冰載荷 的英文怎麼說

中文拼音 [bīngzǎi]
冰載荷 英文
ice load
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 荷名詞(蓮) lotus
  • 載荷 : load; loading載荷變化 load fluctuation; variation in load; 載荷裝置 load device
  1. To determine the bank - head ' s ice force of the lead - navigating bank at key position that faces the ice directly of certain water conservancy, ice model test in reduced scale is designed and carried out based on the local situation on the spot and data observed

    摘要以現場實際工況及觀測數據為依據,以確定某水利樞紐關鍵迎部位引航導堤堤頭問題為目的,設計並進行了縮尺的模擬試驗。
  2. The calculation results show that the jack - up platform under dynamic ice loads is in safe condition and can perform drilling operation in winter ice zone

    計算結果表明,該平臺的樁腿在激動下的強度滿足安全要求,冬季繼續在區海域進行鉆井作業是可行的。
  3. Offshore platforms are generally used on - site, inevitably undergoing the environmental loads such as wind, waves, current, ice and earthquake etc., which will induce continuous vibration of the offshore platforms

    海洋平臺在服役期內會受到風、浪、流甚至是、地震的作用。
  4. In combination with the current research on ice load in china, this paper summarizes the research achievement of ice load on structures in caofeidian ore terminal project and relevant enlightenments, which may serve as a reference for designers

    摘要結合我國研究現狀,介紹曹妃甸礦石碼頭結構抗設計研究成果及的設計標準和計算方法,以及由此得到的一些體會和啟示,供設計人員參考。
  5. Actions on structures - part 5 : snowloads and ice loads

    對結構物的作用.第5部分:雪冰載荷
  6. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大橋高樁承臺吊箱圍堰的全結構模型,相對準確地模擬灌注封底混凝土后、抽除吊箱內河水后、承臺破體施工后等三種受力工況,並用模型進行了應力和變形的計算,計算各工況作用於吊箱全結構箱體板面、內支撐、吊桿、懸吊頂梁、底梁等的應力和變形,並對比吊箱圍堰板面計算變形和施工實測變形,結果是吻合的;對大遼河特大橋高樁承臺輕型吊箱的穩定性進行了計算分析;論文研究工作表明,應用組合有限元方法計算大型施工結構問題具有現實意義。
  7. The horizontal load actions of wind, wave, current and ice may cause the offshore platform sliding, and the platform sliding resistance includes soil cohesion, friction and soil resistance, so the bucket foundation platform should be designed to meet the requirements of stability against sliding to ensure the overall stability of platform

    平臺在海上受風、浪、流、等水平作用產生滑移,而土壤粘結力、摩擦力和土抗力是平臺的抗滑力,桶基平臺應滿足抗滑穩定的要求,以保證平臺的整體穩定性。
  8. An offshore platform is subjected to the action of environment loads such as the wind, wave, flow and ice etc. these loads are long - term and consecutive, so an offshore platform exist more serious vibration during its serving life than other buildings in land

    海洋平臺受風、浪、流和等環境的作用,這些外具有顯著的長期性、連續性特點,因此,海洋平臺在使用過程中存在著較陸上結構更為明顯、持續的振動問題。
  9. Discussion on operation mode at part load for an its system with a base chiller

    帶基主機的蓄冷系統在部分負工況下運行模式的探討
分享友人