堵河 的英文怎麼說

中文拼音 []
堵河 英文
du he
  • : Ⅰ動詞(堵塞) stop up; block up Ⅱ形容詞(悶) stifled; suffocated; oppressed Ⅲ名詞1 [書面語] (墻...
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  1. On the slow weedy waterway he had floated on his raft coastward over ireland drawn by a haulage rope past beds of reeds, over slime, mud - choked bottles, carrion dogs. athlone, mullingar, moyvalley, i could make a walking tour to see milly by the canal

    他乘了這條用一根纖繩拽著的木排,順著涓涓流淌雜草蔓生的道,涉過葦塘,穿過爛泥,越過一隻只滿淤泥的細長瓶子,一具具腐爛的狗屍,從愛爾蘭腹地漂向海岸。
  2. Then a lake formed, probably after an eruption blocked some rivers or streams.

    可能是一次火山噴發之後,一些流或溪水被塞了,形成了湖泊。
  3. The author presume the original physiognomy of jiuzhai valley, and acknowledged changhai valley was a surface - water with uniform waterpower, the rize valley was a branch of it but the inequality rise of lithosphere, the deposit of earthquake landslides debris flows and falling or glacier blocked the river - way, furthermore, the flow water with high content of ca ( hco3 ) 2, so tufa dyke formed and evolvement the present dyke of lakes the present physiognomy formed on the base of those 2

    由於地震、滑坡、泥石流引起的堆積物和冰川作用形成的冰磧物道,再加上構造運動造成地殼的不均勻抬升,九寨溝的這種獨特的地質環境以及高含ca ( hco _ 3 ) _ 2的巖溶水流作用下,為caco _ 3沉積創造條件,沉積的caco _ 3加高、連接最終形成灰華堤壩,使湖泊的形成成為可能。
  4. Borehole sealing technology used in north huihe river in honghuaerji coal - bearing basin

    紅花爾基煤盆地輝以北礦區鉆孔漏技術
  5. Energy losses leading to a decrease in head are also done away with, likewise losses in flow rate from the screening installations, both of which can have a detrimental effect on the efficiency of the facility. the constructional effort required for a hydrodynamic screw is small compared to that required for a turbine. if the compact version of a hydrodynamic screw hydrodynamic screw trough power take - off unit combined as a single unit is used, the constructional effort can be further reduced

    水力螺旋機技術的優點有:無需監控系統,可自行調節水體供給和供給頻率運行效率高於水輪機和小型渦輪機效率梯度平穩轉速低20rpm - 80rpm ,運行穩定防磨損無需定期清潔,易維護對道湖泊里的魚蝦無損害基礎工事少,安裝簡便無塞,無需隔欄裝置能量利用充分等。
  6. The local people dammed up the river to make a lake for their water supply

    當地人把起來造湖,以便使用。
  7. On that side it was a good many miles wide, but on the missouri side it was the same old distance across - a half a mile - because the missouri shore was just a wall of high bluffs

    在這一邊,面有好幾英里路寬。不過在伊利諾斯州那一邊,還是原來那樣的距離半英里路寬因為在伊利諾斯州那一邊,沿岸盡是一高墻似的峭壁。
  8. As they were situated directly in the proposed reservoir site, they were resettled in tai long wan, a western coastal area of lantau island and a resettlement area in tsuen wan. others, whose land was included as part of the catchment area, or affected by the construction of the catchwaters, faced a different situation. among them, the residents of pui o including lo wei village and sun wei village, ham tin, law uk, san shek wan, upper cheung sha and lower cheung sha village, tong fuk and shui hou village suffered from disturbance to their natural water supply

    一些被興建引水道影響或被辟為集水區的村落,如貝澳老圍村、新圍村、咸田村、羅屋村、散石灣、長沙上村、長沙下村、塘福村及水口村,原來流經村落的流及地下水源,因主要水流被引水道截,農田無足夠水灌溉,早造開耕嚴重不足,居民須往他鄉運水,以應付日常生活急需及維持灌田。
  9. Large stretches of the canal north of the yellow river are now dry, filled in completely or heavily polluted

