wall of nail 中文意思是什麼

wall of nail 解釋
甲廓
  • wall : n 1 墻壁;(石、磚等的)圍墻;城墻。2 (形狀、用途)像墻壁的東西,障壁;土堤,堤防。3 (礦井、容...
  • of : OF =Old French 古法語。
  • nail : n 1 指甲 爪;喙甲。2 釘。3 納爾〈舊量布尺度名 約合5 715cm〉。vt 1 敲釘 釘住 (on to)。2 〈口語〉...
  1. Between the corner of a wall and the plank must be remained 1cm to 1. 5cm to take the expansion and contraction crevice, the plank and the ground is fixed with the nail, dont permit to join with the glue water

    墻角與木板間需留1至1 . 5作為伸縮空隙,板條與地面用釘子固定,絕不允許使用膠水膠接。
  2. The sentry box of the activity fully use internal wall panel and one s own intensity of the roof boarding, through draw nail, bolt, connection nailed to make up finalize the design the prefab system. construction swift, being portable, especially suitable for urban municipal administration, entrance guard room, service department, etc

    活動崗亭是通過充分利用夾芯墻板及屋面板的自身強度,通過拉釘螺栓自攻釘將鋼結構底座墻面夾芯板和屋面板連接組成的房屋系統。
  3. The application of soil nail wall in base pit underprop safeguard

    基坑支護中土釘墻的應用
  4. This is a true story happened in japan, to decorate room, someone removed wallboards. in general, the structure of japanese style building is of double layers wall covered by lime, and the inside is empty. when he removed the wallboards, he found one gecko was fixed there, one nail from outside board tacked its tail

    在日本,發生了一件千真萬確的事:有人為了裝修家裡,拆開了墻壁日式住宅的墻壁通常是中間架了木板后,兩邊批上泥土,其實裏面是空的。他拆墻壁的時候,發現一隻壁虎被困在那裡,一根從外面釘進來釘子釘住了那隻壁虎的尾巴。
  5. Homeproductseven roof flat roof fully use internal wall panel and one s own intensity of the roof boarding, through draw nail, bolt, connection nailed to make

    是通過充分利用夾芯墻板及屋面板的自身強度,經過拉釘螺栓自攻釘的連接而組成的定型活動房屋系統。
  6. The study results reveal some laws : ( 1 ) two failure modes exist in different obliquity slope and influence the internal force of soil nailing ; ( 2 ) the connection between face shield and soil nailing determines the distribution of the axial force along length ; ( 3 ) the influence of face shield involves its connection with soil nailing and its stiffness on soil nailing wall ; ( 4 ) the transversal effect of soil nailing depended on the joint of nail head is little ; ( 5 ) the maximum axial forces of other soil nailings except the first soil nailing increase gradually with excavation

    研究表明: ( 1 )素土坡隨著坡角的變化,存在兩種破壞方式,破壞方式不同,土釘受力狀態不同; ( 2 )土釘和面層的連接方式決定著土釘長度方向上的軸力分佈形態; ( 3 )面層主要通過面層與土釘的連接和面層的本身剛度兩個方面對土釘內力和墻體變形產生影響; ( 4 )土釘橫向抗剪抗彎作用的發揮程度和土釘釘頭的連接方式有關,但作用不大,實際設計時可以忽略其影響; ( 5 )隨著坡體的開挖,第一排土釘的最大軸力變化不大,其它土釘的軸力都穩步增加。
  7. I, at least, had nothing more to do : there were my trunks, packed, locked, corded, ranged in a row along the wall of my little chamber ; to - morrow, at this time, they would be far on their road to london : and so should i, - or rather, not i, but one jane rochester, a person whom as yet i knew not. the cards of address alone remained to nail on : they lay, four little squares, in the drawer

    我的箱子已收拾停當,鎖好,捆好,沿小房間的墻根,一字兒擺開,明天這個時候,這些東西會早已登上去倫敦的旅程,還有我如蒙上帝恩允或者不如說,不是我而是一位我目前尚不認識的,叫作簡羅切斯特的人,只有地址標簽還沒貼上,那四個小方塊仍躺在抽屜里。
  8. Based on analysis of the characteristics of the composite soil nailed wall, simulating the soil nail, concrete layer, deep mixing pile and step excavation, a model is established to calculate the deformation of the wall, compiled simple and applied program of one dimension fem ; according to the field test data and the calculated data by the fem software this paper has developed, the design method and deformation of the wall in xi ' an area is discussed. the shape of destructive sliding surface of the wall in loess strata in xi ' an area with deep groundwater is gotten. finally the lateral deformation distribution and the experiential formula to predict maximal horizontal displacement of the composite soil nailed wall are given

    針對復合土釘墻構造的特點,建立了模擬復合土釘墻受力變形的一種計算模型,該計算模型可對土釘、面層、深層攪拌樁以及分層開挖等進行簡化模擬;編寫了簡單實用的桿系有限元程序;結合工程實測資料及有限元法分析的結果,探討了西安地區的土釘設計以及復合土釘墻的變形規律,得出了西安地區一般黃土在無地下水時的破壞滑動面形狀,復合土釘墻的側向變形曲線以及計算復合土釘墻最大水平位移的經驗公式。
  9. With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure

    通過分析比較,論證了對數螺旋線型比圓弧形作為邊坡的假設滑裂面具有較多的工程優點,並為此編制了一個採用極限平衡法分析土釘支護的fortran語言程序,以此作工具對滑裂面的后移、土釘錨固段的超長、土釘總力的大小等方面作了研究,得出了有關土釘的長度與邊坡的坡角、坡高、土體力學參數的關系、土釘總力與庫侖土壓力間的關系等結論;採用大型通用有限元數值分析程序ansys分別對採用土釘支護的一階邊坡、二階邊坡進行分析,重點是研究各排土釘的軸力分佈規律、開挖方式及原始邊坡形態對土釘的軸力的影響、上下階邊坡在土釘軸力方面的相互作用,得出了有關第一排土釘的設計問題、不同類型的土體應適用於特定的開挖方式、原始開挖出的邊坡形態對一些類型坡體的邊坡土釘支護有較大的影響而對另外一些影響不大、二階邊坡臺階寬度的合理確定、二階開挖及支護比一階時具有較多的工程優點等結論;通過土壓力分析對朗肯、庫侖兩種經典土壓力理論的區別與聯系、坡面傾斜及墻背有摩擦時的坡面豎向應力分佈、面板背土壓力的分佈形態作了研究,得出了邊坡支擋土壓力受坡體內部穩定與坡面局部穩定兩個方面的影響、土釘支護面板背土體中卸荷拱的存在對面板受力有利等結論。
  10. The application of soil nail wall in base pitprop safeguard

    淺述土釘墻施工技術在基坑支護中的應用
  11. Laughter. that s sort of like trying to nail jello to the wall. laughter

    到下一世紀中葉,中國將超過美國成為全球最大的溫室氣體排放國。
  12. Fifteen degree or so of nail and anchor inclination is the optimized. some certain value of nail space is proposed by which soil nailing structure and earth nail wall can be differentiated. the method to analyze the gravity retaining wall is applied to earth nail wall

    建議土釘和錨桿傾角採用15左右為宜;當土釘間距小於某一值,或土釘密度大於某一定值時,土釘支護形成重力式擋土墻,即土釘墻,此時可以採用重力式擋土墻的分析方法對土釘支護進行分析。
分享友人