拱形梁式橋 的英文怎麼說

中文拼音 [gǒngxíngliángshìqiáo]
拱形梁式橋 英文
arched-beam bridge
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • 拱形 : arcuation; arch; arched拱形板樁 arched type piling bar (鋼材); 拱形大樑 arched girder; 拱形涵(...
  1. Arcuated built - up system bridges are one of bridge structural styles, which are used extensively at present. on one hand, because of complexity and diversity of this kind of structure, current engineering experiences have not satisfied design requirements no longer. on the other hand, towards this kind of structural system traditional methods simplify complicated structures into planar structures, these methods neglect apparently spatial action among members, especially those primary bearing load members along lateral direction of bridges

    組合體系是目前廣泛採用的一種結構,一方面由於組合體系結構的復雜性和多樣性,現有的工程經驗已不能滿足設計需求;另一方面對于這種結構體系過去的傳統做法是將復雜結構簡化成平面結構,這種做法顯然忽略了構件之間的空間作用,尤其是沿橫向存在主要承力構件。
  2. This paper presents the structural design of the main bridge of lhasa river bridge, makes a deep - going study of the key techniques for design of the bridge, such as the reasonable span length ratio of each span of the 5 - span girder and arch hybrid structure, mechanical behaviour of the dual arch ribs, and section of the continuous girder tie beam, and also works out rigidity and stress conditions of the continuous girder tie beam and stress conditions of the concrete - filled steel tube arches of the main bridge

    摘要介紹了拉薩河特大結構設計情況,對於五跨組合各孔跨合理的跨度比、疊的受力行為及連續系桿截面等設計中的關鍵性問題進行了深入的研究,給出了主連續系桿的剛度和應力情況、鋼管混凝土的應力情況。
  3. The scheme is a transition between the box girder with vertical piers and the true arch.

    該結構是具有垂直墩的箱鋼與真正的之間的一種過渡
  4. Not only limited in the hybridizing of the conventional girder and arch, the hybrid system arch bridges nowadays have had new hybridizing of arches with other types of structures

    組合體系已不僅限於傳統的組合,還出現了與各種結構的新型組合。
  5. It is a top load bridge with a clear span of 288m, which is maximum one of the same structural system in asia. the main arch rib uses 8 steel tube of 920mm joined by web members and transverse truss to form a space truss. the soldier piles on the arch are made of bent frame to make the shape both artistic and novel

    梅溪河大為一凈跨達288米的上承鋼管混凝土,是目前亞洲同類型中跨度最大的,其主肋採用8根920mm的鋼管,通過腹桿及平聯成鋼管混凝土空間桁架,上立柱亦採用鋼管混凝土排架,造型新穎美觀。
  6. This paper presents and studies a new type of bridge - rc - masonry combination arch bridge based on the development of studying the high strength masonry

    本文在高強度石砌體研究發展的基礎上提出和研究了一種新的? rc -石砌體組合
  7. Suspension arch bridges as a kind of new structures are combinations of suspensions and arches which are the dorminant components to bear the forces caused in the bridge. this sort of bridges are of to some extend properties of suspension bridges and arch bridges

    懸索是一種新型結構,作為懸索及的組合結構,具有懸索二者的某些結構特點,同時由於其自身結構的復雜性,懸索又有不同於以上兩種型的靜力、動力特性。
  8. The long - span cable - stayed concrete filled steel - tubular arch bridge is a kind of new bridge structure form, which combines the cable - stayed bridge and the arch bridge harmoniously. it not only exhibits the respective merits of the cable - stayed bridge and the arch bridge, but also makes two kinds of advantages of bridge type get to add mutually

    大跨度斜拉鋼管混凝土是一種新型的結構,它將斜拉有機的結合起來,不但展示了和斜拉各自的特點,而且使得兩種型的優點得到了相互補充。
  9. Abstract : in this paper, a new simple method is put forward to on - line survey and analyse the real - time response of bridges loaded under random vehicles and people. based on linear elastic hypothesis and finite element method, the dynamic whole displacement state and load of the bridge can be obtained through surveying partial displacements, so the problem that load is unknown and difficult to determine when calculating is solved in a sense. this method is adap ted to girder bridge, arch bridge, cable - stayed bridge and suspension bridge. through the instrumentality of ways and means in this treatise, a real - time system to survey and analyse a working bridge can be established

    文摘:在線彈性假設基礎上,根據有限元理論和隨機車輛(行人)荷載的特點,討論並提出了一種通過監測部分位移,計算其餘位移和面荷載的簡化分析方法,解決了在隨機車輛(行人)荷載作用下的荷載確定問題,建立了動位移和等效節點荷載的有限元列.該方法為結構的在線監測和實時分析提供了理論基礎,適用於連續、斜拉和懸索結構,具有實際應用價值
  10. According to the bearing load institute of mainly bearing component, the basic form of bridge can be classified into beam bridge, arch bridge, rigid frame bridge, suspension bridge and assembly system bridge etc. also according to the location of trip lane, it can be classified into top travel bridge, middle travel bridge and lower travel bridge

    的基本主要承重構件的受力情況可分為:、剛架、懸索、組合體系等;按行車道的位置又可分為上承、中承和下承
  11. This paper collects a great deal of essential information of concrete - filled steel tube arch bridges having been built and to be built in the near future in china, analyzes and summarizes the numbers, span length, structural types, construction methods and materials of the type of the bridges with the aim of providing reference for the structural design and construction of more of the bridges

    摘要收集了大量的國內已建和待建的鋼管混凝土的基本資料,對其數量、跨徑、結構、施工方法、材料等方面進行分析與總結,為此類的結構設計與施工提供參考。
分享友人