waterproof layer 中文意思是什麼

waterproof layer 解釋
防水層
  • waterproof : adj. 不透水的,防水的。2. n. 防水物,防水材料;防水布,油布;防水服,雨衣。3. vt. 使(布等)作防水處理,給(布)上膠。
  • layer : n 1 放置者,鋪設者,計劃者。2 【賽馬】(一般)賭客。3 產卵的雞。4 【軍事】瞄準手。5 層;階層;地...
  1. The material has good air permeability, ultraviolet radiation resistant, aging resistant, felting, ceramic tile, plasterer or painting can be directly laid on the waterproof layer

    該材料具有良好的透氣性,耐紫外線、抗老化、粘結力好,防水層上可直接鋪貼瓷磚、抹灰或油漆。
  2. However, the waterproof function and anti - fungus capability of ccf is relatively so poor that the quantity of first - grade and excellent - quality products is very few. in addition, the external antifriction layer of ccf is expensive and faulty, and 80 % of manufactories in china depend on the import antifriction paper. aimed at the situation, this paper put forward a simple and effective way - rabbet surface sealing technique ( rsst ) to improve the waterproof function and anti - fungus capability of ccf

    本文針對其防水抗霉性能較差、一等品及優等品極少;以及其表層耐磨紙價格昂貴、缺陷較多,尤其我國生產廠家80依賴進口耐磨紙的現狀,提出一種簡便而行之有效的方法? ?企口表面全封閉法來改善復合強化地板的防水抗霉性能,並採用國產材料研製出一種集裝飾功能與高耐磨性能於一體、生產成本很低的新型高耐磨層,以替代進口耐磨紙。
  3. In the design, the construction measures such as application of shrinkage - compensating concrete, arrangement of spacing layer between the foundation rock and the bottom slab, adding outside waterproof layer, flexible connection between outlet pipe with side - wall, integerated concrete placement of pump seat with bottom slab and design of reinforcement with application of advanced calculation theory are used according to the characteristics of lager span, larger volume and complex loading conditions of the understructure

    針對下部結構跨度大、體積大、受力復雜的特點,在設計中採取多種措施,包括採用補償收縮混凝土、基巖與底板間設隔離層、增設外防水層、出水管與邊墻採用柔性連接、機座與底板整體澆注、採用先進計算理論指導配筋。
  4. The optimum conditions for air electrode preparation were shown as follow : 20 % ptfe and 20 % mno2 in active layer, thickness of active layer 0. 15 - 0. 25mm and the ratio of active carbon to ethine black 4 : 1 ; 60 % ptfe in the gas diffusion and waterproof layer, employing na2so4 as pore - making agents, thickness 0. 35 - 0. 45mm, colding forming and layer sequence catlytic layer / gas diffusion and waterproof layer / current collector layout ; employing 40 meshed nickel screen as current collector and thermal treatment temperature over 200

    確定了制備空氣電極的優化工藝條件,催化層中ptfe含量約20 , mno _ 2的最佳含量約為20 ,催化層中活性炭和乙炔黑的比例為4 : 1 (質量比) ,厚度在0 . 15 - 0 . 25mm之間。防水透氣層中ptfe的含量約為60 ,以無水硫酸鈉作為造孔劑,厚度一般為0 . 35 - 0 . 45mm 。電極各層採用催化層/防水透氣層/集流體的排布方式,冷壓成型,熱處理對空氣電極的性能影響較大,熱處理溫度不低於200 。
  5. The shearing stress of concrete bridge decks with waterproof layer

    設防水層的混凝土橋橋面鋪裝結構剪應力計算與分析
  6. The phenomena can be observed in the tests low seepage pressures can easily form passageways behind the waterproof layer if there is no drainage layer or the drainage layer is blocked in the single - shell test slab ; the waterproof layer can resist higher seepage pressure if there is no drainage layer or the drainage layer is blocked in the double - shell test slab ; the seepage water can be controlled and drained away in the drainage layer by the water proof layer only if there is unblocked drainage layer behind it in the double - shell test slab

    由試驗可見,在單層試驗板中沒有排水層或排水層不通暢時,較低的水壓就能在防水膜后形成滲流通路;在雙層試驗板中沒有排水層或排水層不通暢時,防水膜能抵抗一定程度的滲漏水壓;只有在雙層試驗板中的排水層暢通時,防水膜才能有效地將滲漏水控制在排水層中排走。
  7. The conclusion is that the extrusion presses between primary and secondary linings, elasticity of the waterproof layer and unblocked drainage layer are the vital factors influencing the waterproof layer of spraying - on acrylate membrane in tunnel composite linings

    試驗結果表明,襯砌間的擠壓應力、防水層的彈性恢復能力、通暢的排水層對丙烯酸鹽噴膜防水層在隧道復合式襯砌中的防水效能發揮重要作用。
  8. Richly contains wheat germ oil and unique moistening essence, which can effectively cover up specks and small wrinkles, improve complexion, and deep and long moisten the skin ; can form an invisible, waterproof layer to help you enjoy natural make up effect all day long

