拱冠梁 的英文怎麼說

中文拼音 [gǒngguānliáng]
拱冠梁 英文
crown cantilever
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  1. The research fruits in this article can provide the temperature isoline map of crown cantilever section and central longitudinal section of the dam, the stress isoline map of crown cantilever section and upstream and downstream surfaces of the dam, the maximal and minimal stress distribution map in dam abutment along with the height of dam, the maximal and minimal stress table of typical nodes and the maximal and minimal stress table in different elevations, and also provide reference basis for taking relative temperature control measures in the design and construction of rcc arch dam

    本文研究成果可給出壩體的拱冠梁剖面和壩體中心縱剖面的溫度等值線圖、拱冠梁剖面和壩體上下游面應力等值線圖、壩肩最大最小應力沿壩高的分佈曲線、不同高程處典型點的最大最小應力值表以及不同高程處最大最小應力值表等成果,為碾壓混凝土壩的設計和施工中採取相應的溫控措施提供了參考依據。
  2. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺河口水電站工程實際資料,對m方案和n方案溫度場進行了施工期和運行期全過程模擬計算分析,給出了拱冠梁剖面和壩體中心縱剖面準穩定溫度場等值線圖以及施工期、運行期拱冠梁剖面和壩體中心縱剖面非穩定溫度場等值線圖,提供了施工期逐月和運行期每年最高、最低溫度等成果,分析了壩體溫度分佈規律以及高溫區形成的原因,並探討了預埋冷卻水管的效果和可行性以及預埋冷卻水管的區域。