峰值周期 的英文怎麼說

中文拼音 [fēngzhízhōu]
峰值周期 英文
peak period
  • : Ⅰ名詞1. (山的突出的尖頂) peak; summit 2. (形狀像山峰的事物) peak-like thing Ⅱ量詞(用於駱駝)
  • : Ⅰ名詞1 (圈子; 周圍) circumference; periphery; circuit 2 (星期) week 3 [電學] (周波的簡稱) c...
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  1. Due to existing signal processing technology ’ s shortage such aslow measurement, narrow measurement range precision and other poor performance, we introduced a high - precise signal processing technology : firstly, to get power spectrum with hanning windowed welch modified periodogram, search its peak value frequency ; secondly, to apply zooming analysis via goertzel algorithm ; at last, to get a highly precise doppler frequency with energy centrobaric rectifying algorithm 。 the simulating result indicated that this technology introduced could get accurate doppler frequency 。 depending on above discussed technology, we designed a signal processing scheme, and developed a signal processing system. the running result showed high performance, verified the feasibility and reliability of the highly precise signal processing technology introduced. in a word, the technology improved ldv ’ s performance such as measurement precision, measurement range, dynamic response time 。 and it will have a wide application foreground

    針對存在的缺點,本文提出了一種應用於激光多普勒測速的高精度信號處理技術,即首先利用加hanning窗的welch修正圖演算法得到信號功率譜,搜索其譜頻率,接著利用goertzel頻譜細化演算法對搜索的譜進行細化分析,再引入能量重心頻譜校正演算法對細化后的譜進行校正分析,從而將離散頻譜分析演算法、頻譜細化演算法和頻譜校正演算法三者有機結合起來,充分發揮各自的優點:通過加hanning窗的welch修正圖演算法快速得到功率譜及頻率,通過goertzel演算法獲得分析頻帶的高解析度頻譜,然後通過能量重心校正演算法對細化后的頻譜進行高精度校正,這樣不僅保證了演算法的高效性,而且大大提高了分析的精度。
  2. The last time the solar cycle peaked was in 2001

    上一個太陽活動發生在2001年。
  3. During the female menstrual cycle, lh lute tropic hormone in her urine shows peak value at about 24 hours before ovulation

    在女性的月經中,尿液中的促黃體生成激素lh會在排卵前24小時左右出現高
  4. The incident wave height h1 / 3 is in the range from 0. 1m to 0. 25m, and the peak period tp in the range from 1. 0s to 2. 0s. the ratio of s / h1 / 3, which refers to the subface level of wharf deck ( s ) to the incident wave height ( h1 / 3 ), is between - 0. 1 and 0. 7. three different shore connecting types : open - piled, permeable slope with armored 1ayer of dolosse b locks and impermeable slope with armored layer of concrete plate, are set in the experiment for the research on the effects of boundary condition with different shore connecting types on the wave impact

    本文的物理模型試驗在大連理工大學海岸和近海工程國家重點實驗室的大波流水槽中進行,試驗中選用的隨機波靶譜為改進的jonswap譜,入射波波高h _ ( 1 / 3 )范圍為0 . 1m 0 . 25m ,譜t _ p范圍為1 . 0s 2 . 0s ,碼頭面板的相對凈空(碼頭面板底面距離靜水面的距離s與入射波波高h _ ( 1 / 3 )的比)范圍為- 0 . 1 0 . 7 ,其中s / h _ ( 1 / 3 )為負時表示碼頭面板底面位於靜水面以下。
  5. On the basis of theoretic analysis and numeric calculation, the author verifies that only is the ratio of the fundamental period of the structure to the disturbance period beyond 1. 4, it ' s possible to achieve reductions in both the relative displacement and the absolute acceleration responses

    作者在此基礎上,從理論分析和數計算兩方面證明了粘性變阻尼控制僅在結構與激勵主的比大於1 4時才有可能同時減小結構的位移反應和加速度反應
  6. The paper ’ s main works are as follow : ( 1 ) several methods of getting pitch period are researched in details. according to the real - time demand for the systems, the methods for pitch searching are simplified as follow : after searching the peak value point every third point within pitch range, search the peak value point every point near the current peak value point

