排水壓力 的英文怎麼說

中文拼音 [bèishuǐ]
排水壓力 英文
drainage head
  • : 排構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 壓構詞成分。
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 排水 : drain off water; drain away water; dewatering
  1. In addition, this paper carry out successfully the support design practice in the preceding excavation of 4km long exploratory tunnel. according to the thesis research results, the following conclusion can be drawn. if the grouting rock can possess sound anti - seepage capability and the liner structure can hold higher hydraulic permeability relatively, and if the adjoining rock can be made as primary load - bearing structure by construction measure, the stability of country rock and the safety of liner structure will be guaranteed

    計算結果表明,如果能使錦屏工程引隧洞灌漿圈圍巖具有較好的防滲性能,將高外控制在灌漿圈以外,再配合透性相對較好的支護結構以及措施,使灌漿圈圍巖成為主要承載結構,並使襯砌結構和灌漿圈共同承載,是可以保證圍巖的穩定和支護結構安全的。
  2. At the same time 7794m3 affusion test were processed, and roadbed settlement observation conducted for two more year, physical mechanism and chemical index experiment were analyzed in the laboratory, section experiment of earth sample was proceed, changement of compacted soil body micromechanism along with depth were analysed by polariscope and scan electricscope. drain ditch, barrel - drain and little bridge were treated by composite geotextile

    在室內進行了物理學、化學指標實驗分析,並對土樣結構進行了切片試驗,用偏光顯微鏡和掃描電鏡分析了土壤碾后沿深度分佈的土體微觀結構變化情況,對邊坡、邊溝、溝、小橋涵及護坡封採用復合土工布進行處理。
  3. On top of one of the fast - opening ends that closed to the pig receiver & launcher shall assemble vent valve, safety valve and pressure gauge, and at the bottom shall assemble drain valve, sideway inlet and vent valve to take out medium from the main pipe as the power of forcing pig and conveyance medium

    靠近收發球筒快開盲板一端上部應設防空閥、安全閥及表、下部設污閥、側面設進、出油(氣、)閥,以便從干管中取介質作為驅動清管器的動及輸出介質。
  4. The variations in trace element contents and ratios may hold up a mirror to the lake - level fluctuations and climatic changes, which, in turn, have exerted a direct and important effect on the sequence stratigraphic development. collectively, the reservoir rocks from the yanchang formation consist dominantly of the delta front subfacies subaqueous distributary channel and channel - mouth bar microfacies and delta plain subfacies subaerial distributary channel microfacies fine - grained feldspar sandstones and siltstones. the reservoir rocks have been subjected to three stages of diagenetic and porosity evolution : ( 1 ) the porosity reduction by the mechanical compaction and chemical pressure solution during the early diagenetic stage ; ( 2 ) the porosity increase by the dissolution during the a substage of the late diagenetic stage, and ( 3 ) the porosity reduction by the cementation and filling during the b substage of the late diagenetic stage

    系統的儲層特徵研究表明,該區延長組儲層成因類型主要為三角洲前緣下分流河道、河口砂壩及三角洲平原上分流河道微相細粒長石砂巖、粉砂巖;儲層巖石經歷了實,膠結,溶蝕等成巖作用,歷經早成巖機械實和化學溶孔隙縮小期、晚成巖a亞期溶蝕作用孔隙擴大期及晚成巖a亞期( b亞期)膠結充填孔隙縮小期三個成巖-孔隙演化階段;儲層物性總體上具有較低孔滲、低孔滲的特點,孔隙類型主要為粒間溶孔、殘余粒間孔隙、粒內溶孔、晶間孔及晶間溶孔,裂縫不發育,儲集巖和中值較高,孔隙結構類型以細小孔-微孔隙,微細喉-微喉型為主。
  5. The dissipation value of pore water pressure does not change along the depth. the influence depth c an reach 4 ~ 5m below the pvds

    孔隙的消散程度沿深度方向基本不變,呈矩形分佈,負影響深度可達塑底下4 5m 。
  6. When earth pressures are calculated by the shear strength parameters of cu, the way water - soil calculating separately is best, which should involve the influences of excess pore water pressure through the total stress unloading strength parameters of cu

    當採用固結不抗剪強度指標計算土時,最好採用土分算的計算方法,計算時可以通過三軸固結不總應強度指標將超靜孔隙的影響考慮在其中,但此時最好採用卸載強度指標。
  7. The lining of a tunnel in the area with high groundwater table does not bear high external water pressure in - normal, the surrounding rock reinforced by intrusion concrete does it. in the case, the groundwater through reinforced rock accumulated in the space between lining and rock must be drained in time

    一般鐵路隧道通過高位富區時,不用襯砌直接承受較高的外,要實現這個設計目標必須做好襯背的工作,使通過加固圈滲透過來的量及時走,及時削減累積的量。
  8. Shut off supply pressure and drain valve

    關閉供閥門和閥門。
  9. Key issues including water plugging types, waterproof board spreading methods, drop of external water pressure and lining design for resisting hydraulic pressure, etc. were studied, thus the composite waterproof and drainage system to control drainage were put forward, including grouting sphere for water plugging, primary support, grid sysytem for waterproof and drainage and lining to resist hydraulic pressure

