壩決 的英文怎麼說

中文拼音 [jué]
壩決 英文
dam breaking
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • : Ⅰ動詞1 (作出主張; 決定) decide; determine 2 (執行死刑; 殺死) execute a person 3 (裂開; 斷開...
  1. The main sedimentary microfacies are submerged distributary channel, debouch bar, submerged natural levee and flood - plain splay. the research shows that the physical property of subermerged distributary channel sandbodies are the best and debouch bar comes second

    長4 + 52長62油層砂體的沉積微相類型主要有水下分流河道、河口、水下天然堤和水下口扇等,其中水下分流河道砂體的物性相對最好,其次為河口砂體。
  2. The dike burst.

  3. The studying on the mechanism of beiyin main channel gliding slope heilongjiang beiyin project lies in the west of heilongjiang which lies the center of nenjiang. geographical location is east longitude 124 - 126 ? and north latitude 46 - 48 ?. aims of the project are providing water to petrol and chemical industry of daqing and living water. at the same time it is also a big comprehensive conducting water project without dam which resolves 24 irrigation regions of beiyin using water along beiyin

    黑龍江省北部引嫩工程位於黑龍江省西部,地處嫩江中游左岸的松嫩平原腹地,地理位置在東經126度128度,北緯46度48度之間。該工程以滿足大慶石油和化工生活用水為主,同時解沿途24個分灌渠用水的綜合性大型無引水工程。
  4. From sedimentology symbol such as rock assembled, sediment gradus, sandstone grading analysis, protogene sedimentary structure, ichnofossile and logging facies etc and palaeoenvironment background, it is confirmed that shen84 - an12block s34 segment is braid river delta system, not fan delta system ( abrupt slope ). then it can be more partition as braid river delta plain sedimentary assembled, delta front sedimentary assembled and prodelta sedimentary assembled on core and log assembled. and delta plain sedimentary assembled can be identified four microfacies : braided distributary channel, crevasse splay, overbank deposits and interdistributary bay

    沉積微相研究是儲層非均質性研究的基礎,研究區有豐富的巖芯資料和測井資料,通過巖石組合、沉積韻律,砂巖粒度分析、沉積構造、古生物遺跡和測井相等沉積學標志,結合古環境背景,確定沈84 ?安12塊s _ 3 ~ 4段為辮狀河三角洲體系,而不是前人所認為的扇三角洲(陡坡型)體系,在巖芯和測井組合上可進一步劃分為辮狀河三角洲平原沉積組合、三角洲前緣沉積組合和前三角洲沉積組合,其中三角洲平原沉積組合又可識別出辮狀分流河道、口扇、分流河道邊部和分流間灣四種微相類型;三角洲前緣沉積組合識別出水下分流河道、水下分流河道邊部和分流河口三種微相。
  5. The rock types comprise the delta front subfacies subaqueous distributary channel, channel - mouth bar and distal bar microfacies, and delta plain subfacies subaerial distributary channel microfacies sandstones and siltstones. as for the reservoir quality, the subaqueous ( subaerial ) distributary microfacies channel sandstones are the first, the channel - mouth bar microfacies sandstones come second, the distal bar microfacies sandstones is the third, and the last one is the interdistributary bay microfacies sandstones. the intense compaction, pressure solution and late carbonate cementation are responsible for the reduction of the porosity and permeability of the reservoir rocks

    三角洲前緣水下分流河道、河口砂、遠砂及三角洲平原水上分流河道微相定了儲集巖的發育,分佈及原始物性條件;水下(上)分流河道微相砂體厚度大、物性和孔隙結構好,次之為河口砂微相砂體,遠砂微相砂體儲集性較差,而分流伺灣微相砂體物性和孔隙結構最差。
  6. Brief analysis of the danjiangkou reservoir bank caving of the middle - route water sources project of south - to - north water transfers

    南水北調中線一期工程丹江口大加高方案的論證與
  7. ( 6 ) the destroying of the barrier dam can result in the change of the lower environment. so protecting the upper environment is not only the necessity to the development itself, but the key to the lower environment

    ( 6 )堰塞體的潰引起岷江下游環境的變化,因此保護好岷江上游的生態環境不僅僅是上游本身發展的需要,也是岷江中下游環境好壞的關鍵。
  8. The characteristic of chemical grouting material should combind with construstion method directed by the theories, it is necessity guarantee for the good result in some special cases. by cw series material, various complicated engineerings have been successfully handled, such as the treatment of concrete fine cracks in three gorges project ( tgp ), foundation reinforcement to the fault in in three gorges project ( tgp ), and the seepage control and reinforcement for the dam base of jiangya hydropower - station. these illustrations are provided to proof the advantages of modified epoxy resin and its technique

