壩址洪水 的英文怎麼說

中文拼音 [zhǐhóngshuǐ]
壩址洪水 英文
dam-site flood
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • : 名詞(建築物的位置; 地基) location; site; ground; foundation
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • 洪水 : waterflood; deluge; flood; flowage; torrent; spate; flood water; [義大利] acqua alta洪水泛濫 floo...
  1. In the second part, we choose four stations on the basin which up the long - tan dam - site, and estimate a multidimensional auto regression model to model the daily discharge. then test the model and the simulate effect of the modified flood series

    第二篇中選擇龍灘以上流域的四個站,通過建立多維自回歸模型對其日流量進行隨機模擬,然後對模型和模擬生成的系列進行模擬效果檢驗。
  2. In the first part, we compute the site design flood of given design frequency ( 0. 01 %. 0. 1 %. 0. 2 % and 1 % ) using the design flood hydrograph. then we get the design reservoir inflow flood of the same design frequency by the resultant discharge method. according to the computing value we compare the site design flood and design reservoir inflow flood of different time interval

    本論文以廣西紅河龍灘電站為例,在第一篇中採用過程線法計算了給定設計頻率為0 . 01 、 0 . 1 、 0 . 2和1的設計,並利用合成流量法計算了相應設計頻率的入庫設計
  3. On the basis of the result of the research on the landslide damming of river, failure of landslide dam, outburst flood and landslide surge, the failure of the part of landslide will arise a maximum surge height to 6m at the dam site, at the same time, the height of landslide dam will reach possibly 33m, and the flood peak of outburst flood will reach 15841 ~ 7613m3 / s, and make water level to rise at 11 ~ 4m through jinjiang to xiluodu of the jinsha river

    堵江潰及涌浪研究結果表明,局部的邊坡失穩在處引起的涌浪高達6m ,並可能形成高約33m的滑坡堵江,潰決將在金江至溪洛渡河段形成15841 7613m ~ 3 / s的峰流量,使得此段江位上漲11 4m 。
  4. Hongjiadu hydraulic power plant is the only leading water storage reservoir of wujiang cascade hydraulic stations, which is a full - time storage reservoir. 2 * landslide body is distributed at the right side of downstream, which is just located in the region of energy dissipation. erosion gully may cut the bottom of the landslide body. there are roads on the top of the landslide body during the construction period and operating period

    家渡電站是烏江梯級電站中唯一具有多年調節性能的「龍頭」庫, 2 #塌滑體分佈於下游右岸,恰好位於泄消能防沖區內,沖坑將塌滑體下部切腳,而且施工期和運行期在其上都布置有公路,因此2 #塌滑體失穩將影響整個電站的正常運行。
分享友人