價各工況下壩基的運行狀態,而後採用超載法和綜合法對大壩穩定性進行分析,模擬壩基的漸進性破壞過程,追蹤巖體破壞狀態的發展演變過程,從而得到壩基在超載和強度下降過程中的破壞模式和破壞發展路徑。
  5. The formation of the scoured pits is related with such factors as the unstable flow velocity and the unstable flow state caused by the circumfluence in the cross direction, the upstream circumfluence and the circle flow around the embankment

    沖刷坑的形成與橫向環流、上游迴流和繞流丁壩造成流速及流態不均勻等因素有關;根石走失與根石在水中的穩定性和河床性質及壩腳附近沖坑有關。
分享友人