wire length 中文意思是什麼

wire length 解釋
連線長度
  • wire : n 1 金屬線,銅絲,鐵絲,鋼絲;【電學】導線;線路;金屬絲網;【造紙】抄網。2 電信;〈口語〉電報。3...
  • length : n. 1. 長,長度,長短。2. (時間的)長短,期間。3. (賽艇的)一艇的長度;一馬的長度。4. 程度,范圍。5. 【板球】球程;投至適當距離的球。6. 【語言學】音長。7. 一段,一節。
  1. The method relies on the constancy of masses and of the length of the wire.

    這種方法依賴于懸重和弦長的恆定性。
  2. Trolley wire network length

    觸線網長度
  3. Skin the insulation material of wires with a length 5 cm more than that of wire clip, and hang c form parts and splitting wire on the main cable, and then insert the wedge between the two wires with force

    剝離絕緣導線絕緣層,剝離長度應大於線夾長度5厘米,將c形元件和分接線一起掛在主線上,將楔塊用力插入兩導線之間。
  4. Fence length wire gauge

    浸塑厚度mm
  5. The bit was attached to a heavy length of steel suspended by a wire rope.

    鉆頭系在由鋼絲繩懸掛起來的加重桿上。
  6. Backing weld procedure technique of all - position narrow gap and thick - walled pipe welding is developed about all - position single - pass welding section analysis, wire feeding behavior, weld arc length, welding current analysis, procedure and joint test. the achievement has general guide meaning to producing and testing all - position welder

    從單焊道全位置區段、送絲行為、焊接弧長(電壓) 、電流行為分析、工藝試驗和接頭檢驗等幾方面介紹管道全位置打底焊工藝特點,其研究成果對全位置焊接機的製造和調試具有普遍指導意義。
  7. Abstract : backing weld procedure technique of all - position narrow gap and thick - walled pipe welding is developed about all - position single - pass welding section analysis, wire feeding behavior, weld arc length, welding current analysis, procedure and joint test. the achievement has general guide meaning to producing and testing all - position welder

    文摘:從單焊道全位置區段、送絲行為、焊接弧長(電壓) 、電流行為分析、工藝試驗和接頭檢驗等幾方面介紹管道全位置打底焊工藝特點,其研究成果對全位置焊接機的製造和調試具有普遍指導意義。
  8. Abstract : an algorithm is presented for better legal solution in detailed placement of large scale mixed macros and standard cells ic design. due to the limitation of computing complexity, an effective and efficient initial placement is very important for detailed placement. novelty of this algorithm lies in a better solution at initial stage by using network - flow method to satisfy row capacity constraint and the thought of linear placement problem ( lpp ) to resolve overlaps. moreover, divide - and - conquer strategy and other simplified methods are adopted to minimize complexity. experimental results show that the algorithm can get an average of 16 wire length improvement on paflo in reasonable cpu time

    文摘:以大規模混合模式布局問題為背景,提出了有效的初始詳細布局演算法.在大規模混合模式布局問題中,由於受到計算復雜性的限制,有效的初始布局演算法顯得非常重要.該演算法採用網路流方法來滿足行容量約束,採用線性布局策略解決單元重疊問題.同時,為解決大規模設計問題,整體上採用分治策略和簡化策略,有效地控制問題的規模,以時間開銷的少量增加換取線長的明顯改善.實驗結果表明該演算法能夠取得比較好的效果,平均比paflo演算法有16的線長改善,而cpu計算時間只有少量增加
  9. I need a length of wire or string to tie it with.

    我需要一根鐵絲或繩子來捆它。
  10. The bandwidth of a copper wire decreases exponentially with length, and hence adsl data rates drop by 10x in going from 6000 feet to 18000 feet

    答案:在銅線上頻率是隨著長度以陪數遞減,所以adsl的數據傳輸率從6000尺至18000尺是以10陪下跌。
  11. Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders

    其次,根據懸索橋恆載設計理想狀態建立了懸索橋施工計算原理;以分段懸鏈線索理論為基礎,推導了懸索的線形變化剛度和懸索支點的滑移剛度;介紹了懸索橋成橋設計線形計算、吊索無應力長度計算、空纜線形與預偏量計算、絲股架設線形計算、索夾安裝位置計算和加勁梁吊裝線形計算的具體方法、數值演算法及軟體sgkz2000的計算模塊的實現。
  12. This paper also presents the methods of controlling unstressed length of cable, pre - displacement of saddle, anchor span tension, erection of wire strands, the fixed position for erecting cable band and cable length. determination and control approach of displacement of saddles during cable erection are also introduced. at the same time, the change course of linetype during construction period for suspension bridge is analyzed

    再次,介紹了懸索橋的施工控制內容與方法,利用軟體sgkz2000對多座懸索橋進行了施工計算,提出本文關于懸索橋的主纜無應力長度控制、索鞍預偏量控制、錨跨張力控制、絲股架設控制、索夾安裝位置與吊索長度控制的方法;介紹了吊梁階段鞍座頂推量的確定與控制方法,分析了施工階段懸索橋的線形變化過程。
  13. The conductor-length problem was solved by forming the required length of wire into a grid pattern.

