噸位井 的英文怎麼說

中文拼音 [dūnwèijǐng]
噸位井 英文
tonnage well
  • : 量詞(重量單位) ton (t. )
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  • 噸位 : tonnage; shipping ton
  1. Located at the north road from dalian to lvshunou district, 5km away from zhoushuizi international airport, dalian ganjingzi chuncheng ring for ging plant ( former dalian ring forging plant ) is a professional forging plant with an annual through put of ten thousand tons above, mainly engagingin the manufa ture of ring forgings, founded in 1990 and covering a land area of 20000m2, with a floorage of 6000m2 and the total assets of 35 million yuan

    大連市甘子春城軋環廠(原大連軋環廠) ,於大連市至旅順口區北路,距周水子國際機場5公里,始建於1990年,廠區佔地面積20000平方米,建築面積6000平方米,資產總額3500萬元,是以生產環形鍛件為主的專業化鍛造廠,年生產能力萬以上。
  2. 1 the company has excellent production condition and public facilities such as self - provide power plant supplying high voltage wire of 35 kv, two sets 16000 kva transformers in power station, one deep well with water discharge of tons per hour, water pool with water pcapacity of 150 tons, one water tower with 100tons, two boilers with four tons, three compressed air machines to make sure the requirement of production. the company located at no. 62haozhuang st. taiyuan city and is 0. 7 kilometer away from dongshan expressway and also 2. 5 kilometer away from the railway station. the company was also equipped with communication facilities for example international telephone and fax

    該公司具有良好的生產條件及公用設施:有自備電廠供給35kv高壓進線,變電站16000kva變壓器兩臺深一眼,每小時出水50蓄水池150水塔1個,容量1004鍋爐兩臺,空壓機三臺,保證生產需求。公司於太原市郝莊正街62號,距東山過境公路0 . 7公里,離車站貨場2 . 5公里,交通十分便利。有國際電話及傳真機等通訊設施。
  3. In order to make the studying about the seismic exploration method possess systematic nature and the ability of tackling key problem in front - zone of mountain, we have done the research work of tackling key problem aiming at the field gathering technology of seismic exploration of the complicated structure belt ( the construction of underground and the earth ' s surface condition are complicated ) of front - zone of mountain in this text, and a large number of relativity trials by the close combination of production and scientific research, summarized a set of field method of the complicated structure belt of front - zone of mountain, adjusted both of trial factor and construction factor of the field gathering in time, achieved finally the goal of making its structure character clear

    近幾年來,隨著地震勘探裝備和技術的改進,野外資料採集技術有了新的進展,主要表現為多種震源聯合激發方法(炮和大可控震源) ,基於地表條件及表層調查基礎上的激發選點方法,小道距、長排列、高覆蓋接收方法,基於模型的「分段、分線、分區」觀測系統目標設計方法等,取得了顯著的勘探效果。為了使山前地震勘探方法研究具有系統性和攻關性,通過本文對復雜山前復雜構造帶地震勘探的野外採集技術進行攻關研究,進行了大量具有針對性的試驗,總結出了一套山前復雜構造帶野外施工方法,最終達到了搞清復雜山前復雜構造帶山前復雜構造帶構造特徵的目的。
  4. Many worker location cold person who forge, 5 100 tonnage punch, well stove, network lead the stove,

    多工冷鍛機, 5 100沖床,式爐網帶爐
  5. It is also used to prevent or solve geologic calamity, such as landslide and rock collapse etc. in addition, it is also used to drill small size water well and hige - pressure jet grouting hole

    適用於水電站鐵路公路邊坡大預應力錨固孔排水孔的施工,以及預防滑坡巖石坍塌等地質災害治理工程。也適用於小型水的施工高壓旋噴引孔的施工。
  6. It also used to prevent or solve geologic calamity, such as landslide and rock collapse etc. in addition, it is also used to drill small size water well and high - pressure jet grouting hole

    Yg - 80a鉆機適用於水電站工程鐵路公路邊坡大預應力錨固孔排水孔的施工,以預防滑坡巖石崩塌等各類地質災害治理工程也適用於小型水鉆高壓旋噴引孔的施工。
分享友人