    北邊的一大段運如今已經乾涸見底,要麼塞的滿滿當當,要麼污染得一塌糊塗。
  10. If it is really necessary to stuff or block up or demolish them, consent should be obtained from the water conservancy administrative department and the case be reported to the people ' s government of the city for approval

    城市建設不得擅自填原有道溝叉、貯水湖塘窪淀和廢除原有防洪圍堤;確需填或者廢除的,應當經水行政主管部門審查同意,並報城市人民政府批準。
  11. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃小浪底水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐設計有3條排沙洞,擔負著泄洪、排沙、調節徑流和保證進水口不被泥沙淤的任務.根據排沙洞的水庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例
  12. At present, liaohe oilfield is in its middle and late stages of exploration and development, which means it is more difficult to keep a stable production. in recent years, a series of stimulation measures such as reperforation, water plugging and so on have been taken in different parts of the field to improve oil production and relax the natural depletion

    目前,油田勘探和開發均已進入中、後期,穩產難度越來越大,為了阻止原油產量的遞減,近幾年遼油田在全油區都不同程度地加大了進攻性措施的工作量,對油井採用了補層、水等一系列技術措施,大大的提高了油井的產量,有效的緩解了全油田產量的自然遞減。
  13. On the basis of the result of the research on the landslide damming of river, failure of landslide dam, outburst flood and landslide surge, the failure of the part of landslide will arise a maximum surge height to 6m at the dam site, at the same time, the height of landslide dam will reach possibly 33m, and the flood peak of outburst flood will reach 15841 ~ 7613m3 / s, and make water level to rise at 11 ~ 4m through jinjiang to xiluodu of the jinsha river

    江潰壩及涌浪研究結果表明,局部的邊坡失穩在壩址處引起的涌浪高達6m ,並可能形成高約33m的滑坡江壩,潰決洪水將在金江至溪洛渡段形成15841 7613m ~ 3 / s的洪峰流量,使得此段江水位上漲11 4m 。
  14. Ice dam, ice cover and ice jam, which are farmed by stack, jammed and collective ice, can increase river resistance and water stage, resulting in flood, construction damage and navigation problems

    冰塊堆積,塞和聚集形成的冰壩、冰蓋和冰塞會導致道阻力增加,致使上游水位上漲,並可能造成冰期洪水,建築物破壞,航運不暢等危害。
  15. The gold, washed down the mountain by the river and left in the riverbed near patu, kept on coming

    流從山區沖刷下來的金子,沉積在八附近的床中,源源不絕。
  16. It was a monstrous big river here, with the tallest and the thickest kind of timber on both banks ; just a solid wall, as well as i could see by the stars

    這里已是一片浩瀚的大,兩岸參天的大樹濃濃密密,星光照處,彷彿是一結結實實的城墻。
  17. Therefore, we can conclude from the predictions of reservoirs and pressure in the area that the major exploration prospects should be the reservoirs between the fl and f2 faults and the turbidity fan sandstones in the down - block of f2 fault

    F5斷層封性能相對較差。從儲層預測和壓力預測結果看,本區沙街組的勘探重點應該放到中臺階及下臺階二號斷層下盤附近的濁積體發育區。
  18. Burn all wood to white ash, grind small coals to ash between your gloved hands, thoroughly soak with water, and scatter the remains over a large area away from camp

    將所用的木材燃燒成灰后帶上手套將小的炭木碾成粉末,用水完全浸濕,把這些剩餘物拋散在離營地遠處的周圍,不要丟棄在裡以免道。
  19. A new criterion for blockage of main flow is obtained by approaching to the influence factors and the modes of blockage

    探討泥石流堵河的影響因素和堵河體的形式,提出新的堵河判別條件。
  20. Study on plant diversity of duheyuan nature reserve on the northern slope of mt. shennongjia, hubei, china

    神農架北坡堵河源自然保護區植物多樣性研究
分享友人