排水容積 的英文怎麼說

中文拼音 [bèishuǐróng]
排水容積 英文
volume of di lacement
  • : 排構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞(積累) amass; store up; accumulate Ⅱ形容詞(長時間積累下來的) long standing; long pending...
  • 排水 : drain off water; drain away water; dewatering
  1. The main contents include : water environment, marine sediment and the trend monitoring of marine life quality ; at the same time, to consolidate the monitoring of the functional zones, such as seashore bathing places, oceanic reserves, marine aquafarms ; to set up the seashell monitoring and controlling zones in the sea areas of both pingtan and yunxiao at the first time ; to carry out the statistical monitoring of polder, exploiting sea sand, spartin aallerni flora, terrestrial sewages, etc., to carry out monitoring of the total quantity of pollutants into the offshore marine areas in the min river, the jiulong river as well as the municipal sewages of xinlin industry in xiamen and jiaocheng in ningde ; to carry out the red tide monitoring in the offshore marine areas of fujian province ; to implement time - lapse, pointing and continuous red tide monitoring of high frequency and high intensity in the sandu gulf, the min river estuary and offshore marine areas of xiamen

    主要內包括環境、海洋沉物和海洋生物質量的全海域環境趨勢性監測,同時加強了海浴場、海洋保護區、海增養殖區等功能區監測;首次在平潭和雲霄海域設置了貝類監控區;開展了圍填海、海砂開采、互花米草、陸源污口統計監測;並在閩江、九龍江、廈門杏林工業污口、寧德蕉城市政污口鄰近海域開展污染物入海總量監測;在全省近岸海域開展赤潮監視監測,對三都灣、閩江口、廈門近岸海域赤潮監控區實施高頻率、高密度的定時定點連續監測。
  2. Volume froude number

    排水容積傅汝德數
  3. With the numerical solution, an internal condensation critical curve can be calculated out by condensation theory and depositing theory, on the curve, the enter water ability equal to the out water ability, which can be used as the basis to determine the occurrence of internal condensation. but the result doesn ’ t coincide with the real completely. in this dissertation, we plan to get the critical curve by practical experiment results, because that the enter water ability only relates to the condensation density and the out water ability only relate to the volume ratio of the pneumatics system

    然而由凝結理論和沉理論得到的計算結果往往與實際有一定偏差,本課題希望通過實驗的方法獲得內部結露臨界線,即系統進能力和能力相等的曲線,由於系統的進能力和充放氣過程中凝結滴密度有關,能力和系統比有關,可以通過大量實驗總結出以凝結滴密度和比表示的內部結露臨界曲線,作為判別內部結露是否發生的依據。
  4. It is found that the day and all - day temperature in nankai district have remarkable linear relationship with ratio of green area, ratio of water area, plot ratio and anthropogenic heat ; night temperature is only related with anthropogenic heat significantly ; and the influence significance of these factors on air temperature of different periods varies

    研究發現南開區全天、白天氣溫與區域綠化率、面比率、建築率和人為熱具有較顯著的線性相關關系,夜晚氣溫僅與人為熱具有較顯著的線性相關關系;且各影響因素對不同時段氣溫影響的顯著性不同。
  5. The design capacity of the communal drainage system is intended for handling the surface runoff arising from rainstorms, the volume of which is much higher than the volume of wastewater being inappropriately discharged into the drainage system. even though some wastewater may find its way into the communal drains, the drainage system which is serving a large catchment area should be able to handle it without increasing the risk of flooding

    公用系統的流量設計,是要把大雨所引致的地面徑流收集並走,其量及流量遠遠超過錯誤入的污流量,加上集區的面廣闊,就算有污錯誤入,公用系統都足以應付,不會增加浸的風險。
  6. Based on the analysis of satellite images of various periods, landform data and river channel transverse section evolution in the lower yellow river, the characteristics of the river channel boundary condition changes at different location are clarified as middle flood channel flood transport width and area are evidently decreased especially for the main channel with comparison to 1950s, beach area that is unimpeded before become blocked because of road, irrigation channel constructed on it, and consequently intensify high edge of beach and lowering dyke and river

    在現場查勘的基礎上,通過對丹江口庫和小浪底庫攔沙初期下遊河道演變、洪能力變化特點的對比,分析了黃河下游防洪面臨的新形勢:小浪底庫攔沙初期,下遊河道發生沖刷,但艾山以下窄河段沖淤變化不大,近年來形成的淤萎縮的狀況難以很快改觀,游蕩性河段調整劇烈,工程出險機遇增大,河道位流量關系中流量以下部分同流量位明顯降低,中流量以上部分位降低幅度可能會明顯偏小,防洪形勢仍不樂觀。
  7. Qualitative analysis on the effect of flood control and engineering safety -, seizing lots of water conservancy effective adjust storage. then making water level risen and reservoir backwater enlarged in the same flow level ? effect on beach and the buildings across river, soil salinization caused by flow from a lower to a higher place and unsmooth groundwater drainage destroy of travel resource caused by disorder enclose tideland for cultivation in reservoir silt up flood plain are given, then presents enclose tideland for cultivation dyke is important cause which water level rise in reservoir

