寬縫重力壩 的英文怎麼說

中文拼音 [kuānféngzhòng]
寬縫重力壩 英文
slotted gravity dam
  • : 縫名詞1. (接合處) seam 2. (縫隙) crack; crevice; fissure; slit
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • 重力 : [力學] gravity; force of gravity; gravity force; power of gravity; pull of gravity; gravitational...
  1. No. 15 fault of yunfeng dam is a low angle one. its space structure is very complex. had not been disposed thoroughly during the period of construction, it has become the control factor in yunfeng hydroelectric project

    雲峰寬縫重力壩右f _ ( 15 )斷層為一個順河向、緩傾角大斷層,空間結構非常復雜,是影響大安全運行的控制因素。
  2. As a project financed by yunfeng and ming tomb hydroelectric power station, the study on " mathematical model for dam safety monitoring and dynamic inverse model for underground power house " was conducted. according to the data observed in - situ, the under - fitting problems in regression models for dam safety monitoring were discussed, and the computational parameters and boundary conditions of underground structures were determined on the base of dynamic inverse mathematical model

    本文利用大運行監測資料和水電站廠房結構的振動測試數據,對水工建築物的正反分析模型中的相關問題進行了探討,分析了大安全監測回歸模型存在的欠擬合現象,建立了通用的結構動最優化反分析模型,實現用戶優化演算法對復雜結構的直接調用和優化計算,在計算模型方法的基礎上對雲峰寬縫重力壩的安全狀況和十三陵抽水蓄能電站的動反演問題進行實例分析。
分享友人