壩肩 的英文怎麼說

中文拼音 [jiān]
壩肩 英文
rock dam abutment
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • : Ⅰ名詞1. (肩膀) shoulder 2. (姓氏) a surname Ⅱ動詞(負擔) take on; undertake; shoulder; bear
  1. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝河段,型為305米高雙曲拱,正常蓄水位標高1880米。址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此基的防滲成為重要問題。
  2. For jiangpinghe double - curved arch dam, 3 - d elasto - plastic fem is made, in which the point safety factors of the dam - abutments system and the safety margin for coefficients of sliding resistance on 7 potential sliding blocks of the dam before and after the reinforcement of the dam are calculated under the conditions of the normal storage level and the design flood level respectively based on the results from the analysis made with fem

    摘要對江坪河雙曲拱進行了三維彈塑性有限元分析,利用有限元應力成果分別計算了正常蓄水位、設計洪水位等3種工況下加固前後壩肩系統的點安全系數和7個可能滑動塊體的抗滑富餘系數。
  3. But at the present, because of chronic geomorphy disintegration, altitude and ascent of bank slope have been built down and palliated. especial rock mass mechanics condition has not been existent, so all kinds of rock mass fracturing deformation was stopped to developing and steady

    但目前因長期的地貌剝蝕作用,壩肩岸坡的高度及坡度均已大為降低減緩,特殊的巖體力學條件已不復存在,巖體內部的各類張裂變形亦停止發展,處于破裂發展穩定階段。
  4. By contrast, the paper calculated the reliability index of the abutment after changing variable quotiety of the stochastic variable

    作為對比,本文還在改變各隨機變量變異系數的前提下,計算了壩肩巖體各高程的可靠指標。
  5. ( 3 ) ensemble character of structural planes as follows : in left dam abutment, meta basalt schistosity is main, and the structure is clockwise. low dip angle jointing did n ' t develop in rock mass ; in right dam abutment, rupture and jointing structural plane is main, and the structure is reversed. the structure was of obvious macroscopical slaty character

    ( 3 )通過對上述結構面的分析,得出其總體特徵為:左壩肩以變玄武巖片理為主體,呈順向結構,巖體內緩傾角節理極不發育;右壩肩主要為斷裂及節理型結構面,呈反向結構,且具有明顯的宏觀板狀結構特徵,並發育有一定厚度的構造軟巖帶。
  6. Past investigation found the rock in the right dam foundation composing of granite ( _ 4 ~ 3 _ 5 ~ 1 ) in dyas - trias, which has a very complicated mechanical environment. the complicated phenomenon is as follows : tectonism, alteration, rock mass demobilize, rock mass stress release and other factors. because of this several weakness rock zones and a loosen rock mass zone are develop in the right dam foundation

    前期的調查表明其右岸巖體力學環境復雜,表現為:構成右岸基()巖體主體的二迭三迭紀花崗巖( _ 4 ~ 3 _ 5 ~ 1 )受構造變動、蝕變、風化卸荷等因素的影響形成了基軟弱巖帶和壩肩上部卸荷鬆弛巖體。
  7. In the paper, based on random block theory, a mathematical model is developed for reliability analysis of 3 - dimensional abutment stability against sliding. calculative formulas of reliability analysis are given

    本文以隨機塊體理論為基礎,建立了拱壩肩三維可靠度分析的計算模型,推導了分析其可靠度的基本公式。
  8. Give an example, for a built arch dam, the paper worked out calculational programme based on the calculational model and calculate the reliability index of abutment with simple and double quadrature method

    對於一已建成的拱,利用這一計算模型,採用改進一次二階矩法,編制電算程序,計算該拱壩肩巖體的可靠指標。
  9. In this paper, mainly based on arranging data with well pumping tests in dam foundation and sum up the laws of flows under the condition of deep well pumping, the useful dewatering calculation model and parameters were set up. secondly, based on the well constructing technique which was discovered under the condition of in - situ bumping test and calculating the dewatering scheme of the two dewatering units with the calculation model, the final dewatering scheme was put forward. at last, the final dewatering scheme was appraised by observation during the construction, and it satisfied with the construction request

