排夯 的英文怎麼說

中文拼音 [bèibèn]
排夯 英文
ramming row
  1. Because of deposit the ground form, wide soft soil and large thickness, we should use the methods to set up the standard design., such as to change and fill out a stone, lump block of stone of the strong rammer and split off the thick liquid of note and so on

    摘要深圳市港灣大道沿線屬前海灣沿岸海漫灘沉積地貌,軟土層分佈范圍廣、厚度大、性狀極差,闡述該路採用的換填塊石、劈裂注漿、插板水堆載預壓、強塊石墩等地基處理方法,進行了標準設計。
  2. Firstly, gravel piles in soil were laid for compacting and consolidating soil, then gravel composite foundation was treated with dynamic compaction in order to form three - level soil that is gravel composite soil and high replacement ratio composite foundation and dense composite foundation

    該法先在填土層中設置好碎石樁體,利用擠密和水固結的作用使其得到初步加固,然後對荷載影響深度范圍內的復合土體進行低能強處理,迫使樁體碎石沿徑向擴散,形成上部為密實的碎石二合土層、中部為擴徑后高置換率復合地基、下部為整體密復合地基的三層結構。
  3. Three experimental schemes were taken, including the draining plastic board and pre - compression with stacking load, the draining plastic board and punning, the replacement treat after punning. the deep horizontal movement of soil body, hyperstatic pore water pressure, the ground surface settlements and horizontal movements, dynamic detection and static load experiment were carried out in site

    此次方案研究採用塑料水板+堆載預壓、塑料水板+強、強置換等三種試驗方案,對土體深層水平位移、超靜孔隙水壓力、地表沉降及地表水平位移、動力檢測和靜力荷載試驗等進行了現場測試。