v-section 中文意思是什麼

v-section 解釋
三角槽形斷面
  • v :
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  1. Medico - surgical equipment. implants for surgery. intramedullary nailing systems. part 1 : intramedullary nails with cloverleaf or v - shaped cross - section

    外科醫療設備.外科植入物.髓內插釘術系統.第1部分:苜蓿葉式或v型剖面的髓內釘
  2. Fluid noise mainly comes from out put pulsation of rate of flow, the main reason of out put pulsation of rate of flow is the instant high pressure return flow that obturation cubage produced when the big round curve pressure transition. the v trough on the port plate can reduce the fluid noise. in this paper, the author based on the acting of dam a river and condensability of liquid and used matlab language as tool to calculate the v trough on the original port plate and drew out the p - t diagrammatic curve and analyzed its shortcoming and improved the design of original v trough and got that the best size of its angle was 12. 3 and its length was 5mm and the cross section was an equilateral triangle

    流體噪聲主要來源於輸出流量脈動,造成輸出流量脈動的主要原因是閉死容積在大圓弧段壓力切換時產生的瞬時高壓迴流,在配流盤上開設v型尖槽可降低因高壓迴流而引起的流體噪聲,本文以截流作用和液體的可壓縮性為理論依據,以matlab語言為工具,對原配流盤上的v型尖槽進行了理論計算,繪制出p - t圖線,分析了它的不足,並對原有v型尖槽進行了優化設計,得出了v型尖槽的最佳幾何尺寸:配流盤平面上的v型尖槽的兩邊的夾角為12 . 3 ,槽長5mm ,槽的橫截面為等邊三角形。
  3. The greatest stress is found at the location on the cross section where v is the largest.

    最大應力出現在橫截面上V為最大的地方。
  4. Note : this section must be completed. the submittal of a resume or c. v. in lieu of completing this section does not fulfill the requirement

    備注:請務必填寫此部分。僅以履歷表或簡歷替代填寫本部分並不符合要求。
  5. More will be said about this in section v.

    關于這一點,在後面第V節中還要更詳細敘述。
  6. Three kinds of results are obtained by simulation calculating the two models : the composed vector diagrams of the axial velocity ( v ) and the radial velocity ( vr ) at the different times in the symmetry section ; diagrams of curves of the velocity vector ( v ^ ) and ( vr ) at the different times in the different sections ; diagrams of the secondary flow vectors at the different times in the different sections

    我們對兩種不同直徑的s型血管進行了有限元模擬計算,得到三種結果:在對稱面內不同時刻的軸向速度v _和徑向速度v _ r的合成矢量;在不同截面不同時刻的速度分量v _和v _ r的曲線圖;在不同截面不同時刻的二次流的矢量圖。
  7. Then river width increased and the intensity of deep point lowing and bed material coarsening decreased and water level lowed continuously. so the bed form changed toward to u type. the bed regulation is realized through sediment silting in different parts in cross section during silting period and the deformation of bed form changed from broad u type channel to narrow and deep v type channel

    研究表明,河道在持續沖刷前期深泓點及水位下降與河床粗化同步發展,河床向v型發展;沖刷後期深泓點下降、河床粗化減弱,河道展寬增大,水位繼續下降,河床向u型發展;在以淤積為主時期的調整,是通過斷面不同部位的淤積來實現的,但都是由u型較大河槽向v型窄深小槽發展。
  8. The thesis consists of four sections. in section one, we introduce some background of the topic, in section two we review some basic and recent results about the structure and hierarchies of the computably enumerable degrees which are closely related to our topic - the algebraic structure of the plus cupping turing degrees, in section three, we outline the basic principles of the priority tree argument, one of the main frameworks and tools of theorem proving in computability theory, and in section four, we prove a new result concerning the algebraic structure of the plus cupping turing degrees that there exist two computably enumerable degrees a, b such that a, b ? pc, and the join a v b of a and b is high

    本篇論文分為4個部分:第一部分介紹了這個領域的一些背景知識;第二部分主要回顧了前人在研究可計算枚舉度的結構和層譜時所取得的一些基本和最新結果,這些結果與我們的主題?加杯圖靈度的代數結構密切相關;在第三部分中,我們概要的描述了優先樹方法的基本原理,此方法是可計算性理論中定理證明的一個重要框架和工具;第四部分證明了一個加杯圖靈度代數結構的新結果:存在兩個可計算枚舉度a , b ,滿足a , b pc ,而且a和b的並a b是一個高度。
  9. Section 240a - reports to the congress section 240b - prohibition on noncompetitive awarding of insurance contracts on opic supported exports title v - disadvantaged children in asia

    成員國大會是協會的最高權力機構,由每個成員國各派一名代表組成,至少每年開一次大會。
  10. In the second section, three ( 2 co2 ) scenarios only considering climate change alone ( c scenario ) were generated first, using outputs of the giss, gfdl and ukmo gcms, combined with the baseline. then, climate change scenarios including change in climate variability ( c + v scenario ) were produced, based on 3 hypotheses and the weather generator ( wgen ) in dssat. finally, the ceres - wheat model was run under both the ( c + v ) scenarios and the baseline, and the combined effects of climate change and its variability with doubled co2 on whiter wheat production in the studied region were assessed, based on the results simulated comparison

