場地勘察 的英文怎麼說

中文拼音 [chǎngdekānchá]
場地勘察 英文
site investigation
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • : Ⅰ動詞(仔細看; 調查) examine; observe; look into; scrutinize Ⅱ名詞(姓氏) a surname
  • 場地 : area; yard; space; place; site; court; field
  1. Did not rush into the staging area. the scene was first assessed

    沒有倉促進入準備待命區。現首先被過。
  2. Went to the test ground and walked around and drew the aerial map, pasted the map on my apartment wall

    他帶我去考形,並繪制形圖,回來以後貼在墻上。
  3. As to planar visco - elastic prediction of settlement, this paper fixes on range of the back - calculation parameters range, analyzes back - calculation parameters which are indispensably in the course of anti - analysis. since it is difficult to acquire the optimization result in simultaneous back - calculation, this paper puts forward a calculation method which combined with investigation data and field experiment data to minimize the parameters to get optimization

    ( 2 )針對二維粘彈性沉降預測,確定了模型反演參數的取值范圍,對于多層軟土基變量同時反演很難獲得最優解的問題,提出結合工程和現實驗以減少參數的方法獲得最優解。
  4. The author mainly discussed the importance and some special notes in the proof - text of groundwork with other confreres, enhanced the owners and interelated departments ' recognition of the proof - text of groundwork, through a case study in shenyang city of liaoning province in northeast china

    摘要針對目前基驗槽工作存在的問題與不是,利用相關的技術規范並結合部分工程實例,探討分析基驗槽工作的重點及質異常的處理方法,歸納總結基驗槽工作出現問題的原因,重申基驗槽工作的重要性,用以加強業主及相關部門對基驗槽工作的重視。
  5. Maybe they could reverse - engineer a fly to make a robotic device that could reconnoiter5 dangerous places, such as earthquake zones or collapsed mines

    也許他們能以還原工程的方式來解析蒼蠅,進而製造出一種機器人裝置,用來震區或塌陷礦之類的危險區。
  6. According to the data of drilling and other geological investigation on the lpg storage of jinzhou, and taking into account main factors that affecting stability of the storage and other classification standard, this paper selects five evaluating factors. using pattern recognition method and muti - step fuzzy classification clustering method to classify

    根據錦州lpg洞庫的資料,考慮到影響洞庫圍巖穩定性的主要因素,結合已有的分類標準,本文選取了5個評價因子,用模式識別法與多級模糊聚類法來進行巖體的穩定性分類。
  7. Specifications for offshore platform engineering geology investigation

    海上平臺址工程規范
  8. Specifications for offshore platform engineering geology in vestigation

    海上平臺址工程規范
  9. Furthermore, the company provides investigation and design of installed fields according to different demands of customer

    從售前現設計,配套方案的選購、到器材安裝,一切均以客戶的需求為主。
  10. The main mission of simulation is to help trouble removal people reconnaissance field, calculate parameter and analyze causality fast. and with these, the reason for accident, the policy on how to avoid accident and minimize loss will be conclude

    其主要任務是輔助事故處理人員快速、高質量進行現、參數計算和因果分析,進而研究事故發生的原因,探求避免事故、減少損失的策略。
  11. Based on the investingation and some study methods of the stability on the goaf, the paper has the goaf of the first and second tunnels of wu long channel on coal mine railway leased line in da ning of shanxi province as an example, according to the engineering geological invesitigation and maping in the earth ' s surface, also combining the visit on the relate people, firstly has a geological judge on the space extend of the mostly ledges which have been picked ; then adopts the instrument of engineering surveying and checking ( for short sws ) which is relatively advanced inside and outside to test by surface wave the rockmass and solid near the middle line of the tunnel ( total forty meter ), and has a relatively exact judgment on the place that the goaf impossible reveal ; lastly passing the validate by drilling, it make clear that the results which tested by sws is reasonable and believable, based on finding out clearly the space extend of the goaf, the author makes a relatively systemic study on the stability of wall rock around the goaf