    蘊含小麥胚芽油及特有的保濕精華,能有效遮蓋斑點及幼紋,改善膚色,觸肌即化,深層保濕,持久潤澤,粉感隱然無形,有妝若無妝;防水持久配方,有效防止因汗水而脫妝,保持自然妝容一整天。
  9. The static loading test for three group of testing piles of jiading power plant secend stage project are analyzed and studied in this thesis, and the practical applying of high - accurate data collector, technique of waterproof insulation and testing technique of burying in the body of pile are introduced also. the vertical and horizontal loading features of three group of piles of different kind and constructing technique in different earth layer at the pile point are analyzed and compared and summed up with basic integro - differential equation calculating the pile earth system load transmit, transforming principle of stress - deforming and pile body rating of burying electric measuring element. changing law of stress, and changing law of pile body shifting and bending for different testing piles under vertical and horizontal load are showed so that the loading features of soil layer and pile at testing spot, reliable design data for pile type and base for scientific construction technique are provided

    本文僅就嘉定電廠二期工程中的三根試驗樁的靜載試驗進行了分析和研究,利用樁土體系荷載傳遞分析計算的基本微分方程及應力-應變轉換原理,結合預埋電測元件的樁身率定,對三組不同種類、不同施工工藝、不同持力層中的樁的豎直、水平承載特性進行了分析、比較和歸納,通過大量、全面的實測數據,經過整理、轉換和推演,揭示了不同試驗樁在豎直、水平荷載作用下的應力變化規律和樁身變位、撓曲變化規律,最終提供試驗場地土層和樁的承載特性,為該工程合理設計樁型提供了可靠的設計參數,為確定科學的施工工藝提供了有力的依據。
  10. After the works of the waterproof layer is finished, check to ensure there is no abnormality before laying beipeng extruded board

    防水層施工完后對防水層做檢查確認無異后,才可以鋪設北鵬擠塑板。
  11. Air electrode, in which nh _ 4hco _ 3 is as pore former, is mainly studied in this paper. the manufacturing process of air electrode, the composition of waterproof and gas diffusion layer, the composition of catalysis layer, and two kinds of catalyst were studied by numbers

    本文針對以碳酸氫銨為造孔劑的空氣電極進行研究,分別對電極製作工藝、防水透氣層組成、催化層組成以及兩類催化劑進行了初步系統的探索和研究。
  12. The optimum conditions for air electrode preparation were shown as follows : active carbon which was baked for 15 min in 900 as carrier for catalyst, bond is 60mass % polytetrafluoroethylene ( ptfe ) liquor, 20 % ptfe in waterproof layer, 10mass % pore - making in waterproof layer thickness of waterproof layer 0. 30mm, 10mass % ptfe in catalysis layer, nickel screen for current collector, compacting pressure 6mpa

    確定製備空氣電極的最佳工藝條件為:催化劑載體的處理條件為在900下灼燒15min ,粘結劑為60mass % ptfe的水溶液。防水層中pefe含量為20mass % ,造孔劑含量為10mass % ,其厚度為0 . 3mm 。催化層中ptfe含量為10mass % 。
  13. Through analysis, we can conclude that when the unstratabound fissure in the soft layer cannot form the connected pathways the waterproof curtain that extended into soft layer is validity ; and when the connected pathway can be formed, the effect of the waterproof curtain is finite

    分析可知,當軟巖層中不存在可以形成上下游貫穿通道時,延伸嵌入軟巖的帷幕對壩基滲流的作用是有效的;當存在通過切層裂隙形成的上游貫穿通道時,延伸嵌入軟巖的帷幕對壩基滲流的作用則是有限的。
  14. The relevant experiments and tests show that this method combined with specially designed double layer knitted fabric can provide the function of waterproof and moisture wicking

    通過系列實驗和測試,證明了採用這種方法並結合特別設計的雙層針織結構能夠實現面料拒水導濕透氣的功能。
  15. The tent s base is waterproof, while its inner layer is made of finely woven netting that provides ventilation and protection against insects, and also serves as a stand - alone mosquito net

    打坐帳:移除外帳,變成一座露天打坐帳,防水底層設計,帳幕通風細密,防蚊蟲叮咬。平時可當一般蚊帳使用。
  16. Leak treatment of self - stick membrane waterproof layer

    自粘卷材防水層滲漏水處理實例
  17. The waterproof layer and partial structures of composite linings were simulated by single and double shell concrete test slabs, and the seepage water pressure was applied to the slabs with the manual pump

    通過單層、雙層混凝土試驗板對防水層及隧道襯砌的局部結構進行了模擬,並通過手動泵進行滲漏水壓加載。
  18. The different working conditions of the waterproof layer of spraying - on acrylate membrane in tunnel composite linings were simulated in tests to evaluate the waterproofing effectiveness and influencing factors of the layer

    摘要對丙烯酸鹽噴膜防水層在隧道復合式襯砌中的不同工作狀態進行模擬與測試,以對其防水效能及影響因素做出評價。
  19. Development of vulcanized rubber waterproof layer used in acoustic baffle

    型寬帶耐壓反聲障板用硫化橡膠防水層的研製
  20. No jointing work in the whole waterproof layer reduced the hidden trouble of leakage and enhanced the waterproof effect

    整個防水層無接縫施工,減少了滲漏隱患,提高防水效果。
分享友人