work of erosion 中文意思是什麼

work of erosion 解釋
侵蝕作用
  • work : n 1 工作,操作,勞動,作業;工件;功課;努力;行為,作用。2 (待辦的)事務,業務;職業。3 〈前有...
  • of : OF =Old French 古法語。
  • erosion : n. 1. 腐蝕,侵蝕(作用)。2. 【醫學】糜爛,齒質腐損。
  1. What ' s more, we put forward some experienced formulas on the basis of the cortical analysis. the result of the research show that by installing diffluent piers with low ridge, we can eliminate the root of oscillatiny water jump, perfect the energy dissipation effect of water jump, also, we can improve the flow condition of down - stream. the fact that the main flow of down - stream is in the middle, not only effectively lower the speed of the bottom flow in the ridge rear, alleviate the erosion to the river bed, but also avoid the heavy wave resulted from the main flow in the surface, thus improve the surface wave of down - stream obviously. we can work out the body style parameters of diffluent piers with low ridge according to the project flow condition and experience formulas, and then reckon the down - stream surface wave condition for the protected building of the down - stream bank

    研究結果表明:設置低坎分流墩后,消除了擺動水躍水舌擺動的根源,提高了水躍的消能效果,改善了下游水流流態。下游水體的主流在中部,既有效的降低了坎后水流底流速,減輕水流對河床的沖刷,又避免了主流位於表面導致波浪過大的結果,下游的水面波浪明顯得到削減。依據經驗公式,可根據工程水流條件設計出低坎分流墩的體型參數,進而估算出下游沿程的水面波浪,為下游岸邊的砌護提供依據。
  2. Backed by the group of ten governors, the members of the committee resolved to halt the erosion of capital standards in their banking systems and to work towards greater convergence in the measurement of capital adequacy

    另一種是歐洲澳大利亞和香港模式。根據這種模式,所有的附屬交易都必須在"臂長"的基礎上所達成。
  3. Because of its resistance to electrochemical erosion, low manpower demand for application and minimal changes in geometrical dimensions of the member, the method has been found to be economical and efficient for application, based on the previous work, we designed and conducted experiments of 10 reinforced concrete ( rc ) slabs strengthened with the common carbon fiber reinforced plastic ( cfrp ) ; and investigated the effect, failure mechanism and theory

    由於具有耐腐蝕、施工簡便快捷、幾乎不改變構件原有尺寸等特點,得到廣泛的應用,具有良好的經濟效益。在前人的工作基礎上,我們設計、試驗了10採用碳纖維布加固的鋼筋混凝土單向板,探討了加固單向板的加固效果和理論分析方法。
  4. Article 30 design and work of highway construction should be done in conformance with requirements of the protection of environment, historical relics and sites and the prevention of water loss and soil erosion

    第三十條公路建設項目的設計和施工,應當符合依法保護環境、保護文物古跡和防止水土流失的要求。
  5. The characteristic of top soil will changed by splash erosion and surface erosion, accordingly to alert the route of runoff and seepage and work to unconsistenty of soil erosion

    棄土場坡面地表土壤特性隨著降雨擊濺和徑流沖刷的作用而發生變化,從而影響區域內徑流和滲流途經,造成坡面產流的不一致性。
  6. The paper introduces some typical water erosion disaggregation models in foreign countries, evaluates the present status of study on water erosion disaggregation model conducted in china and points out the existing problems in model study ; the necessary work should be developed and scientific issues to be solved in establishing soil erosion forecasting model in china

    重點介紹了幾種國外具有代表性的分散式水蝕模型,並對國內土壤水蝕分散式模型的研究現狀進行了評價,指出了目前我國模型研究中存在的問題,以及建立我國土壤侵蝕預報模型所必須開展的研究工作和需要解決的科學問題。
  7. In order to prolong the natural life of fracturing pump valve, this article do much basic research work on fracturing pump value. firstly, kinetic characteristics of fracturing pump valve are stated particularly and analysed. through stimulated experiment based on practical working conditions, the wearing disciplinarian and forms of impact particle wear about fracturing pump valve are researched by comparing it with pure impact wear and abrasive wear. furthermore, the wear mechanism of impact particle wear and particle erosion are analysed. in the end, by using the fenite element analyzing tool ansys, the distributing law of stress and strain of fracturing pump valve at the state of closing and during the process of impact are analysed carefully

    詳細闡述和分析了它的運動特性;根據其實際工況,通過模擬試驗,研究了壓裂泵閥沖擊磨料磨損的磨損規律和磨損形式,並且將其與純沖擊磨損、滑動磨料磨損進行了對比;分析了壓裂泵閥的沖擊磨料磨損、沖蝕磨損等磨損機理;藉助ansys有限元分析工具,對泵閥關閉狀態下和沖擊過程中的應力應變分佈規律進行了詳細分析。
  8. Therefore, this article has carried on the following work : 1. designed and made a movable wind erosion tunnel drove by tractor firstly in our country. the wind speed range of the tunnel is from 2 m / s to 28 m / s and the speed can be adjusted continuously

    研製了我國第一座使用拖拉機為動力的移動式風蝕風洞,風洞風速為2 28m s ,且連續可調,風洞總長11m ,實驗段長6m ,為無底矩形截面, 1 . 0m高、 0 . 8m寬。
  9. At present, many fields remain to further research, especially the profound combination of gis technique with ece ( estuarine and coastal engineering ), which should be developed for the purposes as follows : ( 1 ) to serve the huge comprehensive work in changeable natural conditions and difficult construction conditions which takes a long period and covers a large region, e. g. the regulation work of deepwater channel in the yre ( yangtze river estuary ) ( 2 ) to combine the gis with applied numerical model ( 3 ) to study the hydrodynamic processes and characteristics of waves, tidal currents and sediment transport, as well as the affection carried by the regulation work in an estuary ( 4 ) to monitor and to analyze ees ( evolution of erosion and sedimentation ) and the variation of riverbed ( 5 ) to play a role of dynamic supervising of a engineering project

    目前尚有許多有待進一步研究的領域,尤其是以服務于長江口深水航道治理這樣規模大、周期長、影響區域廣、自然條件復雜、施工情況多變的國家重點工程為目的,將gis與專業應用數學模型結合,對河口海岸波浪、潮流、泥沙運動的動力機制,以及整治工程建築物對其影響的研究,對入海航道沖淤和河勢演變的監測分析,對施工進展和工程效果實現「動態」監控和管理,尚缺乏同gis技術的深入有效結合。
  10. Because of the work mentioned above, a new method of renewing ancient thickness is brought forward, the method of the continuing tendency of the uneroded stratum thickness, the method of the variety rate of the reference layer thickness and the method of the ratio of the contiguous layer thickness are used to renew the erosion thickness in ludong area for the first time and the method of fuzzy synthetic evaluation is used to prioritize the favorable places for prospecting for oil and gas

    在此基礎之上,提出了一種恢復古厚度的新方法,並首次在陸東地區採用未被剝蝕地層厚度趨勢延伸法、參考層厚度變化率法和鄰層厚度比值法進行剝蝕厚度恢復,以及採用模糊綜合評判方法優選出了有利的勘探目標。
分享友人