wisco 中文意思是什麼

wisco 解釋
武鋼
  1. Chapter n analyzes the present urban gas civil use in wisco, and points out that the major problems are miscalculation of fluctuating needs of users, rigid maximum production, excess reserve, and redundant pipe net transport. all these lead to the conclusion that urban gas which transcends the users needs has increased purification and transport cost

    第二章,分析了武鋼民用煤氣輸配系統的現狀,對用戶動態需求估計不準,按照最大能力組織生產,儲備能力過剩,管網輸送能力富餘;指出了現行生產工藝中存在的問題,超出用戶需求的煤氣增加了凈化成本和輸送成本。
  2. And painstaking investigation for the industrial port of wisco production equipments, loading and unloading technological process and transportation assignment process and collecting a great deal of datum. they have found out the climacteric element which had made quantitative analysis and research about those climacteric elements. they have had come to the conclusion that the climacteric element of influencing the finished product wharf of the industrial port of wisco production ability, loading and unloading assignment efficiency, loading and unloading quality was the contradiction between goods " distribution of cargoes and the not match of shipping style, the transport organization process of steel was incardinate

    本文針對以上問題,在深入武鋼工業港生產實際,對其生產設施設備、裝卸工藝流程、運輸作業流程等進行調查研究和收集大量數據的基礎上,分析研究了制約武鋼工業港成品碼頭生產能力的關鍵因素,並對這些關鍵因素進行了量化分析和研究,得出了影響武鋼工業港成品碼頭生產能力、裝卸作業效率和裝卸全面質量的關鍵性因素是貨物配載和船型不匹配、鋼材運輸組織流程不協調的結論,指出克服這些影響因素的思路和方法。
  3. Such, regarding the present and the future, the circulating capacity of no. 3 operating district has been one bottleneck in the supply chain of wisco

    三區碼頭的通貨能力已成為武鋼生產流通體系的一大瓶頸,改進三區庫場管理,建立電腦化的庫場智能管理系統,提高庫場利用率已勢在必行。
  4. For the receiving and delivering operation and inventory management in no. 8 and no. 9 stockyards directly affect products " circulating capacity in no. 3 operating district and the loading / unloading efficiency of ships which eventually postpone the delivering time to customers according the tenth five year ' s planning of wisco, wisco will produce 9 million tons annually and outselling products will highly exceed the designed 1. 2 million tons circulating capacity of no. 3 operating districts

    8 、 9碼頭庫場是進出口鋼材集散和換裝過程中短期堆存的場地,庫場的大小,尤其是管理水平的高低,影響著船舶裝卸效率的高低和在港停時的長短,直接影響到三區碼頭的通貨能力,影響到武鋼產品的外發能力。根據武鋼「十五」規劃,武鋼將實現每年鋼產量900萬噸,外發產品將遠遠超過工業港三區碼頭的設計通貨能力120萬噸。
  5. The effect of different operation parameters on the molten steel flow in the mould in no. 2 steelmaking plant, wisco has been studied via the three - dimensional flow field software developed by the authors

    利用開發的三維流場計算軟體,研究了操作參數對武鋼二煉鋼板坯連鑄機結晶器內鋼液流動的影響。
  6. “ we are telling everyone to get rid of fresh bagged inach right now. don ' t a ume anything is over, ” wisco in gov. jim doyle said

    威斯康星州長基姆?道爾說: 「我們正告訴所有的人馬上把袋裝新鮮菠菜扔掉。千萬不要以為一切都結束了。 」
  7. Also, the reliability theory is applied to probe into the current situation of urban gas civil use in wisco. the author recalculates the reasonable stock capacity, analyzes present reserve ability, and proposes a new scheme to change the current production technology

    用可靠性理論分析了武鋼民用煤氣輸配系統的現狀,計算了合理的庫存容量,分析了目前儲存設施的能力,提出了改變現行生產工藝的新方案。
  8. Applying forecasting and controls theory, the author analyzes the statistics data of civil use of urban gas in the wisco, establishes forecasting models for the daily and hourly gas consumption, and compares the model result with the real load. on this basis, the author maintains that it is necessary to adopt control measures and reasonably organize production. moreover, the author puts forward a feasible plan to improve the current production technology, in order to meet users " needs and meanwhile reduce cost of production and increase enterprise profit

    運用預測與控制理論對武鋼民用煤氣歷史統計數據進行分析,建立了日用氣負荷和小時用氣負荷預測模型,將預測結果與實際負荷進行對比,採取控制措施進行生產調度,合理組織生產,提出了改變現行生產工藝的可行性方案,以達到既保證用戶需要,又降低生產成本,增加企業利潤的目的。
  9. Abstract : the hidden perils and troubles of safety existing in the interlocking circuit between the tipper in the raw material area and the railway signal system in wisco have been analyzed one by one and causes to their occurrence found out and the technological theory and counter measures to solve those problems comprehensively expounded and better working performance and reliability on the improved interlocking circuit achieved

    文摘:針對武鋼原料區原翻車機與鐵路信號聯鎖電路存在的安全隱患和缺陷,一個一個地進行剖析,找出它們產生的根源,全面系統地論述了解決這些問題的專業技術理論及其具體的改進措施,使改進后的翻車機與鐵路信號聯鎖電路性能良好、工作可靠。
  10. Development trend of high - speed railroad and strategies of wisco ' s heavy rail production

