尾水壩 的英文怎麼說

中文拼音 [wěishuǐ]
尾水壩 英文
tailrace dam
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • 水壩 : dam; pen
  1. The thesis built the relation between containing water and the properties of trail dam ' s soil by geomechanical properties of trail dam ' s soil ; analysed the seep rule of water in the trail dam ' s field and the change of soakage line. the thesis applied the limited element to analyze the trail dam of baogang by the engineering item in production. it calculates the dynamic and static response about the dam using the numerical simulation method

    本文通過大量的礦土物理力學性質試驗資料,建立了含量與礦土性質之間關系曲線;分析了區的滲流規律和不同標高時浸潤線的變化情況,為分析的穩定性提供依據;結合生產上的工程項目,從包鋼的穩定性研究入手,應用有限元法,通過數值模擬分析了的靜力、動力穩定性影響。
  2. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田礦庫區域地質構造、庫區不良地質觀察、礦淋濾固結和化學固結、體滲透和庫區特大洪等因素對馬家田礦堆積體穩定性影響的分析,初步論證了礦砂土的地震液化、滲透破壞、肩滑坡使體失穩和洪漫頂的可能性,以及礦淋濾固結和化學固結作用有助於體的穩定性。
  3. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam body ' s tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田礦庫區域地質構造、庫區不良地質觀察、礦淋濾固結和化學固結、體滲透和庫區特大洪等因素對馬家田礦堆積體穩定性影響的分析,初步論證了礦砂土的地震液化、滲透破壞、肩滑坡使體失穩和洪漫頂的可能性,以及礦淋濾固結和化學固結作用有助於體的穩定性。
  4. In this paper according to the design scheme of yao heba power station in nan yahe river, the mathematical model with longer and complicated conduit system, elastic water hammer and pid regulating low of voter turbine adjusting system in the case of the small fluctuation has being built, which include conduit system, surge tank, draft tube, water turbine, generator and governor. the hydraulic losses are taken into account, and nonlinearization in water turbine and the governor is also taken into account

    本文根據南椏河姚河電站的設計方案,對輪機調節系統,按長引管道復雜引系統、彈性擊、調速器為pid調節規律,在小波動情況下,對包括引道、調壓井、管、輪機、發電機、調速器在內的輪機調節系統建立數學模型,並計及引管道力摩阻損失,對輪機、調速器考慮了其中的非線性,利用功能強大的matlab軟體編制了源程序進行計算機模擬計算。
  5. Based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    結合魚劍口電站下消能防沖試驗研究成果,對低樞紐寬墩的流特點、摻氣特性、寬墩對大泄流能力和面壓力的影響以及寬墩的消能效果等問題進行了初步探討,提出了合理地使用寬墩結合輔助消能設施可有效地解決下覆蓋層深,地質條件差,抗沖能力弱的低樞紐的消能防沖問題,從而為具有低頭,大單寬流量,低佛氏數特點的低樞紐泄洪消能開辟了一條新途徑,可供有關低樞紐設計與試驗工作者借鑒與參考
  6. Seepage field, seepage deformation and seepage control measures of hydraulic engineering, ground water resources, and irrigation and drainage

    工建築物、及灰的滲流場、滲透變形和滲控措施,地下資源開發評估,農田利,堤安全監測。
  7. All kinds of special pipes and conduits ( ditches ), ash storage sites, wells, pumping stations, water cooling towers, oil depots, dikes and dams, railways, roads, bridges, docks, fuel loading and unloading equipment, lightening arresters, fire - fighting equipment and other related ancillary equipment outside power plants and power transformation stations

    (三) 、力發電廠使用的庫、大、取口、引隧洞(含支洞口) 、引渠道、調壓井(塔) 、露天高壓管道、廠房、渠、廠房與大間的通訊設施及附屬設施。
  8. Reservoirs, dams, water inlet, water diversion tunnels ( including branch tunnels, water diversion canals, voltage adjustment wells ( towers ), open - air high - voltage conduits, premises, water discharge canals, communications facilities between premises and dams and other related ancillary equipment used by hydropower stations

    (三) 、力發電廠使用的庫、大、取口、引隧洞(含支洞口) 、引渠道、調壓井(塔) 、露天高壓管道、廠房、渠、廠房與大間的通訊設施及附屬設施。
  9. By analyzing and studying yujiaquan tail dam of luzhong mining group example, the failure, groundwater seepage arid dust nuisance of tail dam are studied

    摘要通過分析研究魯中冶金礦業集團的御駕泉礦序實例,對的破壞,礦庫地下滲漏和細粗礦庫揚塵三個方面進行了研究。
  10. Nuozadu hydro - electrical power station, which is 261. 5 m dam height and 5, 850 mw installed capacity, is planned to build on the middle - lower reaches of lancang river near shimao city, yunnan province. it is planned to adopt rockfill dam and underground powerhouses in the left bank. the underground cavities mainly include three large cavities

    瀾滄江糯扎渡電站擬建高261 . 5m ,裝機容量5850mw ,採用左岸地下發電系統,由主廠房、主變室、調壓室以及洞等構成龐大而復雜的地下洞室群。
  11. So the research of its stability is significant

    所以研究的穩定性影響有重要意義。
  12. Abstract : based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    文摘:結合魚劍口電站下消能防沖試驗研究成果,對低樞紐寬墩的流特點、摻氣特性、寬墩對大泄流能力和面壓力的影響以及寬墩的消能效果等問題進行了初步探討,提出了合理地使用寬墩結合輔助消能設施可有效地解決下覆蓋層深,地質條件差,抗沖能力弱的低樞紐的消能防沖問題,從而為具有低頭,大單寬流量,低佛氏數特點的低樞紐泄洪消能開辟了一條新途徑,可供有關低樞紐設計與試驗工作者借鑒與參考
  13. The bingling ( si gou xia ) hydropower station is a series of power stations on the yellow river, in order to the expropriation and the emigration be reduced, after studied the relation of water level and flux of the bingling hydropower station on the taping dam location, under the different running circumstances of the liujiaxia reservoir, to located the bingling hydropower station on the head of the liujiaxia reservoir, and keeping the total installation and the generated energy not be changed all made use of the floodwater of the liujiaxia reservoir

    摘要黃河炳靈(寺溝峽)電站是黃河幹流上的一個梯級電站,為了減少征地移民損失,經對炳靈電站(塔坪址)斷面在劉家峽庫不同運行方式下的位與流量關系進行分析研究,在總裝機和年發電量基本不變的情況下,充分利用劉家峽庫汛限位,將電站樞紐選址在其電站庫內。
分享友人