墩座 的英文怎麼說

中文拼音 [dūnzuò]
墩座 英文
pier base
  • : Ⅰ名詞1. (土堆) mound 2. (墩子) a block of stone or wood Ⅱ量詞(用於叢生的或幾棵合在一起的植物) cluster
  1. A little hamlet, whose roofs were blent with trees, straggled up the side of one of these hills ; the church of the district stood nearer thornfield : its old tower - top looked over a knoll between the house and gates

    一個小村莊零零落落地分佈在一小山的一側,屋頂與樹木融為一體。地區教堂坐落在桑菲爾德附近,它古老的鐘樓俯視著房子與大門之間的土
  2. Abstract : based on the principle of mininmum potential and using rayleigh - ritz method, the geometric non - linear analysis of higher bridge piers was solved in this paper. the new concept of equivalent horizontal force proposed by the author may be casily to calculate the second effect, which was produced due to the vertical forces and resisted by the piers and rubber pad bearings incorporately. the simple formula in this paper are applicable to calculate by hand, understood clearly without computation of successive iteration, higher precision and graspable easily for the disigmer therefore it has the practical significance

    文摘:根據最小勢能原理,用瑞雷-里茲法解決了高橋的幾何非線性分析問題;其次,提出了等效水平力的新概念,可以方便地解決橋和板式橡膠支聯合抵抗垂直力所產生的二次效應問題.筆者提出適合於手算的簡便計算公式,概念明確,勿須迭代運算,精度較高,易為設計人員掌握,因此具有實用價值
  3. Each bridge is a two girder continuous structure extending over three spans with small haunches at the interior piers.

    每一橋是雙主梁的連接梁,延伸三跨,在中間橋處具有小的加腋承托。
  4. The first modern-style skyscraper rose a stubby ten stories above chicago's streets.

    第一現代風格的摩天大廈在芝加哥的大街上升起矮的十層。
  5. Based on the stochastic finite element method, the reliability of the arch dam gravity abutment is analyzed, and the corresponding reliability index is calculated

    然後在隨機有限元的基礎上進行拱壩的拱? ?重力的強度和抗滑穩定可靠度分析,計算相應的可靠指標。
  6. The keqikesubutai bridge is a long span railway bridge with high - rise piers located in the strong wind pressure and active seismic region, and is also a key construction project and the highest bridge on the jinghe - ining - horgus railway

    摘要克其克蘇布臺特大橋是一位於高風壓、高地震區的高大跨鐵路橋梁,是精伊霍鐵路的重點工程之一,為全線最高橋。
  7. It is 1939 meter long, and 7. 32 meter wide

    計有32, 31個橋孔。
  8. A platform or mound of earth within a fort from which guns are fired over the parapet

    ,炮堡壘內部的平臺或土,大炮可從中越過胸墻而發射
  9. Two great towers support four huge cables

    巨大的橋支撐著四根巨型鋼纜。
  10. Abstract : at first, the shaking table test of a gravity pier model was done. the comparison between the test data and the theoretical analysis results of the model showed that they are identical to each other. the dynamic model of a whole bridge with gravity piers and lead - rubber bearings was set up. the positive role of lead - rubber bearings on lowering the seismic responses of railway bridge and the seismic character of gravity piers were analysed. some earthquake resistance measures of railway bridge with gravity piers were put forward

    文摘:首先進行了重力式橋模型振動臺模擬地震試驗,試驗與理論分析結果基本一致;然後建立了採用鉛芯橡膠支的重力式橋橋梁全橋體系動力分析模型,計算分析了鉛芯橡膠支對橋梁的減、隔震作用及重力式橋的抗震性能,提出了重力式橋橋梁的抗震措施。
  11. By statistically analyzing the test data, a regression formula has been attained. second, the influences of seismic wave, foundation of a bridge and the mechanical properties of lead - rubber bearing on the response of an isolated bridge with the lead - rubber bearing was investigated. several conclusions for properly applying lead - rubber bearing in isolated bridges have been made

    其次,利用單模型,系統地研究了地震波特性、鉛芯橡膠支參數、橋梁下部結構特性及場地土特性等對隔震橋梁動力響應的影響,提出了在橋梁隔震中合理使用鉛芯橡膠支的一些建議。
  12. Inertia block water pump

    惰性減震墩座
  13. To pass over the east rail tracks and the slaughterhouse sidings, a new bridge with a clear span of 250 m will be required

    要興建一條這樣的高架橋,部分橋無可避免會落於屠房內,對屠房的運作造成干擾。
  14. Taking the long span continuous rigid - frame structure of the south bank approach spans of wuhan tianxingzhou changjiang river bridge as the research object, and using the large scale finite element analysis program ansys and two ways of modeling with solid element and spatial beam element, this paper respectively analyzes the dynamic characteristics of the rigid - frame structure of the approach spans, makes a study of the influences of rigidity changes and bearings failure of the thin - wall piers on the dynamic characteristics of the structure of the approach spans and also compares the results of numerical analysis of the two kinds of modeling

    摘要以武漢天興洲長江大橋南岸引橋大跨度連續剛構為研究對象,運用大型有限元分析程序ansys ,採用實體模型與空間梁單元兩種建模方式,分別分析了其動力特性,探討了薄壁的剛度變化與支失效對其動力性能的影響,並對兩種模型的數值分析結果進行了比較。
  15. The earthquake load of its main pile was reduced by over 80 percent. the second sample is a railway simple - beam bridge. the earthquake load of its main pile was reduced by over 50 percent

    實例分析表明:設計的鉛芯橡膠支具有明顯的減震效果,在連續梁橋中,制動的減震率達80以上;簡支梁橋中,減震率達50以上。
  16. Next, a three - span curve continuous box beam has been studied by fem, and how to set the single - pedestal pier in curve continuous box beams has been discussed. when setting the single - pedestal pier, the vehicle flow should be inspected firstly, and then a best offset distance should be selected within the feasible range of the offset distance. meanwhile, increase the spacing interval of the double supports to the largest extent when installing a double supports on a sharing single - pedestal pier, which can enhance the stability and security of the bridge as a whole

    對上石立交橋中一三跨連續的曲線箱梁進行有限元分析,詳細地討論了在曲線箱梁中如何合理設置獨柱的問題,分析表明獨柱的設置應該根據車流調查的實際情況,再結合結構本身的特徵,在可行的偏距范圍內選擇一個最佳的偏距,另在對公共上的雙支進行設置的時候應該盡量使雙支的間距增大,這樣可以保證橋梁整體的穩定性和安全性。
  17. The lost city : according to historic records, river keliya is in the territary of qianmi country of the 36 countries of west land, a great power along the silk road, keladun is one of the city of the kingdom, then why build a city in the deep of a desert

    《迷失的城》 :據漢書記載,克里雅河流是當時西域36國中扦爾國的地望,是那時絲路南道國力最強的國家這一,喀拉是個王國的一城池,那麼,為什麼要將一城池建立在沙漠深處呢?
  18. Pedestal fire hydrant

    消防栓
分享友人