堰的上游護面 的英文怎麼說
中文拼音 [yàndeshàngyóuhùmiàn]
堰的上游護面
英文
upstream facing of weir- 堰 : 名詞(較低的擋水建築物) weir
- 的 : 4次方是 The fourth power of 2 is direction
- 上 : 上名詞[語言學] (指上聲) falling-rising tone
- 游 : Ⅰ動詞1 (人或動物在水裡行動) swim 2 (各處從容地行走; 閑逛) rove around; wander; travel; tour 3...
- 護 : 動詞1. (保護; 保衛) protect; guard; shield 2. (袒護;包庇) be partial to; shield from censure
- 面 : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
-
( 2 ) validate whether the crest elevation can meet the require of energy dissipation and erosion prevention during the beginning period of flood discharge. ( 3 ) calculate the altitude of downriver cofferdam, and make it meet the require of energy dissipation and erosion prevention. ( 4 ) calculate some average velocity of flow through some sections, including contracted section in stilling basins behind upriver cofferdam, if the hydraulic jump happen in lower reaches of the river. the program will calculate the average velocity of flow of contracted section and the length of the apron
主要設計內容包括:計算上游圍堰后消力池的尺寸;驗證泄洪初期壩面高程是否能夠滿足消能防沖需要;計算下游圍堰堰頂高程,使其滿足泄洪期圍堰和壩體過流的消能防沖和工程進度的需要;計算部分斷面平均流速,包括:上游圍堰后消力池中收縮斷面的斷面平均流速;壩首和壩末的斷面平均流速;當下遊河道發生水躍時,計算下遊河道的收縮斷面平均流速及需要鋪設護坦的長度。In harsh climate region, mere exists obvious local stress concentration near the upstream and downstream of the exposed - in - winter horizontal surface of the rcc dam, and the surface of spillway bucket though heat insulation is applied on the surfaces, tensile stress still exceeds the allowable one of concrete. this paper puts forward to adopt preset crack to avoid occurring more cracks. the special crack model is applied to simulate the dam preset crack, and the joint model of fracture mechanics is induced into strain - soften model
在結構措施方面,針對嚴寒地區高碾壓混凝土重力壩壩體越冬層面的上、下游面附近及溢流壩堰面反弧段表面有明顯的局部應力集中象現,在已採取一定的表面保溫防護的條件下,拉應力仍然超過混凝土容許拉應力,開裂難以避免,進而提出設置碾壓混凝土壩表面預留縫結構措施並對該措施進行深入研究,包括預留縫的擴展穩定和壩體沿預留縫的穩定性,以避免大壩在無措施部位開裂,解決大壩越冬層面水平施工縫的開裂問題。
分享友人