    ( 1 )研究了基音的求取方法,並根據系統的實時要求,將逐點搜索基音的方法簡化為粗細法,即在基音范圍內隔點搜索相關函數最大點,然後在此時得到的最大點附近繼續搜索,將最後得到的點作為基音
  7. After analyzed the basic principle of optimized noise reduction on tyre pattern, summarized three approaches to noise reduction. the first is trying to reduce size of single block or socket to reduce noise amplitude on time domain, the second is to adjust stripes sorting order and their interlace value to avoid noise - made by every single block - peak values on time domain overlayed and the last is to adjust ratio of blocks and sockets, ratio of stripe interval and stripe sorting order to avoid noise periodical distribution and abnormal high peak values in some frequency strip

    論文第四章分析了輪胎花紋優化降噪的基本原理,總結出三條降噪途徑:在允許范圍內盡量減小單個塊或槽的大小、刻刀槽軟化花紋塊來減小噪聲時域波幅度;調整節距排列順序、花紋條之間的錯位,使各發聲單元發出的聲壓時域波形的同向錯開,避免同向疊加;調整花紋塊和槽比例、節距比例、節距排列順序,盡量避免性分佈,使輪胎所發出的噪聲趨于白噪化,避免某些頻段的異常高
  8. Traditional approaches to compute resource management, especially during peak periods, drives tco up

    傳統的管理計算資源的方法(尤其是在峰值周期間的管理方法)會使tco增加。
  9. Using the variational method, analytical conditions for stationary pulse propagation in dense period fibers with strong dispersion management are deduced. the expression of initial soliton peak power is given. by employing the obtained formulas, the soliton evolution semi - analytically in various dispersion maps can be investigated. effects of the third order dispersion are also studied in this paper. the results show that imperfect dispersion slope compensation can cause pulse central position shift and even serious degradation of soliton shape

    利用變分方法,推導出了在強色散管理的密集光纖中脈沖穩態傳輸的解析條件,並給出了初始脈沖功率的表達式.運用這些公式,對各種色散管理系統中孤子的演化進行了半解析的考察.三階色散也被考慮在內.結果表明:不完善的色散斜率補償將導致脈沖中心位置的偏移甚至嚴重的孤子形狀劣化
  10. In addition, effects of several factors such as local site conditions, focal mechanism, epicentral distance and seismic magnitude on these parameters are discussed, and several significative results and conclusions are obtained. in all records there are about 1 / 3 vertical ground motion ’ s peak acceleration bigger than 2 / 3 of the corresponding horizontal one, so the action of vertical ground motion should not to be underestimated. vertical design response spectrum equals that the horizontal design response spectra times 65 % is probably unsafe when period is short, and suggest adopting different coefficients when at different periods

    本文基於對大量歐洲強震記錄的研究,分析了地震動豎向與水平向分量在加速度、反應譜、頻譜等參數方面的差異,以及這些參數與場地、震源機制、震級和震中距的關系,得到了以下有意義的結果和結論:在本文分析的地震記錄中大約1 / 3的記錄加速度比大於2 / 3 ,豎向地震動分量的作用不可低估;在短,豎向地震動影響系數的最大僅取為水平向地震動影響系數最大的65 %是偏於不安全的,可以考慮按分段採用不同的折減系數;我國現行抗震規范中設計反應譜特徵的取偏低,可能是偏於不安全的;豎向與水平向地震動分量卓越的比在0 . 7 - 0 . 9之間,豎向設計反應譜的特徵應有單獨規定。
  11. Figure 6 : solid lines depict the natural peaks and valleys in effort for one role - in this case, the coding team - in the product s lifecycle

    圖6 :實線描述了一個角色工作中的自然高和谷。在這個範例中,是程式設計團隊在產品生命中的情況。
  12. As the ratio of peak samples to total training samples is low, the prediction accuracy of peak load is poor when applying support vector machine ( svm ) model to predict a periodical load