    在上述第2部分,首先利用baseline和國際上通用的3種大氣環流模型( gcms )即giss 、 gfdl和ukmo的有關網格點值,生成了研究區域3種不考慮氣候變率變化的( 2 co _ 2 )氣候變化情景(以下簡稱c情景) ;然後,提出了未來氣候變率可能變化的3種假設,並應用dssat (農業技術轉化決策支持系統)中的wgen (隨機天氣發生器) ,分別生成了研究區域( 2 co _ 2 )條件下兼顧氣候及其變率的氣候變化情景(以下簡稱c + v情景) ;再后,在上述( c + v )情景下分別運行ceres - wheat (作物-環境資源綜合系統-小麥) ,還考慮了大氣co _ 2濃度的直接影響,並與baseline條件下ceres - wheat的模擬值進行比較,在此基礎上評價了( 2 co _ 2 )條件下氣候及其變率變化對研究區域冬小麥生產的影響。
  11. Belt drives - v - ribbed belts, joined v - belts and v - belts including wide section belts and hexagonal belts - electrical conductivity of antistatic belts : characteristics and methods of test

    帶傳動多楔帶聯組v帶及包括寬v帶六角帶在內的單根v帶抗靜電帶的導電性:要求和試驗方法
  12. Electromechanical switches for use in electronic equipment - part 4 : sectional specification for lever toggle switches - section 2 : detail specification for one pole, two pole, four pole, sealed lever toggle switches, 277 v a. c. maximum, 30 v d. c. maximum, 20 a maximum electrical rating

    電子設備用機電式開關.第4部分:杠桿操縱撥動開關的分規范.第2節:最大交流電壓為227伏最大直流電壓為30伏最大電流為20安培的額定電功率,一極二極四極密封杠桿操作撥動開關詳細規范
  13. Where pursuant to section 19 ( 3 ) ( c ) ( iv ) or ( v ) or ( 4 ) ( ii ) ( b ) ( ii ) a data user may comply with a data access request by supplying a copy of the personal data to which the request relates in one of 2 or more forms, the data user shall not, and irrespective of the form in which the data user complies with the request, impose a fee for complying with the request which is higher than the lowest fee the data user imposes for complying with the request in any of those forms

    如依據第19 ( 3 ) ( c ) ( iv )或( v )或( 4 ) ( ii ) ( b ) ( ii )條,資料使用者可藉提供查閱資料要求所關乎的個人資料的復本,依從該項要求,而復本是採用2種或以上的形式中的一種的,則無論該資料使用者依從該項要求是採用何種形式,他為依從該項要求而徵收的費用,不得高於他為採用任何形式依從該項要求而徵收的最低費用。
  14. Gin is the abbreviation for grouting intensity number. it is showed by the product of the final grouting pressure p ( unit : mpa ) on the grouting section and the grouting volume v ( unit : l / m ) on every one meter of the grouting section, which means the energy consumed on every one meter of grouting section. according to gin method, if during the grouting construction, same energy is consumed on every grouting section, i. e. gin keeps to be a constant, an approximately uniform impervious curtain can be obtained

    Gin ( groutingintensitynumber )即灌漿強度值,它用灌漿孔段上最終的灌漿壓力p ( mpa )和單位灌漿段長度漿液灌注量v ( l / m )的乘積表示,其含義為單位灌漿段上消耗的能量, gin法灌漿認為在灌漿施工中,保持各灌漿孔段上消耗一致的能量,即保持gin為常數,便可形成一道大致均勻的防滲帷幕。
  15. Welcome to th v third section. i am 朱 建 智. let me 160448526 ntroduce our business function et nd duties

    歡迎到第三課,我是朱建智。我來介紹我們的業務職掌。
  16. Section v conducts event study to see how the stock market reacts to the announcement of block share transfers

    第五章通過事件研究來觀察證券市場對大宗股票轉讓的反應。
  17. In this way, when obturation cubage leave absorb oil cavity it connects the eduction oil cavity with the v trough and with the increasing of the turning angle, the size of the cross section of v trough become bigger and bigger, which make the pressure between the cavity of two blades much higher and higher, and until it completely connects the eduction oil cavity, it reaches the pressure of the eduction, and it can effectively reduces the fluid noise caused by high pressure return flow

    這樣,當密閉容積離開吸油窗口之後,通過v型尖槽逐漸與排油窗口連通,隨著轉角的增加, v型尖槽通流截面積逐漸增大,這就使兩葉片間容腔內的壓力逐漸升高,直至完全接通排油窗口時,才升壓達到壓油腔的壓力,這樣可以有效地降低因高壓迴流而引起的流體噪聲。
  18. The section of castle peak road v new ting kau from its eastern junction

    新汀九段由其與青山公路
  19. Based on stratigraphic sequence theory and analysis of seismic section. well - log and core rocks, the framework of sequence stratigraphy is built. the strata of bayianhua group can be divided into 5 third - order sequences, sequence. sequence i and sequence ii were " associated with aershan formation. sequence hi was associated with tenggeer formation. sequence iv and v were associated with duhongmu formation

    將白音查干凹陷巴顏花群劃分為五個層序:阿爾善組一段為層序,阿爾善組二段為層序,騰格爾組為層序,都紅木組一段為層序,都紅木組二、三段為層序。
  20. The features of these sequences arerbefore sequence i deposited during the rapid subsidence of the depression, the range of the sediment is limited. sequence ii is the first series of source and reservoir rocks of the depression. there are regional unconformity at the bottom of the sequence iii. the rock type are variety. this sequence is evaluated as good source rock, sequence iv is associated with the first section of duhongmu formation, thick mudstone at the bottom and the thick single sandston are the main rock type. this sequence are evaluated as good source rock and reservoir. sequence v associated with the second and the third section of duhongmu. which is mainly mudstone and can be regional capping rocks

    層序對應于阿爾善組二段,為深色泥巖與砂礫巖不等厚互層,是本區的第一套烴源巖和儲集層,可以作為本區儲層。層序對應騰格爾組,此時凹陷擴張,沉積層底部具有區域性的沖刷面,巖性變化大,是較好的生油層。層序對應都紅木組一段,下部泥巖發育,單砂層較厚,是主要的生油層和儲層。
分享友人