壩址調查 的英文怎麼說

中文拼音 [zhǐdiàozhā]
壩址調查 英文
site inspection
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • : 名詞(建築物的位置; 地基) location; site; ground; foundation
  • 調 : Ⅰ動詞1 (配合得均勻合適) harmonize; suit well; fit in perfectly 2 (使配合得均勻合適) mix; adju...
  • : 查名詞1. [植物學] (山查) hawthorn; haw2. (姓氏) a surname
  • 調查 : 1 (為了解情況進行考察) investigate; examine; inquire into; look into; survey; (try to) learn ...
  1. Through field investigation and analysis indoor, with studying all hydrochemistry data in detail, including macro components and micro components, the author finds out the hydrochemistry feature of ground water. for further specifying the ground water system, with cluster analysis of macro components of surface water and ground water in total 147 samples and the analysis of micro components, including ree, the main ground water systems are distinguished by and large, especially the ground water system main of fault no. 7 and fault no. 15 water bearing belts which have differences at macro and micro components between the two ground water systems, moreover, the main hydrogeochemistry effects are established such as lixiviation, oxidization, precipitation and mixing effect, especially the mixing effect which result in the complexit y of the hydrochemistry of deep bearing tectonic fracture water. based on them, the hydro geological model of upper dam base is established, meanwhile the author summarizes the hydrochemistry feature of weathering crevice water, surface tectonic crevice water and deep tectonic crevice water

    為此,本文以大崗山區水文地球化學問題為研究對象,通過野外調和室內分析,詳細的研究了區水化學資料,包括宏量組分、微量組分,明了區地下水水化學特徵,對採集的147個地表及地下水樣的宏量組分進行聚類分析,結合微量元素,稀土元素的研究,並應用二氧化硅地熱溫標確定了深部構造裂隙水的熱源深度,基本區分了區各個主要地下水水系,特別是以f7 、 f15斷裂含水帶為主的地下水系,它們的宏量組分、微量組分以及稀土等方面均存在差異,以此為基礎,結合區水文地質條件,建立了區的上的水文地質模型,同時通過分析了區花崗巖區的水化學資料,確立了區主要的水文地球化學作用,分別為:溶濾作用、氧化作用、沉澱作用、以及混合作用,混合作用是導致深部承壓裂隙水水化學復雜的主要原因,並總結了區風化裂隙水、淺部構造裂隙水、深部構造裂隙水的水化學特徵。
  2. On the basis of a full investigation and study and an integrated analysis of the geological setting and rock - mass mechanical environment of the bank slopes of the hydroelectric project area on the mainstream of the jinsha river and by combining the qualitative analysis with the quantitative evaluation, the authors calculated the instability of the sliding masses according to 1 / 8 and 1 / 11 of the total cubic capacity of the materials falling into the river and the surge wave heights at the falling sites as well as at the xiangjiaba and xiluodu dam sites and in adjacent townships according to the calculation method of the surge wave diagram given by the american society of civil engineers, made the risk evaluation of the bank slope instability with respect to the operation safety at the dam, safety of the cities and townships around the reservoir and safety of the reservoir operation, and put forward precautionary measures for bank slope instability

    摘要筆者通過調研究和綜合分析金沙江幹流水電工程區岸坡地質背景和巖體力學環境條件,定性分析與定量評價相結合,採用與三峽工程庫區岸坡失穩危險性評價相類比的方法,針對崩滑體失穩按總體積的1 / 8和1 / 11入江方量進行了計算和按美國土木工程學會涌浪圖解計演算法計算了入水點及在向家、溪洛渡和鄰近城鎮的涌浪高度,並圍繞大施工安全、庫區周邊城鎮安全,水庫運營安全等方面對岸坡失穩的危險性進行了評價預測,提出了岸坡失穩的防治對策。
  3. In this paper, based on the fact, according to the former scholars " survey to the geological general conditions in the daliushu dame site district, and applying model tests combined with numerical analysis, the stability of daliushu dame site is studied

    本文從實際出發,根據已有學者對大柳樹區地質概況的調資料,運用模型試驗結合數值分析的方法,對大柳樹的穩定性進行了研究。
分享友人