    重點就堵方式、防板鋪掛形式、外的折減以及抗襯砌設計等技術問題進行了研究,提出了可通過注漿堵圈、初期支護、防網格和抗襯砌形成綜合防體系,它可以達到控制放的目的。
  10. The pore water pressure dissipation in the silt is produced mainly by lowering of groundwater table and pore water pressure dissipation in the pvds ( or sand drains ) is produced mainly by vacuum degree

    淤泥地基中孔隙消散主要是由於地下位線的下降引起的;而砂井或塑中的孔消散大部分由真空度直接引起。
  11. Based on the former research, several works in this paper is listed as follow, which is studied by experiment research, theoretical analysis and numerical calculate : firstly, based on local observation and laboratory experiment result, consolidation mechanism of vacuum - surcharge preloading is analyzed form typical mechanics and microstructure seepage factor. a great deal of observed dada is employed to analyze the deformation characteristics of soil after being treated and variation law of pore water pressure

    本文在前人工作的基礎上,通過試驗研究、理論分析、數值計算等手段主要進行了以下幾方面地工作: ( )分析了大量現場觀測成果及室內外試驗資料,從經典學和微觀滲流兩個角度解釋了塑料板真空-堆載聯合預法加固軟基機理,總結了該法加固的土體變形特點、孔隙變化規律。
  12. ( 2 ) the method of finite element discrete and optimal parameter back analysis is adopted. ( 3 ) concentrated on the question of high external water pressure of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied. ( 4 ) based on jinping cascade 2 hydropower station, numerical simulation rain infiltration of seepage field under different drainage pattern and grouting pattern are studied, also, the high external water pressure is analyzed and studied and some seepage control measures are put forward

    ( 2 )採用有限元離散?優化法進行參數的反演分析; ( 3 )針對深埋隧洞的高外問題,進一步分析和研究了襯砌荷載及外的作用機理和計算方法; ( 4 )以錦屏二級電站深埋長引隧洞作為本文的主要研究對象,採用考慮降雨入滲滲流場分析的方法對方案和灌漿封堵方案不同情況下的滲流場的頭分佈進行了數值模擬,並對其外進行了分析和研究,提出了滲流控制的具體措施。
  13. The economic design afford water resource for man - made water body by utilizing rain and some living sewage by reserving and purifying facilities, reduce the pressure of water use in landscape and rain outlet in city and realize the water resource relative balance in some area

    節約性設計利用雨、中等資源,通過貯存、凈化等設備為人工體提供補充源,減輕景觀用與城市雨,在一定區域內實現資源的相對平衡。
  14. Abstract : based on the three aspects of the dry - vibrated gravel column, compaction, seismic reducing and drainage, the pore water pressure of foundation for the expressway treated by the dry - vibrated gravel column has been calculated

    文摘:在全面考慮干振碎石樁擠密、減震、3種作用的基礎上,分析了干振碎石樁對高速公路液化地基處理后,復合地基中的孔隙分佈情況。
  15. Three experimental schemes were taken, including the draining plastic board and pre - compression with stacking load, the draining plastic board and punning, the replacement treat after punning. the deep horizontal movement of soil body, hyperstatic pore water pressure, the ground surface settlements and horizontal movements, dynamic detection and static load experiment were carried out in site

    此次方案研究採用塑料板+堆載預、塑料板+強夯、強夯置換等三種試驗方案,對土體深層平位移、超靜孔隙、地表沉降及地表平位移、動檢測和靜荷載試驗等進行了現場測試。
  16. With the established dynamic pore pressure model, the calculated results of total stress method and effective stress method are compared. consolidation settlement induced by dispersion of residual pore pressure is calculated, and the effect of pore pressure on pavement settlement is discussed

    採用本文建立的軟土地基動孔模型,對比分析了不有效應法和總應法計算結果,計算了殘余孔隙消散所產生的固結沉降,探討了孔對道路變形的影響。
  17. The pore pressure, relationship of stress and strain, and the shear strength parameters obtained by unloading tests are different from those obtained by loading tri - axial tests. later the difference is analyzed in the respect of stress path and microstructure. at last, by use of a practical project the author compared and analyzed the two sets of shear strength parameters obtained by two different stress paths

    模擬基坑開挖的三軸試驗得出了與常規三軸試驗不同的孔隙和應-應變關系,這樣得到的抗剪強度指標也低於常規三軸固結不加荷試驗所得抗剪強度指標,繼而本論文對抗剪強度指標的差異從應路徑的角度和微觀結構的角度進行了分析。
  18. Design and application of siphon type roof rainwater draining system

    屋面雨系統的設計應用
  19. As a result of the fluid in the mudstone not effectively expelled because of the reducing of permeability in the side of mudstone, abnormal pressure is formed in the alternating layers of sandstone and mudstone. hydrostatic pressure is kept because the fluid of sandstone can be expelled easily

    在砂泥巖互層中,泥巖中的流體因泥巖邊部的滲透率降低而無法有效出,形成異常超;而砂巖中的流體較易出,常保持靜
  20. Increment and dissipation of pore water pressure in dynamic drainage consolidation

    固結中孔隙增長和消散規律
分享友人