    化灌材料特性與理論指導下的灌漿工藝的全面結合是化灌處理,特別是特殊條件下灌漿效果的必要保證, cw系改性環氧化灌漿材及技術對多種復雜工況工程處理對象成功處理,解了三峽混凝土微細滲水裂縫防滲補強、三峽工程地質斷層泥化夾層加固以及江埡電站基溶蝕帶防滲等一系列工程技術難題,印證了該材料及技術的先進性。
  9. According to the abundance well logging, mud logging and core analysis data, gaotaizi reservoir has been classified into four sand group with the principle of cycle comparison and classified control. based on the detailed study of lithologic character, sedimentary structure, paleontologic fossils, depositional sequence, rock association and logging data, the microfacies of the studied area are divided into such seven types : subaqueous distributary channel microfacies ; river mouth bar microfacies ; subaqueous interdistributary channel microfacies ; subaqueous crevasse channel microfacies ; subaqueous natural barrier microfacies ; distal bar microfacies ; delta front sheet sand microfacies. the characteristic of each sedimentary microfacies are described detailedly

    通過研究大量測井、錄井資料和巖芯資料,依據「旋迴對比,分級控制」的原則,把研究區高臺子油層劃分為g 、 g 、 g 、 g四個砂層組。通過對研究區巖性、沉積構造、古生物、沉積序列、巖石組合及測井曲線特徵進行研究的基礎上,認為研究區高臺子油層屬於三角洲前緣亞相沉積,並將研究區沉積微相劃分為:水下分流河道、河口、水下分流河道間、水下口扇、水下天然堤、遠砂、席狀砂等七種微相類型。
  10. And the delta genetic unit includes distributary channel, distributary bay, small lake of delta plain, swamp, distributary estuary bar, frontal delta mud and sandy density flow and so on. the fluvial system is composed of channel, channel side and flooding basin

    其成因相包括分流河道、口扇及口河道、分流間灣、三角洲平原小型湖、沼澤、分流河口、前三角洲泥及砂質重力流等;該區河流體系由河道、河道邊部及泛濫盆地等沉積組合構成。
  11. According to observing the core and well logging facies analysis, yanchang 4 + 5 sector to yangchang 3 mainly developed underwater distributary channel, river mouth bars, underwater natural levee, underwater crevasse splay, interdistributary bay, far bars, etc. and some shallow lake subfacies

    根據巖芯觀察以及測井相分析,認為長4 + 5 ?長3期以水下分流河道、河口砂、水下天然堤、水下口扇、分流間灣和遠砂等沉積微相以及部分淺湖亞相沉積為主。
  12. For example the concrete faced rock - fill dam in frigid zone is distinctive in terms of frost resistance and durability, cushion material seepage prevention and frost heave, adaptability of darn filling with season coordination among construction diversion, flood discharge and the whole construction schedule etc. lianhua construction which is situated in mudanjiang basin of heilongjiang province firstly creates the successful record of construction of large - size faced rock - fill dam in frigid zone, a series of internal and external problems not having a precedent to go by have been solved

    如在面板的抗凍耐久性、墊層材料防滲和凍脹特性、體填築與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區混凝土面板堆石均有其獨特之處。蓮花工程位於黑龍江省牡丹江流域,首創了高寒地區修建大型面板堆石的成功記錄,解了一系列國內外均無先例的難題。
  13. With the further economic growth and the implement of development of the western regions, hydroelectric construction in our country is undergoing rapid growth, anumber of high - dam power - station is in building or in programming. in view of its higher - head and larger magnitude of spill structure outlet, it is difficult for conventional concrete or reinforced concrete structure of pier and pier room to support its vast water pressure. coupled with the improvement of prestressed method, it has been the noteworthy tool in solving the problem

    隨著我國經濟的加速發展及西部大開發戰略的實施,我國水電事業也迎來了迅猛發展的大好時機,一批高水電站正在建設或規劃之中,其泄水建築物孔口及水頭愈來愈大,常規混凝土或鋼筋混凝土閘室閘墩結構難以承受如此之大的水推力作用,隨著預應力技術的成熟,這一技術已成為解該問題的關鍵技術措施之一。
  14. We decided to dam the river

    我們定築一道攔河
  15. The author introduces briefly latex barrage control system and application of composite softwarein the system. corresponding solution has been put forward for the problems in programming systematic software

    簡要介紹了橡膠攔河控制系統及組態軟體在該控制系統中的應用,並結合在系統軟體編制過程中所出現的問題給出了解的方法。
  16. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #段溫控並縫措施研究:為廠房段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱基(肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程體的靜動力安全穩定性及溫控方案提供依據。
  17. The dam burst.

  18. The flood resulting from a dam breaking, and opening by break very spillway, and in order to guarantee safe enlarging the outflow of reservoir, spreads quickly and often causes catastrophes

    造成的洪水、以破壞方式開啟非常溢洪道造成的洪水以及為保證大安全加大水庫放流形成的洪水,傳播速度快,破壞性巨大。
  19. Taking the decision of nujiang dam as an example, this article describes general characters of public participation in the decision - making process of the local government and analyzes interest conflicts, self - interest fondness which expresses and restrains policy - makers, decision - making procedures and unspoken rules, etc

    有鑒於此,需要以怒江大壩決策為例,描述地方政府策過程中公眾參與的一般特徵,並對這一過程涉及的利益沖突與表達、抑制策者的自利偏好、策程序以及潛規則等問題加以分析。
  20. The village was swept away when the dam burst

    村莊在水壩決堤時被沖走了。
分享友人