壁錨 的英文怎麼說

中文拼音 [máo]
壁錨 英文
wall tie
  • : 名詞1 (墻) wall (of a house etc ) : 銅墻鐵壁 bastion of iron2 (作用像圍墻的部分) wall of st...
  • : 名詞(鐵制的停船設備) anchor
  1. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用鋼筋砼護確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  2. The new synthesized protein was led to endoplastic reticulum cavity by eukaryotic secretory signal peptide sequence and then anchored to innerwall of endoplastic reticulum by kdel sequence, which interdicted the process of protein entering golgi body and cytoplasm, and then avoided heterogeneous glycosylation modification of foreign protein and prolonged the disappearance of half life of protein in organism. 2

    真核分泌信號肽序列可以引導新合成的蛋白質進入內質網腔, kdel序列將進入內質網腔的蛋白質定在內質網內上,從而阻斷了蛋白質進入高爾基體和細胞質的過程,進而避免了外源蛋白質的異源糖基化修飾,延長了蛋白質在生物體內的半衰期。
  3. In this thesis, the technological way that prevent the anchorage pile and the concrete of anti - force beam from crazing, and the technological application of ultrasonic determine apparatus to detecting are introduced during engineering of trial pile by inducting prestressed technology to anchorage pile and anti - force frame

    論文還介紹了在試驗樁工程中,通過預應力技術引入樁及反力梁系統,防止樁和反力梁混凝土開裂的技術途徑,和超聲波側測定儀檢測技術的應用。
  4. Construction technology for pre - stressed anchor - rope in buttressed retaining wall

    預應力索在扶式擋墻中的施工技術
  5. In tank seismic design considered the liquid sloshing, hydrodynamic pressure of tank shell, uplifting condition of unanchored tank and effective bottom plate width

    而未定儲槽的槽上舉狀態分析,應將有效上舉部分的底板列入設計考量,這些都是儲槽耐震分析的重點。
  6. Testing study of rock mechanics in lab for shuibuya project underground plant

    百色水利樞紐地下廠房巖梁載荷試驗桿應力分析
  7. According to the the regression analysis on the bloting and shotcreting roadways of henan pingmei group, the regression equation on the degree that absolute grade and area of roadway influence coefficient of frictional resistance is built in the paper. the notable character test of the regression equation is completed. at last, the degree that absolute grade and area of roadway influence coefficient of frictional resistance is discussed and summed up. the practical and guiding sense in choosing coefficient of frictional resistance of congeneric roadways is given in the paper

    通過對平煤集團大量的噴巷道的回歸分析,建立了巷道面絕對粗糙度和巷道斷面積對摩擦阻力系數影響程度的回歸方程,並對回歸方程作了顯著性檢驗,最後對巷道粗糙程度和斷面積對噴巷道摩擦阻力系數的影響程度進行了討論和總結,對同類巷道摩擦阻力系數的選取具有實踐指導意義。
  8. Abstract : anchor packer is one of the important downhole tools which areused in oil production and waterflood technical operation, such as layer waterflood, layer fracture or acidation, mechanical water block. after anchor is fixed in the simulated test unit, the invasion depth of the casing can be known with the help of the sensor around the casing wall, and then the failure degree is concluded. this is very important for the anchor packer design and site operation

    文摘:在油田開發中封隔器是實施機械採油、分層注水、分層壓裂或酸化、機械卡堵水等注采工藝作業的主要井下工具之一,封隔器上的卡瓦是保證工作可靠性的重要元件,把卡瓦安裝在模擬試驗裝置中,通過在套管周圍分佈位移傳感器,測得卡瓦定后切入套管深度,判斷卡瓦對套管的損傷程度,這對封隔器的設計和現場使用具有十分重要的意義。
  9. Stress response of the tower wall at the least favorable section of all of the single section on the cable tower anchor segments of the cable - stayed bridge was studied under the annular pre - stress with cable force and tensile force by comparing the experiment results of the full - scale model of segment with the results of the finite element simulation analysis according to the forced status of the cable tower under practical conditions

    摘要通過索塔固區節段足尺模型試驗結果和有限元模擬分析比較,結合索塔受力的實際工況,對異型截面斜拉橋索塔固區節段最不利斷面在環向預應力與索力共同作用下塔的應力響應進行了研究。
  10. The experiment of reinforcing wall of stope with cable - anchors has proven that stability graphical method is practicable, in which the determined cable - anchor supporting parameters and stress analysis are rational fairly

    采場幫壁錨索加固試驗證明,穩定性圖解設計法是切合實際的,確定的索參數及受力分析是比較合理的。
  11. ( 4 ) two component anchor bolt and dowel are afforded, a formulas to calculate the punching capacity of this slab - column connection with the effect of punching component is given in the article. comparing with other kinds, the two punching component is effective. ( 5 ) the possible destroy patterns of this slab - column system are discussed in the text, and design principle and step in detail about slab - column connection are

    ( 4 )提出抗沖切栓和銷釘兩種新型抗沖切元件,給出配置抗沖切元件時板柱節點的承載力計算公式;通過比較表明,這兩種新型抗沖切元件對薄箱體現澆混凝土空腹板來說是有效的。
  12. I was to go down the sandy spit that divides the anchorage on the east from the open sea, find the white rock i had observed last evening, and ascertain whether it was there or not that ben gunn had hidden his boat ; a thing quite worth doing, as i still believe

    我打算到把東面的地和海隔開的沙尖嘴上去,找到我昨天傍晚發現的那面白色巖,看看本噶恩的小艇是不是藏在那裡,到現在我仍然認為這件事值得去試一試。
  13. The researches on the stability of compound soil nailing show that it is important to determine the safety coefficient and the most dangerous slipped layer of soil slope retained by compound soil nailing in the stability analysis of compound soil nailing. water, prestressed anchor and cement - soil retaining wall and front small - piles in the compound soil nailing system have a great influence on the stability of the whole compound soil nailing system. the front small - piles in the compound soil nailing system can improve the stability of the soil slope

    復合土釘穩定性分析表明,復合土釘支護時土坡穩定的安全系數和最危險滑裂面的確定對于穩定性分析非常重要;土體內水對土體穩定性有很大的影響作用;設置超前微樁后,能增加基坑邊的穩定性;增設深層攪拌樁后,邊抗傾覆、抗滑移安全系數增大,同時面層強度的增加更有利於復合土釘支護體系內其它組件間的相互作用;增設預應力桿(索)和預應力土釘,對于控制基坑邊位移有重要作用,可明顯提高滑移面上土體的抗滑力。
  14. I was pretty far down on the low, sandy spit that encloses the anchorage to the east, and is joined at half - water to skeleton island ; and now, as i rose to my feet, i saw, some distance further down the spit, and rising from among low bushes, an isolated rock, pretty high, and peculiarly white in colour

    眼下我所處的地方是向東環抱地伸入海中相當遠的一個沙尖嘴,它半沒人水中與骷髏島相連。現在,當我起身的時候,我看到在沙尖嘴下面更遠的地方矗立著一堵孤零零的巖,它位於低矮的灌木叢中,相當高,顏色特別自。
  15. Entry bolting with wire mesh in fully mechanized top - coal caving face at fourth coal mine in hebi mining bureau

    四礦綜放開採回采巷道全網支護
分享友人