入土隧道 的英文怎麼說

中文拼音 [suìdào]
入土隧道 英文
driven tunnel
  • : Ⅰ動詞1 (進來或進去) enter 2 (參加) join; be admitted into; become a member of 3 (合乎) conf...
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  1. This subject directly investigates 14 construction enterprises and more than 40 construction sites. the types of the projects involve railway, bridges, tunnel, municipal, road, industry and civil construction, airport runway, hydraulic tunnel and others. this paper deeply analyzes and assesses the occupational health and safety management actuality of the construction site, points out the main problems in the process of hazard identification, risk assessment and risk control, and also analyzes why these problems exist

    該課題研究直接調查了十四家施工企業和四十多個項目施工現場,項目類型涉及鐵路工程、市政公用工程、公路工程、房屋建築工程、機場場工程、橋梁工程、水工洞工程、石方工程等,對施工現場實際的職業健康安全管理現狀進行深的分析、評估,指出了危險源辨識、風險評價、風險控制過程存在的主要問題,並分析了為什麼會存在這樣的問題。
  2. The process and methods of monitoring measurement in the course of construction are detailed the measuring data analyzed and treated are studied. besides the forecast and calculate of tunnel surrounding rock stably displacement are deeply researched, and according to the uncertainty of geotechnical engineering, grey verhulst model is put forward to forecast tunnel surrounding rock displacement based on optimizing gm ( 1, 1 ) model

    介紹了施工監控量測的過程和方法,對量測數據的處理技術與分析方法進行了研究,深地研究了圍巖穩定位移的預測預報,並針對巖工程的不確定性,在優化gm ( 1 , 1 )模型的基礎上,提出了用灰色verhulst模型預測圍巖位移。
  3. In home and aboard case history, it had mainly depended on the experience of technical staff concerned quite a long time ; the development in areas of geo - techniques and measurement technique, database management technology and computer - aided design technology etc has pushed tunneling into " observational method ( hereinafter referred to as om ) era "

    在中外建設歷史上,很長一段時期主要依賴工程技術人員的工程經驗;新奧法誕生以來巖理論及量測技術、數據庫管理技術、計算機輔助設計等方面的發展,使施工跨了「信息化」時代。
分享友人