    本文主要通過基現場抽水試驗試驗資料整理,在揭示黃土基降水特性規律的基礎上,確定可以反映現場抽水條件的的實用降水計算模型和參數;再根據現場抽水條件試驗開發的成井技術和計算模型計算基和壩肩兩個水文地質單元的降水井方案,並按工程類比法確定最終的降水方案;最後,通過施工過程中的觀測情況對降水方案進行評價,降水方案能夠很好地滿足施工的要求。
  10. The research fruits in this article can provide the temperature isoline map of crown cantilever section and central longitudinal section of the dam, the stress isoline map of crown cantilever section and upstream and downstream surfaces of the dam, the maximal and minimal stress distribution map in dam abutment along with the height of dam, the maximal and minimal stress table of typical nodes and the maximal and minimal stress table in different elevations, and also provide reference basis for taking relative temperature control measures in the design and construction of rcc arch dam

    本文研究成果可給出體的拱冠梁剖面和體中心縱剖面的溫度等值線圖、拱冠梁剖面和體上下游面應力等值線圖、壩肩最大最小應力沿高的分佈曲線、不同高程處典型點的最大最小應力值表以及不同高程處最大最小應力值表等成果,為碾壓混凝土拱的設計和施工中採取相應的溫控措施提供了參考依據。
  11. Analysis of dam abutment stability of tianfumiao reservoir and reinforcement design

    天福廟水庫壩肩穩定分析及加固設計
  12. The evaluation on stability of seepage flow of the right dam abutment in laohe reservoir

    澇河水庫右壩肩滲流穩定性評價
  13. Analysis on the reliability of the arch dam abutment stability based on stochastic finite element

    基於隨機有限元的拱壩肩穩定可靠度分析
  14. ( 4 ) rock mass of dam abutment had very complicated distortion in right bank of xia luo - yu damsite

    ( 4 )下落魚址右岸壩肩巖體具有極為復雜的變形問題。
  15. It is pointed out that the stability of the dam abutment is a key factor affecting the safety of concrete arch dams

    摘要指出可能影響混凝土拱安全的關鍵點為拱壩肩的穩定。
  16. Meanwhile, the ansys software of fem is applied for numerical analysis to rock mass deformation process on dam abutment

    同時,採用ansys有限元分析軟體對壩肩巖體變形過程進行了數值模擬分析。
  17. The engineering reaction analysis is divided stability analysis of high rock slope and deformation and skidresistance of rock mass on dam abutment

    工程效應分析分成高邊坡穩定性分析和壩肩變形及抗滑穩定性分析。
  18. Therefore, the deformation mode of compound deformation rock mass on right dam abutment first is analysed before the engineering reaction is studied

    因此,在進行工程效應研究之前,首先進行了右壩肩復雜變形巖體的變形模式研究。
  19. Hereby, at the beginning of geology research and theory analysis, the control effect of rock mass structure to rock mass shape distortion and failure of dam abutment has been threw light on

    據此,從地質研究和理論分析著手,闡明了巖體結構對壩肩巖體變形破壞的控制效應。
  20. Because of limit that invisibility and discommodious in anciently program, based on the method of limited rigid body equilibrium, using visual program language vb and connect autocad, realize plane and solid programme of abutment analysis of arch dam, provide alternation interface for designer. presently, our country constructing and will construct high 300m arch dam, it is important to judge security based on nonlinear fem analysis. basic theory of nonlinear fem analysis and its realization in ansys were studied

    針對傳統程序的存在問題,非直觀、不易操作特點,以剛體極限平衡法為基本分析方法, visualbasic作為操作平臺,結合autocad圖形軟體,完成了剛體極限平衡法二維、三維壩肩穩定分析程序設計,使之具有直觀性,可視性、易操作性,為設計人員提供了具有友好界面的工程使用軟體目前我國西部在建和將建一批300m級的高拱,運用有限元方法計分析拱穩定性、評判大安全度十分有必要。
分享友人