均質壩 的英文怎麼說

中文拼音 [jūnzhí]
均質壩 英文
homogeneous dam
  • : Ⅰ形容詞(均勻) equal; even Ⅱ副詞(都; 全) without exception; all
  • : Ⅰ名詞1 (性質; 本質) nature; character; essence 2 (質量) quality 3 (物質) matter; substance;...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  1. From sedimentology symbol such as rock assembled, sediment gradus, sandstone grading analysis, protogene sedimentary structure, ichnofossile and logging facies etc and palaeoenvironment background, it is confirmed that shen84 - an12block s34 segment is braid river delta system, not fan delta system ( abrupt slope ). then it can be more partition as braid river delta plain sedimentary assembled, delta front sedimentary assembled and prodelta sedimentary assembled on core and log assembled. and delta plain sedimentary assembled can be identified four microfacies : braided distributary channel, crevasse splay, overbank deposits and interdistributary bay

    沉積微相研究是儲層非性研究的基礎,研究區有豐富的巖芯資料和測井資料,通過巖石組合、沉積韻律,砂巖粒度分析、沉積構造、古生物遺跡和測井相等沉積學標志,結合古環境背景,確定沈84 ?安12塊s _ 3 ~ 4段為辮狀河三角洲體系,而不是前人所認為的扇三角洲(陡坡型)體系,在巖芯和測井組合上可進一步劃分為辮狀河三角洲平原沉積組合、三角洲前緣沉積組合和前三角洲沉積組合,其中三角洲平原沉積組合又可識別出辮狀分流河道、決口扇、分流河道邊部和分流間灣四種微相類型;三角洲前緣沉積組合識別出水下分流河道、水下分流河道邊部和分流河口三種微相。
  2. The author presume the original physiognomy of jiuzhai valley, and acknowledged changhai valley was a surface - water with uniform waterpower, the rize valley was a branch of it but the inequality rise of lithosphere, the deposit of earthquake landslides debris flows and falling or glacier blocked the river - way, furthermore, the flow water with high content of ca ( hco3 ) 2, so tufa dyke formed and evolvement the present dyke of lakes the present physiognomy formed on the base of those 2

    由於地震、滑坡、泥石流引起的堆積物和冰川作用形成的冰磧物堵塞河道,再加上構造運動造成地殼的不勻抬升,九寨溝的這種獨特的地環境以及高含ca ( hco _ 3 ) _ 2的巖溶水流作用下,為caco _ 3沉積創造條件,沉積的caco _ 3加高、連接最終形成灰華堤,使湖泊的形成成為可能。
  3. Because there are several periods of tectonic movement and several tectonic zones " development and complex superposition at da gangshan hydropower staion, geological structure in dam area is great complex and water - bearing media has the characteristic if inhomogeneity, which make it difficult to further clarify the burial condition of different bearing aqueous structure and the development of ground water system at the dam area

    由於大崗山水電站區存在多期次的構造運動以及多個構造帶的共同發育、復合疊加,使得區地構造顯得錯綜復雜以及含水介的不一性,使得進一步闡明區不同承壓儲水構造埋藏條件和區地下水系的發育特點變得很困難。
  4. Through field investigation and analysis indoor, with studying all hydrochemistry data in detail, including macro components and micro components, the author finds out the hydrochemistry feature of ground water. for further specifying the ground water system, with cluster analysis of macro components of surface water and ground water in total 147 samples and the analysis of micro components, including ree, the main ground water systems are distinguished by and large, especially the ground water system main of fault no. 7 and fault no. 15 water bearing belts which have differences at macro and micro components between the two ground water systems, moreover, the main hydrogeochemistry effects are established such as lixiviation, oxidization, precipitation and mixing effect, especially the mixing effect which result in the complexit y of the hydrochemistry of deep bearing tectonic fracture water. based on them, the hydro geological model of upper dam base is established, meanwhile the author summarizes the hydrochemistry feature of weathering crevice water, surface tectonic crevice water and deep tectonic crevice water

