water injection well 中文意思是什麼

water injection well 解釋
注水井
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • injection : n. 1. 注射。2. 注射劑,注射液,針藥,灌腸(藥)。3. 充滿,注滿。4. 【醫學】充血。5. 【機械工程】噴射。6. 【宇宙空間技術】(衛星等的)入軌,射入軌道,射入軌道的時間[地點]。
  • well : n 1 井。2 泉水;源頭,來源。3 坑,穴,凹處;【礦物】礦井,豎坑;【軍事】(地雷的)井坑;【建築】...
  1. Based on the development feature analysis, this paper studies thoroughly the reservoir flood feature and remaining oil distribution through the microstructure, sendimentary phase, reservoir heterogeneity and well control, and proposes the comprehensive adjustment based on the injection and development well net structure and improvement the result of the research is obvious with the production degression rate from 9. 14 % of 1997 to present - 1. 46 %, and water rate from original 0. 33 % to present 0. 16 %. in summary, the research idea, method and new achievement of the thesis provide a scientific geological basis for the oilfield development improvement

    在對本區開發歷程和開采特徵分析的基礎上,從微構造、沉積微相、儲層非均質性、井網控制等方面深入地分析了油藏水淹特徵及剩餘油分佈規律,提出了以完善注采井網、調整注采結構為目的的綜合調整措施,已見到了明顯的效果:油田遞減由1997年的9 . 14降至目前的- 1 . 46 ,綜合含水上升率由原來的0 . 33降至目前的0 . 16 。
  2. Experimental studies on s1a - 02 gas turbine with water injection into compressor interstage / inlet as well as that on turbocharger self - loop test rig with inlet water injection are introduced. test results are in good accordance with simulation results, wet compression can lower compression work and increase engine power output so engine performance is enhanced, if engine power output is not changed, efficiencies of compressor and this engine become higher and turbine inlet temperature and fuel consumption become lower and if keeping t4 the same as that before wet compression is used, efficiencies become furthermore higher and engine power output increases greatly

    實驗結果和計算結果同樣表明:濕壓縮減少了壓氣機所消耗的壓縮功,增加了燃氣輪機的輸出功率,提高了燃氣輪機性能,如果保持發動機輸出功率恆定,濕壓縮可以提高壓氣機和整個燃氣輪機機組的效率,與此同時,渦輪進口溫度t _ 3 ~ *和燃油消耗率下降;如果保持渦輪排氣溫度t _ 4 ~ *恆定,壓氣機和燃氣輪機機組效率進一步提高,燃氣輪機輸出功率增加。
  3. In order to solve corrosion and heave scale deposit of water injection pipeline in zhongyuan pucheng oilfield 2. 5inch tbs2510ij glass fiber reinforced plastic pipe was used as water injection peip in two single well respectively in decemher of 1997 and january of 1998. its application results in good effect and is worth being populated

    總結在黃土高原儲罐基礎施工中處理瀝青砂墊層裂紋和凹凸度超標的實踐經驗,分析了缺陷成因,提出了處理和預防措施,實施效果良好。
  4. Recommended operational method for preventing of clay - swelling and fine - migration in acidizing of water injection well

    注水井酸化中粘土防膨與微粒防運移工藝規范
  5. To solve some questions about oil production declining quickly, production and injection patterns are imperfect, the low degree of reserves control, and the injection water not enough in injection well, we have taken measures such as strengthen the geologic integrated research, drill extension well and adjustment well, strengthen water injection system, and optimize fracturing techniques, which has improved reservoir development effect

    為了解決產量遞減快、注采井網不完善、儲量控製程度低、注水井欠注等問題,採取加強地質綜合研究、鉆擴邊井和調整井、強化注水系統和優化壓裂工藝等措施,有效地改善了油藏開發效果。
  6. The case study shows the reason that for low permeability reservoir, oil well and water injection well should be spaced where natural fractures are developed in order to reach helter production response

    計算實例從理論上說明了低滲透油藏中,油水井部署在天然裂縫發育處開發效果較好的原因。
  7. The method for plotting chart on pressure - loss curve through choke of water injection well

    配水嘴嘴損曲線圖版製作方法
  8. ( 5 ) the water circulation system reach a stable state after a year when the exploitation of hdr. namely, there a fixed stress gradient from injection well to production well keeping the normal function, and the stress gradient is higher nearby the injection well, reaching to 43. ompa / km, but the stress gradient is only 10

