work breakdown structure 中文意思是什麼

work breakdown structure 解釋
工作分解結構
  • work : n 1 工作,操作,勞動,作業;工件;功課;努力;行為,作用。2 (待辦的)事務,業務;職業。3 〈前有...
  • breakdown : n 1 崩潰,倒塌;破損,損耗;損傷;損壞,故障;失敗,挫折;中斷,停止。2 【航空】下降;【電學】擊...
  • structure : n. 1. 構造,結構;組織;石理,石紋。2. 建造物。3. 【化學】化學結構。4. 【心理學】(直接經驗中顯現的)結構性,整體性;整體結構。adj. -d ,-less adj.
  1. Generate work breakdown structure ( wbs ) codes automatically

    自動生成工作分解結構( wbs )代碼
  2. During hands - on exercises, you will work as part of a team to develop a project charter, a project scope statement, a work breakdown structure, and risk - based estimates for a real project provided by you or by another participant

    在動手練習中,你會作為一個團隊的一部分對一個由你或其他學員提供的真實個案進行實施其項目計劃,項目框架,工本結構及風險測算。
  3. Costed work breakdown structure

    帶成本信息的工作分解結構
  4. Contract work breakdown structure " cwbs

    合同工作分解結構
  5. Cwbs contract work breakdown structure

    合同工作分解結構
  6. During hands - on exercises, you will work as part of a team to develop a project definition document, a work breakdown structure, range estimates, a network logic diagram, and a risk response analysis

    在實踐練習中,您將作為團隊的一員,參與設計項目的定義文件、工作分解結構、范圍估計、網路邏輯圖和風險應對分析。
  7. The simplest way to construct milestones is to take the timing information from the work breakdown structure and sequence diagram

    設置里程標最簡單的方法是從工作細分結構和任務排序表中提取時間信息。
  8. To map roles to persons is a main task for the project manager once the work breakdown structure has been defined in the abstract

    在工作分解結構抽象定義之後,將角色映射到人就是項目經理的主要任務。
  9. The application of work breakdown structure in management plan of building item

    在施工項目管理計劃階段中的應用
  10. The works that i did are making work breakdown structure, organizational breakdown structure, responsibility assignment, plan, estimate, progresss baseline, measure evc, record actual cost for work performed, tracking. trending, projection and corrective action

    在項目執行過程中,要對實物成果和實耗費用進行監測,實物成果按事先確定的里程碑來測量,即以實際達到某里程碑的資源預算加權值乘以該項工作的預算值即可求得贏得值。
  11. Customize work breakdown structure codes

    自定義工作分解結構代碼
  12. Defines and tracks project plan and work breakdown structure

    定義並追蹤項目計劃與工作分解結構。
  13. See : work breakdown structure

    請參見:工作分解結構
  14. If you have microsoft visio 2000 or later installed, you can use the visio wbs chart wizard com add - in for microsoft project 2002 to create a work breakdown structure chart in visio from microsoft project data

    如果您已安裝了microsoft visio 2000或更高版本,則可以使用microsoft project 2002的visio wbs圖表向導com加載項來使用microsoft project數據在visio中創建任務分解結構( wbs )圖表。
  15. The system reform of the science and technology service ltd. of ciac has clear starting point and goal. it proceeds in certain time, place and environment. applying project management approach, i. e. wbs ( work breakdown structure ) method, this thesis describes the reform flow chart and protocols our own wbs

    本文通過項目管理的方法,就長春中科應化科技服務有限公司改制進行了研究,闡述了改制的啟動與計劃、外部環境分析、內部現狀分析、實施整個項目管理過程。
  16. The work breakdown structure should also identify the elements relationships to each other and to the end product

    此外,工作分解結構( wbs )還應標識元素間的相互關系以及元素與最終產品之間的關系。
分享友人