    為此,本文以大崗山區水文地球化學問題為研究對象,通過野外調查和室內分析,詳細的研究了區水化學資料,包括宏量組分、微量組分,查明了區地下水水化學特徵,對採集的147個地表及地下水樣的宏量組分進行聚類分析,結合微量元素,稀土元素的研究,並應用二氧化硅地熱溫標確定了深部構造裂隙水的熱源深度,基本區分了區各個主要地下水水系,特別是以f7 、 f15斷裂含水帶為主的地下水系,它們的宏量組分、微量組分以及稀土等方面存在差異,以此為基礎,結合區水文地條件,建立了區的上址的水文地模型,同時通過分析了區花崗巖區的水化學資料,確立了區主要的水文地球化學作用,分別為:溶濾作用、氧化作用、沉澱作用、以及混合作用,混合作用是導致深部承壓裂隙水水化學復雜的主要原因,並總結了區風化裂隙水、淺部構造裂隙水、深部構造裂隙水的水化學特徵。
  5. Research section braided distributary channel sandstone is mostly positive rhythm, and high porosity and seepage rate in its central - top section, low seepage rate kalk interbed in its bottom. underwater distributary channel sandstone is relatively homogeneous positive rhythm, high porosity and seepage rate in its bottom, its top low. distributary mouth bar sandstone is complex rhythm, many interbeds inside

    研究區宏觀非性特點為:研究區辮狀分流河道砂體以正韻律為主,高孔、滲帶在砂體中上部,底部常存在低滲透率鈣夾層;水下分流河道砂體為較的正韻律,下部孔滲高,上部孔滲變小,分流河口砂體為復合韻律,砂體內部夾層多。
  6. The surface deformation monitoring of the side - wall by combination of the forward intersection method with the analytical trigonometric elevation measurement demonstrates that the plane deformation and vertical deformation of the side - wall are small, and the quality of dam filling and side - wall construction is satisfactory

    用能夠滿足精度要求的前方交會法與解析三角高程測量法結合的方法對邊墻表面變形進行監測,結果表明,邊墻平面位移和垂直位移較小,大填築和邊墻施工量可靠。
  7. By applying " none homogeneous multi - laminate element ", hong - kou rcc gravity dam ' s simulation computing of temperature field and stress field at construction period and operation period for all courses and many factors. e. some kinds of methods are discussed in detail for temperature field back analysis, and artificial neural network method for back analysis of thermal parameters of concrete is suggested

    應用「非層合單元法」實現了洪口碾壓混凝土重力施工期、運行期全過程多因素的溫度場及徐變應力場的模擬計算,進行多方案的比較分析,推薦出優選溫控防裂方案,取得了非常滿意的成果。
  8. Coupling analysis of heterogeneous earth dam stability of seepage field and stress field

    穩定性的滲流場和應力場耦合分析
  9. According to the structure layout of futang power station design, geological parameters and calculation results of seepage, the stability and stress of gate chamber and retaining dam are calculated, the security index and stress of anti - slide can can meet the requirement of criterion

    根據福堂電站工程設計的結構布置情況、地參數及滲流計算成果,對閘室和擋水穩定、應力進行了計算,其抗滑穩定安全系數及應力標準滿足規范的要求。
  10. Pore - water pressure distribution calculated by the program is used to slope limited equilibrium analysis, is synthetically analyzed with the fluctuation of the upper reach ' s water level of dam and core - wall dam upper or down are analyzed synthetically when the upper water level changed

    把在計算非穩定滲流中所得到的孔隙水壓力分佈用於邊坡極限平衡分析。綜合分析體上游水位變化時,均質壩上、下游邊坡和心墻上游邊坡安全系數的變化規律。
  11. In view of the seepage hazards existent in the homogeneous soil dam in landong reservoir and on the basis of physical property of the media and geophysical characteristics of the study area, the authors reasonably selected such geophysical techniques as high - density resistivity, ground penetrating radar, transient rayleigh wave and spontaneous polarization to make integrated exploration and find out the seepage path of water sources, thus providing grounds for evaluating stability of the dam body and designing the reinforcement plan