    因此,查明采空區的具體位置,在此基礎上對進行工程適宜性評價,對整個工程建設具有重要的指導意義。本論文在總結前人對下采空區及有關穩定性研究方法的基礎上,以山西大寧煤礦鐵路專用線五龍溝1 ~ # 、 2 ~ #隧道采空區為研究實例,在詳細的表工程質調查和測繪的基礎上,結合通過對采空區有關人員的探訪,首先對主要開采礦層的空間展布進行質判斷;然後採用國內外較為先進的工程探與檢測儀(簡稱「面波儀」 ) ,對1 ~ # 、 2 ~ #隧道中線兩側一定范圍內(共40米)進行了面波測試,對采空區的可能出露部位進行了較為準確的判斷;最後通過鉆探加以驗證,表明面波儀的測試結果是較為合理可信的。
  12. Because of the engineering geological happening, the magnitude losing have often taken place on the process of design actualizing and engineering building practicality running though the designing is provided with engineering geological investigation measure of the field on engineering exploitation activity of the subaqueous delta of yellow river

    在黃河水下三角洲開發的工程活動中,盡管設計都是針對具體的工程資料進行的,但在設計方案實施和工程構築物實際運行中,常因始料未及的工程質事件發生,造成巨大的損失。
  13. The geological exploration of xijin building was completed in aug., 1994, and five years later, the foundation pit pumping was started

    摘要西金大廈場地勘察工作於1994年8月完成, 5年以後開始基坑降水工作。
  14. Standard guide for field logging of subsurface explorations of soil and rock

    土壤和巖石的現記錄用標準指南
  15. Based on abroad consultations and studies on national and foreign related datum, mainly taking shenzhen luohu fracture zone for research object, and by means of analysis on locale monitoring datum analysis, laboratory routine rheopectic testing, finite element numerical simulation and appraisal of gis stability, a few of conclusions can be summarized as the following : ( 1 ) analyzing present and past geological reconnaissance datum and reports of stability appraisal in luohu jiancheng district and synthesizing a mass of crustal stress monitoring datum and huangbeiling faultage f8 monitoring datum, and combining closely with practical engineering activity in luohu district, characteristics of crustal stress distribution is deeply discussed, which has an important guiding meaning for studying region stability and underground structure safety in luohu district

    本文在廣泛查閱、研究國內外有關資料的基礎上,主要以深圳羅湖破碎帶為研究對象,通過現實際監測資料分析、室內常規流變試驗、有限元數值模擬以及基於gis的穩定性評價,可以得到以下幾點結論: ( 1 )分析了羅湖建成區以前和現今的資料、穩定性評價報告,綜合大量的現今應力監測資料和黃貝嶺f8斷層監測資料,緊密結合羅湖建成區的實際工程活動,深入探討了羅湖區的應力分佈特徵,這對于研究羅湖區區域穩定性和下建築物的安全性具有重要的指導意義。
  16. Based on the engineering geologic investigation reports of 22 buildings and the author ' s own tests in lab ( which includes 18 groups of conventional test and compression test, 8 groups of unconsolidated undrained triaxial test and 8 groups of quick direct shearing test ), taiyuan silt is studied in the paper. firstly, the variability of silt indexes is analyzed. the analyses results show the change laws on variability, in addition, the average value and variability coefficient ranges of silt indexes are given for reference

    本文以太原區粉土為研究對象,在收集、整理了22個建築工程場地勘察報告和作者室內試驗成果( 18組常規試驗和壓縮試驗、 8組不固結不排水三軸剪切和8組直剪快剪試驗)的基礎上,對太原粉土作了以下方面的分析研究:首先研究了粉土工程性質指標的變異性,得出了變異系數的變化規律,給出了各工程性質指標均值和變異系數范圍的建議值。
  17. I can ' t remember ever going on a field check or some group sessions without coming back with at least one idea that could help us do a better job

    我幾乎每一次到產品銷售現以及參加一些團體座談會回來后,至少都會產生一個新的創意來幫助我們將工作做得更好。
  18. Under the combined action of above - mentioned four factors, the complex rock mass at right bank which consist of two weak rock mass bands and superficial unloading relaxed rock mass came into being

    其相關系數在0 . 85以上。在此定量化基礎上,結合現分類以及水利水電工程規范,通過對比綜合,得到研究區巖體質量分級。
  19. Guide to site investigation geoguide 2

    場地勘察指南
  20. Through in - situ prospecting, the data about the region and near region seismic activity, geological tectonics as well as the earth geophysical fields have been gained and, the seismic risk analysis of this site has been carried out

    通過現,獲得區域、近區域震活動、質構造、球物理等資料,並對工程址進行了震危險性分析。
分享友人