    在應用svm模型于具有性負荷的預測時,由於在訓練樣本中或谷樣本所佔比例很少,從而導致荷載預測精度不高。
  13. New users bring their own kinds of demands, existing users change their focus and often the depth of their studies, the business cycle presents its own kinds of peaks and valleys, and in most cases the data warehouse expands as it stores data to cover longer periods of time

    新的用戶帶來了他們自己的需求類型,現有的用戶修改他們的焦點,並且常常改變其研究深度,業務呈現其自己的和谷類型,在大多數情況下,數據倉庫隨著它存儲數據跨越更長時而進行擴展。
  14. The cycle will also begin a year later than expected, in late 2007 or early 2008, and peak around 2012, said mausumi dikpati of the national center for atmospheric research in boulder, colo

    美國國家大氣研究中心的迪科帕蒂說,下一個開始的時間也要比原來預計的晚1年時間,將於2007年末至2006年初開始,最高將出現在2012年左右。
  15. Oer three menstrual cycles, the incidence of migraine peaked on the first full day of bleeding and on the preceding day, which correlated with a drop in estrogen leels

    三個月經中,偏頭痛的發生率在第一個月經出血日和月經前一日達到,同雌激素水平相關。
  16. The meaning of cqc ( t ) algorithm is the difference in time domain between the peak value location in time axis of input earthquake and model response of structure, which is called delay time. through the delay time calculating of a series of oscillators with different damp ratio and natural vibration frequency, it is found that it will bring biggish error if the cqc algorithm applied on the structure which has long period, and the time dependent cqc ( t ) algorithm could solve the problem easily

    Cqc ( t )方法的意義在於輸入地震動與結構模態響應在時間軸上的時間差,我們稱之為延遲時間,通過計算具有不同和阻尼比結構的延遲時間,發現對于自振比較長的結構, cqc方法會帶來比較大的誤差,而基於時程的cqc ( t )方法能夠解決這個問題。
  17. Measurements include frequency, frequency ratio with optional channel 2, period and peak voltage

    量測包括頻率頻率比使用第2個頻道選項電壓。
  18. At first, the development and fundamental of monolithic switching power supply are presented in this thesis. then a novel monolithic switching power supply circuit only with four terminals is analyzed at detail. it uses pulse skip modulation and current - mode topology

    論文研究了一種作為psoc原型電路的四端單片開關電源電路,此電路採用新型的跨調制模式,與傳統的脈寬調制模式相比,提高了輕負載下的工作效率;整體控制迴路採用電流控制模式。
  19. The calculating results show : ( 1 ) most of samples are located in 5 kpc - 10 kpc from galactic center. all of the sample clusters present a spherical symmetrical distribution around the galactic center, and their space velocities are presented a ellipsoidal distribution ; ( 2 ) according to the metallicity and basic characters, the sample clusters are separated into hb subgroup and mp subgroup. the number of samples are changed with metallicity [ fe / h ], and there is a peak at [ fe / h ] = - 1. 6 ; ( 3 ) the orbits of sample clusters show mostly limited, periodic characteristics, but the orbits are not closed completely, their maximal galactocentric distance is less than 40 kpc

    計算結果表明: ( 1 )大部分樣本星團都位於銀心距5kpc 10kpc的范圍內,相對于銀心呈球對稱分佈,它們的速度也呈橢球分佈; ( 2 ) 29個樣本星團按其金屬度大小和基本性質分類,可分屬hb和mp兩個球狀星團次系,且樣本星團數隨金屬度[ fe h ]而變化,在[ fe h ] = - 1 . 6處出現一個; ( 3 )所有樣本星團的軌道運動都呈性,大都在一個有界而不封閉的軌道上運動,其最大銀心距都在40kpc以內。
  20. During six menstrual cycles, the women began treatment with an estrogen gel or placebo 10 days after day 1 of peak fertility and continued daily through the second full day of bleeding

    在六個月經中,于出血當天後10天內給予雌激素凝膠或安慰劑治療,每日持續治療至第二次月經日。
分享友人