    摘要針對藍洞水庫出現散滲等病險,根據區內各介物理性及地球物理特徵,合理選擇了高密度電阻率、探地雷達、瞬態瑞雷波和自然電場4種物探方法進行綜合勘查,查明病險的水源來向,為評估體的穩定性和加固處理設計提供依據。
  12. Abstract : in view of the seepage hazards existent in the homogeneous soil dam in landong reservoir and on the basis of physical property of the media and geophysical characteristics of the study area, the authors reasonably selected such geophysical techniques as high - density resistivity, ground penetrating radar, transient rayleigh wave and spontaneous polarization to make integrated exploration and find out the seepage path of water sources, thus providing grounds for evaluating stability of the dam body and designing the reinforcement plan

    文摘:針對藍洞水庫出現散滲等病險,根據區內各介物理性及地球物理特徵,合理選擇了高密度電阻率、探地雷達、瞬態瑞雷波和自然電場4種物探方法進行綜合勘查,查明病險的水源來向,為評估體的穩定性和加固處理設計提供依據。
  13. Taking a monotonic soilfill dam as example, a comparison between the incrementally - iterative numerical technique and the equivalent linearization approach was carried out

    以一理想為算例,對上述增量?迭代演算法和常用的等價線性法得到的體動力計算結果進行了對比分析。
  14. In this paper, with complete calculation micro - mechanics method, mass concrete was taken as three - phase composites, which consists of mortar matrix, aggregate and bond between matrix and aggregate. with nonlinear finite element method, the simulation of static and dynamic mechanics performance of the uniaxial compress concrete specimen of dongjiang arch dam and simple supported beam specimen of xiao wan arch dam was studied by means of the software of msc. marc. the number of all kinds of mortar matrix was calculated according to grading of aggregate of three graded concrete and walraven function

    本文採用完全細觀計算力學方法,將大體積混凝土在細觀層次上看成是由粗骨料顆粒、硬化水泥砂漿及其二者之間的粘結界面組成的非復合材料,採用非線性有限元方法,在對大型商業有限元軟體? msc . marc二次開發的基礎上,對東江拱的三級配混凝土軸壓試件、建設中的小灣拱三級配混凝土梁試件在靜、動荷載下的力學性能和破壞過程進行了數值模擬。
  15. Application of genetic algorithm to seepage computation of homogeneous earth dam

    遺傳演算法在滲流計算中的應用
  16. Application of geotechnical fabric in homogeneous earth dam filter construction

    土工織物在反濾體施工中的應用
  17. Sanyuan xijiao reservoir is a uniform earth dam which was constructed in the loess foundation with high water table, so the dam foundation dewatering is the main technique of the project, digging up soft clay of the dam foundation after dewatering and reducing the water in the clay which was filled in dam are also techniques of the project

    三原西郊水庫大是建造在高地下水位黃土地基上的基的降水問題是該工程存在的最大技術難題,同時對降水后基的軟土開挖和上土料的減濕技術也是其關鍵技術之一。
  18. In this paper, the finite element method is adopted to analyze the 2 - d steady and unsteady seepage of earth dams and the program about it is built. there are many examples studied with other methods in documents. in this paper, the same examples are calculated in the program develope d by writer. to compared the result of this paper and the documents ", the veracity of the program is proved

    本文採用有限元的方法對二維穩定和非穩定滲流進行了分析,並編制了二維穩定和非穩定滲流情況下計算各滲流要素的有限元分析程序,利用該程序對文獻中用其他方法分析的的滲流重新進行了計算分析,比較了本計算結果與文獻結果的異同,由此佐證了本文編制的有限元滲流分析程序的正確性。
  19. In the end, the main dam of huangbi - zhuang reservoir is analyzed with the program built in this paper and some reasonable conclusions are drawn about it. there are also some availability suggestions proposed to estimating and inspecting the earth dams and the problems that to be further studied are presented

    由此得出結論,用有限元的方法分析的滲流、評估已建的水工建築物,具有方便、快捷的優點,同時所得結果的可信度高,是一種可行的方案,最後,提出了一些關于土評估方面的建議和有待解決的問題。
  20. With a simplified homogeneous dam body - basement model, during the ground pulse motion, the dams " dynamic responses are analyzed separately with established program and decoupled solution in which explicit finite - element movation solution is combined with multi - transmitting formula

    本文利用簡化均質壩體?基體系模型,用已有程序及波動顯式有限元結合多次透射公式的解耦演算法計算了在脈沖地震動作用下該體模型的動力反應。
分享友人