堵口堤 的英文怎麼說
中文拼音 [dǔkǒudī]
堵口堤
英文
closing dike-
Seawall and sluice are the parts constructed in advance, while final closure is the last part in construction. the hydraulic condition during the final closure process is worse than that during any other processes. and with the compressing of the entrance, the hydraulic condition becomes badly, the drop height of entrance can reach 2 to 3 meter, the maximum velocity of flow even reaches 6 to 8 meter per second and flow condition also becomes complex
海堤和水閘的修建都是圍海工程先期施工的部分,堵口則是海堤修築的最後階段,堵口合龍成敗關繫到圍海工程成敗,由於此階段所遇到的水力條件十分惡劣,口門落差可達2 3m ,流速最大可達到6 8m / s ,且水流極其復雜,根據我國《圍海工程技術規范》規定圍海堵口必須進行龍口水力計算。Others, men and women, dipped in the puddles with little mugs of mutilated earthenware, or even with handkerchiefs from women s heads, which were squeezed dry into infants mouths ; others made small mud embankments, to stem the wine as it ran ; others, directed by lookers - on up at high windows, darted here and there, to cut off little streams of wine that started away in new directions ; others devoted themselves to the sodden and lee - dyed pieces of the cask licking, and even champing the moister wine - rotted fragments with eager relish
還有的人,有男有女,用殘缺不全的陶瓷杯子到水窪里去舀有的甚至取下女人頭上的頭巾去蘸滿了酒再擠到嬰兒嘴裏有的用泥砌起了堤防,擋住了酒有的則按照高處窗口的人的指示跑來跑去,堵截正要往別的方向流走的酒,有的人卻在被酒泡漲被酒渣染紅的酒桶木片上下功夫,津津有味地咂著濕漉漉的被酒浸朽的木塊,甚至嚼了起來。Generally reclamation engineering includes seawall, sluice and final closure
圍海工程一般包括海堤、水閘、堵口三部分。
分享友人