壩頂高程 的英文怎麼說

中文拼音 [dǐnggāochéng]
壩頂高程 英文
crest elevation
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 壩頂 : crest of dam
  1. Based on the simulation model theory of temperature and stress fields presented in this article, a large simulating program for high rccd has been developed, which can numerically simulate all kinds of temperature control measures, including water pipe cooling, heat insulating in winter, reducing place temperature of concrete, spraying water brume, and long interval over - watering surfaces overflowing in flood season.

    基於本文提出的溫度場和徐變應力場模擬模型理論,編制了碾壓混凝土的三維有限元模擬計算序,在序中考慮了各種溫控措施的數值模擬,包括:水管冷卻、冬季保溫、降低混凝土的澆築溫度、夏季混凝土表面噴水霧、施工汛期面過水等。
  2. The dam of mania hydroelectric project is a soil - rock dam with spreading gradation soil of core wall. the height of the dam apices is 4261. 3m and the maximal height is 76

    滿拉水利樞紐工攔河為寬級配礫質土心墻土石壩頂高程4261 . 3m ,最大76 . 3m 。
  3. Three - gorges ship lift structure is one of important navigation facilities in the three - gorges projects. as far as its scale for navigation, its lifted weight and height are concerned, the ship lift structure is the greatest one in the world. in this paper taking the ship lift structure as background, the principle of mr adaptive reduced vibration control system is proposed to solve the problem of seismic whipping effect of the top machinery building of ship lift structure

    三峽大升船機是三峽水利樞紐工中重要的通航設施之一。就其通航規模、提升重量及度而言,均屬國內外已建、在建升船機之首位。本文以該大型升船機為工背景,對升船機部廠房地震鞭梢效應問題提出了磁流變智能自適應減震控制的原理、設計方法和效果分析。
  4. In this thesis, first, reasons and factors for the stability of loose rock dams were summarized according to the field surveys and certain expert ' s experiences. then, researches on block stability problems were reviewed, and according to the relationship between grain size and incipient velocity, it is found that the block weight is in direct proportion to 6 - 9 power of incipient velocity, and 50 % increase of the velocity will result in about 40 times change of the block weight. after that, experiments were conducted in a flume, focusing on the relationship between incipient velocity and some main factors including block weight, water depth over the dam, cross - section size, block material and river bed material

    本文首先根據散拋石損毀情況的現場調查資料,結合有關專家多年的整治經驗,總結出體的損毀原因及影響因素;對現有塊體穩定性的研究成果進行回顧和總結,並針對散拋石的直接損毀現象,結合山區河流的水流、地形特點,利用塊體粒徑與起動流速的關系,提出塊體穩定重量與起動流速次方成正比的概念,流速50的增長可能導致塊體穩定重量接近40倍的變化;通過二維變坡水槽試驗,研究了體穩定的主要影響因素,包括塊體重量、水深、斷面尺寸、塊體材料(塊石和卵石兩種) 、護底等,結果表明對于山區河流,試圖僅僅通過增加體單個塊體重量或斷面尺寸來提體穩定性效果甚微;最後,根據西部地區的自然、經濟、交通等條件,提出可以採用柔性混凝土鉸鏈體等一類整體性較好的護面層作為散拋石的防沖毀措施,以期取得良好的工效果。
  5. This manner of change reflected the great influence of texture to rock mass quality. rock mass mechanical parameters corresponding to individual rock mass quality at different levels are determined by means of correlation analysis and statistical analysis. results show that calculation outcomes match well with measured mechanical parameters

    研究結果表明:對于混凝土重力,按照現在的深開挖方案,肩開挖后,土石方開挖量達820x10 『 m 『 ,且在72dri至坡將產生大范圍的破壞區,採用工治理將帶來巨額的費用。
  6. ( 2 ) validate whether the crest elevation can meet the require of energy dissipation and erosion prevention during the beginning period of flood discharge. ( 3 ) calculate the altitude of downriver cofferdam, and make it meet the require of energy dissipation and erosion prevention. ( 4 ) calculate some average velocity of flow through some sections, including contracted section in stilling basins behind upriver cofferdam, if the hydraulic jump happen in lower reaches of the river. the program will calculate the average velocity of flow of contracted section and the length of the apron

    主要設計內容包括:計算上游圍堰后消力池的尺寸;驗證泄洪初期是否能夠滿足消能防沖需要;計算下游圍堰堰,使其滿足泄洪期圍堰和體過流的消能防沖和工進度的需要;計算部分斷面平均流速,包括:上游圍堰后消力池中收縮斷面的斷面平均流速;首和末的斷面平均流速;當下遊河道發生水躍時,計算下遊河道的收縮斷面平均流速及需要鋪設護坦的長度。
  7. In this paper a date from some real projects are used to analyse the facors that will affect the energy dissipation and erosion prevention. such as flood discharge across the cofferdam, crest elevation, downriver cofferdam, roughness coefficient and the gradient of the surface of dam, and so on. in this paper, the program based on hydraulics is checkout by the tankeng waterpower project in zhejiang. the results prove that this program can be used to design any project where there is no obvious side shrinking phenomena

    本文結合工實際對影響圍堰和體消能防沖的各種因素,包括過堰流量、、下游圍堰堰面糙率、面坡度等進行了分析,並藉助水力學知識和計算機語言編寫了圍堰和體的優化計算序,並利用浙江灘坑水電站工對所提出優化計算序進行了驗證,證明了該序在沒有明顯的側收縮的影響下,計算結果與實際情況較為吻合。
  8. Abstract : the articles introduce the method of china and germany ; according to their conditions of natural geography environment and technique etc, to determine crest the elevation of earth dam

    摘要:文章介紹我國及德國根據自然環境、技術條件採用的確定土壩頂高程的方法。
  9. After the engineering slope was dug, several small plastic zone the designed rock - fill dam will coming in the temporary slope, because rock - fill dam change the stress field on a small degree. but a gravity dam will arouse a great area of plastic zone in the permanent slope, which will bring a stability problem. after detail and depth study, the rock - fill dam project is more compatible of the engineering geology condition in nuozadu hydraulic - power station ' s dam site

    邊坡開挖后,擬定的堆石方案由於嵌入淺,應力的調整有限,塑性區主要分佈在壩頂高程附近的較小范圍內;而擬定的重力方案,由於嵌入深,引起了一定度的應力調整,邊坡巖體表層產生了鬆弛變形,塑性區主要分佈在壩頂高程到坡前緣(永久邊坡)的v ivb類巖體分佈區。
分享友人