拱模支架 的英文怎麼說

中文拼音 [gǒngzhījià]
拱模支架 英文
arch timbering
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • : Ⅰ名詞1 (分支; 支派) branch; offshoot 2 (地支) the twelve earthly branches3 (姓氏) a surname...
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • 支架 : support; stand; trestle; holder; rack; tressel; spur; sting; husk (hoose); buck; undercarriage
  1. With resonable calculating model and dynamic analysis method, the construction control elevation can be decided and so the precompression difficulty of support can be solved in the construction of large - span arched bridge

    採用精確的計算型和動態分析技術,一次性給出施工控制標高,解決了大跨度橋有施工中需要預壓的問題。
  2. Based on extensive investigation of construction technique history of chinese ancient buildings, the structure method, structure developing history and seismic behavior of chinese ancient timber structure buildings are analyzed in several respects of the structural system and form. through a series of experiments on constituent parts of chinese ancient timber building structure, including the tests on the corbels and brackets called dougong subjected to low cyclic reversed loadings, the tests on the wooden frame using the tenon - mortise joints as connections of column and beam subjected to low cyclic reversed loadings, the tests on vibration isolation effect of friction and slippage between column footing and their socle base, and a series of shaking table tests on a chinese ancient timber structure palace building mode under artificial earthquake at serving conditions, destroyed conditions and reinforced conditions, many valuable results of structures such as moment - curvature hysteretic loops of dougong structure and tenon - mortise joints under low cyckc reversed loadings, the static function, the seismic performance, energy dissipation, vibration reduction, energy - loss mechanism, nechanicalmode and failure mode were studied. aplenty of valuable parameters of the structure system were obtained, such as the natural period of structure, vibration modes, damping ratio, factor of vibration isolation, oscillate amplitude of ineitial accebration, velocity and displacement, magnitude of slippage, and the mechanism of structure failure and collapse etc. based on these research, the complete analysis of ancient timber structure under earthquake were carried out in which including mechanism analysis method, calculating mode, strength analysis of members and joints, strengthening methods for serving damaged ancient timber structure buildings were also taken into account

    依照宋代《營造法式》建造了抬梁式殿堂木結構構件及結構型,對中國古代木結構中的典型構造如:柱腳在礎石頂面平擱簡、柱榫卯連接、柱高不越間之廣、側腳、生起、斗等的構造機理及結構功能進行了量化分析和實驗研究: (一)通過木柱石礎靜摩擦試驗,測定了柱腳與石礎古鏡面間的摩擦系數及摩擦力隨上部結構荷載變化的規律; (二)通過單柱承載力試驗,測定了古建築中木柱的受力變形特徵、破壞式、及型材料的變形量、極限承載力、極限變形等參量; (三)通過柱低周反復荷載試驗,測定了柱的抗側移剛度、柱恢復力特性及滯回曲線、榫卯張角剛度及其變化規律、柱及榫卯的極限承載力和極限變形、及榫卯減振參數; (四)通過斗?低周反復荷載試驗和受壓試驗,測定了古建築木構件與木構件間摩擦系數,斗?抗側移剛度,斗?恢復力特性及滯回曲線,斗?抗壓極限承載力及受力變形規律; (五)通過抬梁式殿堂間型振動臺試驗,測定了殿堂木構結構自振周期,地震反應振形、阻尼特性及阻尼比;按結構分層特點對柱腳、柱頭和斗?層上的屋蓋的地震反應採用多點同步測量,對柱根滑移、榫卯變形、斗?的變形、復位、耗能減振參數等進行了定量分析。
  3. The paper mentions the design of three - dimensional graphics modeling in the mine such as shaft, laneway, and equipment of transport and mining. human - computer interaction and viewpoint rambling in the demo system are realized so that the simulating staff may look at circumstances from different viewpoint and positions. under the precondition of limited resources holding, the contradiction between the fidelity of image display and real - time feature of system interaction process is better resolved with using of display list and model culling technology

    論文中採用了opengl圖形庫的基本繪圖函數進行三維圖形的型設計,並詳細給出了立井、形巷道、梯形巷道以及工作面和井底運輸巷道設備的三維圖形設計方法;並著重分析人機交互與視點漫遊功能的技術在系統中的實現;在佔用有限資源的前提下,為了提高場景實時顯示速度,論文中採用顯示列表和型淘汰等技術,並編制出了一個虛擬礦井實例。
  4. After an introduction to the research on the software for the design of the variant steel arched girder construction, the creation of the structural model, the structure of the supporting seat, the design of the variant arched girder, and the measures taken to ensure the stability of the plane surface of the arched girder, the thesis goes to study the methods for the hoisting and the angle setting of the long - span arched girders, as well as the bolting of the axle pin in the hinge support

    論文首先對變異鋼結構設計可採用的軟體、結構型的建立、座構造形式、變異梁的設計,以及保證梁平面外穩定所採取的措施等進行了研究,然後研究了大跨度變異鋼弧形梁吊裝、角度的調整、鉸座穿軸銷等的施工方法,最後對施工完成後的位移進行了實際量測。
  5. The maximal load - carrying capability of the arch support is calculated by adopting mechanical model of curved beam based on its force analysis, and relationship between bearing capacity coefficient of small curvature arch support and radius and span of curved beam is gained based on supporting capacity comparison of curved beam and straight beam

    採用曲梁型進行了系統的受力分析,得到其最大承載能力;通過與直梁承載能力相比較,得到了小曲率承載能力系數與曲梁跨度和半徑的影響關系。
  6. Finally, the thesis primarily sets up the internal force model of the supporting structure system in the bi - arch tunnel, namely, the distribution model of the surrounding rock ' s pressure, the internal force model of the steel framework and the axial force model of the anchor bolt, and these results can have the guiding significance to the design and construction of the similar tunnel engineering

    最後,結合有限元的理論計算及現場實測數據的分析,初步建立了雙連隧道護結構體系的內力型,即:圍巖土壓力型、初期護鋼內力(主要為軸力和彎矩)型以及錨桿軸力型。充分理解和闡述了構件的工作狀態,對今後類似隧道工程的設計和施工具有一定的指導意義。
  7. Not only t he self - weigh of every beam, the prestressing, the compression on the support of form scaffolding, constriction of concrete, creeping are considered when the inter nal force is calculated, but also the result of displacement and deviation of th esupport and precamber should be taken into consideration

    施工階段的內力計算不僅考慮逐段施工梁的自重,預加應力,點壓力,以及混凝土的收縮、徐變;同時還應考慮施工程序,施工中的座位移、座偏差和預度等的影響。
  8. When applied in the contrast experiment to square annular supports and semicircle arch supports, the conclusion of numerical simulation is coherent with the result of the experiment

    應用數值擬的結論,在現場進行了方環形與半圓的對比試驗,取得了較好的效果。
分享友人