    電阻絲長度問題,是採取將所需長度的金屬絲做成柵狀結構的辦法解決的。
  14. A tight curl, twist, or bend in a length of thin material, as one caused by the tensing of a looped section of wire

    扭結一段長度的材料產生的繃緊的捲曲,曲折或彎曲,例如因拉緊線的有環部分
  15. The scheme takes advantages of repeaters and low - swing differential - signaling circuits on driving long wires in different length, and optimally inserts them along the wire in order to decrease delay and power of interconnects

    該方法利用中繼驅動器和低擺幅差分信號電路在驅動不同長度連線時的優點,將它們混合插入到連線的合適位置,從而降低互連的延時和功耗。
  16. The hardware of the system comprises the five sub - systems, i. e. welding power source, arc length controller, welding wire feeder, welding head traveller and detector. the software is composed of the off - line serving program and the on - line executing program

    此系統的硬體主要包括五個子系統,即:焊接電源、弧長控制器、送絲機構、焊矩行走機構和檢測機構;軟體包括在線執行程序和離線服務程序。
  17. The length of telegraph wire has grown from 900 miles in 1896 to 2, 600 miles in 1902, and 1350 miles of telephone wire have been laid, over which in 1902 3, 690, 228 messages were sent

    電報線從1896年的900英哩成長到1902年的2600英哩,而電話線在1902時也鋪設了1350英哩,在其間發送了3 , 690 , 228件信息。
  18. In this paper, the three level fortification criterion, two stage design method and the elastic response spectrum theory are adopted, and the program of nba ( the program of nonlinear - aseismic analysis for beam bridge ) is used to calculate. through gathering, analyzing and calculating a lot of bridge design materials, this paper induces a simple way to calculate the relative displacement of the beam and the pier, and then according to the current design method, it concludes a better design principle of the supporting length of the beams. at the same time the dynamics is adopted to put forward the design method of the carrying capacity and the lengthen of prestress wire ( steel bar ) falling - off prevention structures of highway bridges

    本論文採用三水準設防、兩階段設計方法、彈性反應譜計算理論,運用橋梁結構非線性地震響應分析程序nba ( theprogramofnonlinear ? aseismicanalysisforbeambridge )進行計算;通過收集大量的實橋設計資料,經分析計算,歸納總結出計算上下部結構相對位移的簡便計算方法;並綜合國內外的經驗值,提出梁的支承長度se的設計原則;同時運用動力學突加荷載的原理,推導分析了預應力鋼絞線式(鋼棒連接式)落梁防止裝置設計承載力的計算方法和設計伸長量s _ f的取值;最後本文通過實橋計算,說明了落梁防止系統設計的方法。
  19. The injection rate, injecting angle, wire length, preparing quality of the cored - wire, treating ladle, treating temperature, inoculation and so on are the key factors influencing the treating results, so must be strictly controlled

    喂線速度和長度、包芯線加工質量、鐵液處理包、球化處理溫度、孕育和入射角等因素都是喂線球化工藝質量控制要點,是決定喂線球化工藝成敗的關鍵,在生產過程中必須嚴格控制。
  20. Abstract : an efficient parallel global router using random optimization that is independent of net ordering is roposed. parallel approaches are described and strategies guaranteeing the routing quality are discussed. the wire length model is implemented on multiprocessor, which enables the algorithm to approach feasibility of large - scale problems. timing - driven model on multiprocessor and wire length model on distributed processors are also presented. the parallel algorithm greatly reduces the run - time of routing. the experimental results show good speedups with no degradation of the routing quality

    文摘:設計實現了一個高效的線長模式下基於多處理機的并行總體布線器.通過對非時延驅動模式下串、并行演算法的總運行時間和求解時間的比較,表明該并行演算法能夠在保證求解質量無明顯變化的前提下大大加快總體布線演算法的求解速度.同時,也提出了基於分散式體系結構的并行總體布線演算法
分享友人