    本文從青銅峽庫泥沙淤入手,分析庫泥沙淤特性和庫區圍墾堤開發利用淤灘地的現狀,對防洪安全及工程安全的影響、侵佔大量的有效調蓄庫、造成同級流量下位抬升庫回上延、對沿岸及過河建築構成影響、因位抬升致使庫區周邊灌區地下不暢乃至倒灌而造成土地鹽堿化、對庫庫區大量淤灘地無序圍墾造成旅遊資源破壞等五方面影響的定性分析,提出庫區圍墾堤是位抬升的重要原因。
  8. On the one hand, the sediment density current often does a great harm to the reservoir, and causes a big loss of reservoir ' s storage capacity or makes reservoir severe deposition ; on the other hand, sediment outflow by density current is an effective measure to mitigate sedimentation

    異重流(本論文中主要指因含沙量的差異而形成的渾異重流)一方面常常給庫帶來嚴重的危害,加速庫的淤和庫的損失;但另一方面它又為沙提供了一種極為有效的途徑? ?庫異重流沙。
  9. In the general objective of the curriculum, some of the old objective has been adjusted or deleted while some new added. in the curriculum content, some of the out - of - date or rather complicated content has been cut out or modified again, and some new have been offered which represent the latest achievement in mathematical research in modern times, while the organization form of curriculum content has been adjusted, too. in the content objective, the requirement level of the objective has been adjust universally, and some new types of the objective have been brough into

    在課程目標方面, 《標準》補充、調整或刪除了一些目標;在課程內方面,在對部分內以及內的組織編方式進行重新處理的同時,刪除了一些陳舊的、繁雜的內,補充了一些反映近現代數學發展的內;在內目標方面,補充了新的目標類型,大面調整了目標的平要求。
  10. To remove mosquito eggs and prevent mosquito proliferation, water in household containers should be cleared at least once a week. make sure that no water is accumulated in trays under air - conditioning units. moreover, water containers, vases and pot saucers, drains and surface drainage channels should be scrubbed at least weekly

    由於蚊卵在乾旱的氣候下仍然可以生存,遇到合適的環境便會孵化,因此市民須採取防治措施,至少每星期清除家居器的,留意冷氣機托盤是否有,並洗擦貯器、花樽和花盆墊碟的邊縫、溝渠和明渠,消滅可能聚的蚊卵,避免蚊蟲滋生。
  11. However aquaporin deletion did not significantly affect aqueous fluid outflow, volume or [ cl ' j, or anterior chamber compliance

    05 ) 。但房出流暢系數、房間隙順應性、房和氯離子濃度無明顯變化。
  12. Aqueous fluid volume and [ c1 ~ j were assayed in samples withdrawn by micropipettes. intraocular pressure ( top ), pressure - dependent outflow, and anterior chamber compliance were determined from pressure measurements in response to pulsed and continuous fluid infusions into the anterior chamber using micropipettes. result : in wildtype mice ( gdi genetic background, age 4 - 6 weeks ), iop was 16. 0 ? 0. 4 mmhg, aqueous fluid volume was 7. 2 ? 0. 3 ul, aqueous fluid production was 3. 6 ? 0. 2 ul / hr, aqueous fluid outflow was 0. 36 ? 0. 06 ul / hr / mmhg, and anterior chamber compliance was 0. 036 ? 0. 006 ul / mmhg ( mean ? se, 8 - 10 eyes )

    實驗方法包括:將熒光物質用電離子滲透的方法穿透角膜導入活體小鼠的前房中,然後應用共聚焦顯微鏡根據熒光強度變化測量房生成率;通過顯微注射針吸取房檢測房和氯離子濃度;顯微玻璃管刺入前房測量眼內壓,並將生理鹽分別以連續和脈沖兩種方式注入前房,測量房間隙的順應性和房出與眼內壓的相關性。
  13. Novel methods for measurement of intraocular pressure / volume and aqueous fluid production / outflow were applied in comparative studies of wildtype mice vs. mice lacking aqp1 and aqp4 ( individually and together ). methods : aqueous fluid production was measured by in vivo confbcal microscopy after transcomeal iontophoretic introduction of fluorescein into the aqueous fluid

    創造性地設計和建立了小鼠眼房動力學測量的系統方法,對野生型小鼠和通道蛋白敲除小鼠的眼內壓、房、房生成和出等生理特徵,分別進行了系統檢測和對比分析。
  14. Meanwhile, because there are a lot of sediments in sewage in the forebay, the bad flow pattern will make sediments depositing freely and the sediment deposition will cause worse flow pattern

    同時,由於污泵站進流中含有大量的懸浮固體顆粒,不良的前池流態會使泥沙更易在前池淤,而泥沙淤又進一步加劇了前池流態的惡化。
  15. This valve cca automatically exdudes coagulate water on time that the heating facility will not gather water inside and obtains the best heating efficiency, lt ' s advantage was exerted when lots of coagulate water should be exduded

    該閥能自動及時除大量凝潔,使加熱設備內不會有聚,從而獲得最高加熱效率,在需要大除凝潔工況時,能充分發揮其優越性。
  16. The sediment problems of this project in design is that the deposition of sediment causing the permanent loss of reservoir capacity. the measure of enlarging the discharging of water and sediment can reduce deposition, but the concentration of sediment is bigger and much sediment passes through the pump - turbines

    減少庫庫損失,加大沙量,會造成在發生洪時期庫內含沙量加大,抽時會有更多的泥沙過機,機組因泥沙而磨損。
分享友人