壩工分區填築 的英文怎麼說
中文拼音 [bàgōngfēnqūtián]
壩工分區填築
英文
zonal embankment- 壩 : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 分 : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
- 區 : 區名詞(姓氏) a surname
- 填 : 動詞1. (墊平或塞滿) fill; stuff 2. (補足; 充滿) replenish; supplement; complement 3. (填寫) fill in; write
- 築 : 築名詞(貴陽的別稱) another name for guiyang
-
It has accumulated much experience in the choice of earth rockfill dam ' s material, division of dam ' s body, stabilization of dam, seepage, settlement, analysis of stress and strain, treatment of foundation, criterion of reclamation and machine of construction and so on
在土石壩築壩材料,壩體分區,壩體穩定,滲流,沉降及應力應變分析,基礎處理,填築標準,施工機具等一系列關鍵技術上,已經積累了豐富的經驗。Abstract : in the filling construction of lianhua concrete face rockfill dam, we have paid attention to plan the material sources according to the actual conditions, such as, using the excavated materials in other structures in order to reduce the cost, adopting the measures of filling by zones to quicken the construction progress and solve the construction problems during the cold seasons, using the convenient transportation roads to the dam and good road surface quality to ensure the high intensity filling, and selecting the rational construction equipment to make full use of the all equipment
文摘:蓮花面板堆石壩填築施工中,注意對築壩料源做出符合工程實際情況的規劃:利用其他建築物的開挖料降低造價;採用分區填築的措施,加快施工進度和解決寒冷季節施工問題;方便的上壩交通道路網和良好的路面,為高強度填築提供有力保證;選擇合理配套的施工設備使設備得到優化利用。