    ( 5 )高溫巖體地熱開發的水循環系統在一年後變的穩定,即從注入井到生產井有固定的壓力梯度維持系統的運行,而且在注入井附近區域的壓力梯度較』大,達到43 . ompa / km ,中間區域的壓力梯度僅為10 . 7mpa / km 。
  9. Research on foamed acid for removing water injection well stemming

    注水井泡沫酸解堵研究
  10. The jiangsu decoration industry limited company has the abundant technical force and the advanced mechanical device, has each kind of professionals 200, has the large - scale plate cutter, the booklet bender, the completely automatic pipe bending machine, the lathe, the punch press, drills washes the bed, the injection molding machine, rolls models machine as well as encapsulates the assembly line, the static electricity spurts the creep water line, the rubber brick assembly line

    江蘇寶星實業有限公司擁有雄厚的技術力量與先進的機械設備,有各類專業技術人員200餘名,擁有大型剪板機、折彎機、全自動彎管機、車床、沖床、鉆洗床、注塑機、滾塑機以及包膠流水線,靜電噴塑流水線,橡膠地磚流水線。
  11. To some of injection wells which couldn ' t finished their proration water injection rates in low permeability reservoirs, through the technological innovation, jianghan oil region has conducted boosting pres sure for water injection on well groups, and has obtained good effects in oilfield increment oil production and stable oil production

    摘要江漢油區對低滲透油藏中完不成配注水量的部分注水井通過工藝技術革新,進行井組增壓注水,在油田增產穩產中取得了良好效果。
  12. 3, carry out detailed numerical simulation and analysis for heat extraction of deep - seated hdr based on the tengcong prefecture, reach the major variety rule of rock mass stress, temperature, fracture width depending on the heat extraction. ( 1 ) in the hot dry rock geotherraal energy extraction system, transportation of energy and flow of water arise mainly through the fracture, the lower temperature water attain the high temperature from the injection well to production well through conduction convection and take away the thermal from wall rock

    3 、認真地對騰沖高溫巖體地熱開發進行了數值模擬計算和分析,得出了地熱開發過程中巖體應力、溫度以及裂縫寬度隨地熱提取的變化規律等重要結論: ( 1 )在高溫巖體地熱開發系統中,能量的運移、輸送與水的流動主要通過裂縫面發生,注入的低溫水在流到生產井的過程中,發生傳導、對流、吸收圍巖熱量,達到升溫的目的。
  13. Moreover, the logging interpretation model of reservoir parameters is established based on the data of the 14 cored wells, and the various reservoir parameters are calculated based on the secondary digital process of log data of 388 wells within the area the petrophysical feature of reservoir rock, the distribution of reservoir parameters and reservoir heterogeneity, as well as their variability law during water injection, are defined quantitatively

    以14口取心井資料為基礎,建立了參數解釋模型,並對全區388口井進行了測井資料二次數字處理,求取了各類儲層參數。對儲層的宏觀非均質性、微觀孔喉結構及滲流特徵進行了量化描述,並研究了注水開發過程中儲層物性參數的變化規律。
  14. Profile modification technology and result evaluation in water injection well

    注水井調剖工藝及效果評價
  15. This zone has the features of poor property, poor communication and low energy, and pressure is not affected by water injection well

    其特點是物性差、連通性差、能量小和壓力不受注水井影響。
  16. This software is applied in a water injection well in kelamayi oilfield, whose computing results is approximately consistent with practical data

    把該軟體應用到克拉瑪依油田某口注水井中,其計算結果與實際數據吻合得很好。
  17. After oilfield is put into development by water flooding, the water injection system would be easily to form scaling, which seriously affects the operation of the surface water injection system and the water absorbability of the water injection well

    摘要油田投入注水開發后,注水系統容易結垢,嚴重影響地面注水系統運行和注水井吸水能力。
  18. Application of boosting pressure for water injection on well groups of low permeability reservoirs in jianghan oil region

    井組增壓注水在江漢油區低滲透油藏的應用
  19. But at present, the technology of boosting pressure for water injection on well groups still has some problems, and it should be improved in the production practice unceasingly

    但目前井組增壓注水還存在一些問題,應在生產實踐中不斷改進技術。
  20. They ate suitable for household well water pumping, car flushing, water injection supplying, garden irrigating etc

    可用於水井抽水,花園噴灑以及賓館,公寓和高層建築供水。
分享友人