    高速鐵路發展趨勢及武鋼重軌生產策略
  11. Based on this, the paper explicitly puts forward a directive strategy for wisco ' s diversified operations as follows : backed up by wisco while tackling the broadest market, through reform in managerial and operational mechanism and innovation in technology, and by means of making best use of the state ' s industrial policies, the capital and advanced technology at home and abroad, and wisco ' s available resources, to cultivate and build up the development - and market - oriented, profit - and innovation - driven non - steel pillar industry and make the non - steel industry grow simultaneously with the steel sector, and turn the non - steel industry into new growing points for wisco

    在此基礎上,明確提出了武鋼多元化經營的戰略指導思想是:以發展為主題,以市場為導向,以效益為中心,以創新為動力,利用國家的產業政策,利用國內外的資金,利用武鋼的資源,利用國內外的先進技術,依託武鋼,面向社會,通過改革管理體制和經營機制,技術創新和制度創新,著力培養和形成非鋼支柱產業,使非鋼產業與鋼鐵產業同步發展,成為武鋼新的經濟增長點。
  12. Abstract : the present paper elaborates the role of the ironmaking area and the general situation of process flow and task of the ironmaking area at wisco in the coming century, correctly analyzes the current conditions and advantages of the ironmaking facilities, and affirms that the blast furnace ironmaking is still the main stream in the 21st century and the ironmaking area will remain the bottle neck in the whole process flow in wisco

    文摘:闡述了進入新世紀武鋼煉鐵系統的作用、武鋼工藝流程的總形勢及武鋼煉鐵系統的任務;正確地分析了武鋼煉鐵系統的現狀及其優勢,提出了高爐煉鐵仍是21世紀煉鐵系統的主流,而煉鐵系統又是武鋼整個流程中的關鍵性環節。
  13. The configuration of conventional backup and work rolls for revamped 1700 tandem cold rolling mill at wisco was proved unreasonable by systematical test as the cause of work roll edges contact during thin strip rolling and unsatisfactory flatness of product

    摘要通過現場跟蹤測試和生產實踐發現武鋼1700冷連軋機組「酸軋聯機」改造工程中存在常規凸度輥形配置方案不合理,由此引起了薄規格軋制的工作輥「壓肩」現象和軋制過程欠穩定導致成品板形質量欠佳等問題。
  14. From the blending workshop in ih of wisco beginning its production, its technology data had been managed by tai - account management model. that is to say, different types of operation data were accounted by hand respectively, and then on the basis of which relative analysis and caculation were done

    武鋼混勻料場至投產以來,其工藝數據管理一直沿用臺帳式管理模式,即將不同類型的生產數據分別手工建帳,並在此基礎上進行有關分析計算。
  15. Mechanism of ring forming in rotary kiln for active lime at wulongquan mine of wisco

    武鋼烏龍泉礦石灰回轉窯結圈形成的機理及防治措施
  16. With the guiding ideology of top quality famous brand strategy had put forward, wisco aggregation has formulated the development program of the tenth - five - year plan, they had brought out their achievement that 9 million ton steel has produced every year, they wanted to construct wisco to be a steel modernization enterprise and famous brand ' s productive base with the level of international first - rate

    隨著武鋼集團提出實施精品名牌戰略的指導思想,制定了「十五」發展規劃,實現年產900萬噸鋼材的目標,初步把武鋼建成國際一流水平的現代化鋼鐵企業和精品名牌生產基地。這對武鋼工業港成品碼頭鋼材裝卸能力和裝卸質量提出了新的要求。
  17. This new requirement was putting forward for the steel ' s ability and quality on loading and unloading of the finished product wharf of industrial port of wisco. because the industrial port of wisco was built during the planned economy system period, the structure form of wharf was much different from the diversify of the arriving - port shipping style ; meanwhile, with our country ' s market - economy is developing continuously, the demand of clients " requirement about market became higher and higher to steel ' s varied assortment, small batch of constract and quality of transportation

    武鋼工業港成品碼頭建於計劃經濟體制時期,其碼頭結構形式與現有到港船型的多樣化存在較大矛盾;同時,隨著我國市場經濟的發展,客戶對鋼材品種多樣化、合同批量小、運輸質量等市場需求呈現越來越高的要求,武鋼工業港成品碼頭現有的裝卸作業組織方式和貨物流程模式,已難以適應這種多樣性的市場需求。
  18. Long campaign life technology of wisco ' s no. 1 blast furnace

    對高爐本體冷卻系統的技術分析及探討
  19. From wavelet analysis, the fault feature of high speed wire rod processer in the heavy section mill of wisco is successfully extracted and from this effective method the same kind accident can be avoided and the fault situation can be confirmed for the future

    成功的通過小波分析提取出武鋼大型廠高速線材軋機齒輪箱輸出接手螺栓拉斷故障特徵,捕捉到故障信息,為今後判斷、預防同類事故及事後確定故障部位提供了有效的分析手段。
  20. The article has set up a new assignment process on production logistics for the industrial port of wisco ' s finished product wharf, mixing the modernized information technology, especially the abundant applying on computer network, guiding with information, by strengthening the plan of production logistics to improve the passing ability of fished product wharf and steel ' s outbound quality and level, to reduce the inefficiencies assignment of every process in the product logistics, bring down the wastage with effect

    文章構建了武鋼工業港成品碼頭新的生產物流作業流程,融合現代信息技術尤其是計算機網路技術,以信息流為先導,通過增強生產物流的計劃性來提高成品碼頭的通過能力和鋼材外發質量與水平,減少生產物流各個環節的無效作業,有效降低物流損耗。
分享友人