排水工作 的英文怎麼說

中文拼音 [bèishuǐgōngzuò]
排水工作 英文
drainage works
  • : 排構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 排水 : drain off water; drain away water; dewatering
  1. While working, the air with dust enters into the sedimentation chamber via wind entrance, dust with large size granule will fall because of sudden expand of the aeriform cubage, then the air will pass the water area of arc boards of the two sides to stir the water. then air with dust will be mixed with water forming water curtain at the exit, fine powder will be collected, purified air will be discharged by blower fans via breakwater and wind exit

    時含塵空氣從進風口進入沉降室由於氣體的體積驟然膨脹,大顆粒粉塵沉集下來,然後空氣經過兩側弧形板間的域並將攪動含塵空氣與充分混合在出口處形成幕,較細的粉塵捕集下來,凈化后的空氣經擋板和出風口由風機走。
  2. Management and control of cleaning operations in drains and sewers - part 1 : sewer cleaning ; german version en 14654 - 1 : 2005

    溝和下道清潔的管理和控制.第1部分:下
  3. Drainage way with floor blocked up, drainage with back outlet sanitary facilities and drainage with floor descended are discussed and summarized. a new drainage way with floor descended is introduced which solves the problem of seeper drainage

    程實例中,提出了一種新的下沉式方式,徹底解決了目前下沉式法的下沉空間積除問題。
  4. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築程質量保修辦法》對房屋建築了最低保修期限的規定:其中1 、地基基礎程和主體結構程,為設計文件規定的該程的合理使用年限; 2 、房屋防程、有防要求的衛生間、房間和外墻面的防滲漏,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣管線、給管道、設備安裝為2年; 5 、裝修程為2年。
  5. The key to that is a so - called rankine cycle engine, which captures waste heat from the car ' s exhaust and puts it back to work to heat water, which gets converted to steam to power an electric generator, which in turn charges the car ' s battery pack

    這項技術的關鍵是被稱為「林肯循環引擎」 ,它抓住了廢熱從汽車的尾氣出,使它重新投入,以熱轉化為蒸汽,啟動電動發電機。
  6. So as the enter point of the stream, the income of the reservoir, the time of the flood peak lasted, the quantity of sandiness income and the strobe of the darn. we must do some work to forecast and watch the different density stream. by experiments, we made out that it is impo rtant for us to reduce the water lever in work of the river belongs lots of sandiness

    從異重流試驗看,在正常運用下,庫產生泥沙異重流的機率較大,能否運動到壩前出庫外,還要看異重流潛入點位置、入庫流量、洪峰歷時、入庫含沙量、庫閘門運用等因素,需要做好異重流預報監測
  7. Cannula compensator is comprised of body tube, compensation tube, flange and gadket. the product is applied in the drainage engeineer, providing great convenience to the detachment and installation of water tower and water meter of pump room. and it plays a role to resolve the compensation issues caused by temperature difference for long pipeline. sgd, axial displacement., , ,

    套管式伸縮器是由體管伸縮管壓蘭密封圈構成的,此產品用於給程,它為城鎮自來塔泵房表及閥門安裝拆換提供了極大的方便,以及對長距離管道用溫差引起的伸縮問題,起到了良好的填補用。
  8. 1 year or more experience in plumbing system

    一年以上從事給經驗。
  9. In the topic 1, utilizing the natural lysimeters and drainage region in wudaogou station, based on expriment and imitation methods, frist the hydrology effect of drainage has been analyzed, and then the index of water logged farm drainage and suitable ground water level have been provided. on the theory of darcy rule and farm hydrodynamics, the standard and pattern and empirical formula of farm drainage system have been presented as well, and provide scientifically foundation for drainage planning

    在農田技術研究中,利用五道溝實驗站地中蒸滲儀和試驗區,採用試驗法和動態模擬法,分析了程的文效應,提出了農田漬標準和物適宜的地下位埋深,採用達西定律和農田動力學原理,提出了農田系統的規格、布置方式及經驗公式,為程規劃提供依據。
  10. It is important for drainage work since checks can be made on its effectiveness before planting.

    排水工作很重要,因為在栽植前就可對其效果加以控制。
  11. Observe the site condition especially the south hidden creek area in any moment, arrange the dewatering and drainage according to the site actual condition and weather condition, ensure the successful construction

    隨時觀察現場情況,重點是場地南側的暗浜區域,根據現場實際情況和天氣條件安排水工作,保證壓樁安全,順利地施
  12. The lining of a tunnel in the area with high groundwater table does not bear high external water pressure in - normal, the surrounding rock reinforced by intrusion concrete does it. in the case, the groundwater through reinforced rock accumulated in the space between lining and rock must be drained in time

    一般鐵路隧道通過高位富區時,不用襯砌直接承受較高的外壓力,要實現這個設計目標必須做好襯背的排水工作,使通過加固圈滲透過來的量及時走,及時削減累積的量。
  13. The synthetic experimentation of testing and calculating design depth in conveyance canal combine the knowledge of irrigation and drainage engineering and hydraulics. during the experimentation, through experiment data testing, analysis, calculating and watching canal model, making students understand further the principle of design, which has mutual promoting effect on theory teaching in class

    渠道橫斷面設計深測試及計算實驗結合「灌溉程學」及「力學」等學科的知識,在實驗過程中,通過對實驗數據的測試、分析及計算和渠道模型實物的觀摩,加深了對渠道設計原理的理解,與課堂上的理論教學起到了良好的互動用。
  14. The dc draining electromagnet zdt series is the main accessory for the household full - auto washers and acts as openingclosing the drainage valve when working after being rectified with a diode bridge rectifier

    直流電磁鐵zdt系列是家用全自動洗衣機主要配件,經二級管橋式整流后,主要起打開關閉用。
  15. The construction of the course system of water supply amp; drainage engineering and the design of web page

    程專業課程體系構造與網頁製
  16. As the important facility of freeway, the investment and environmental effects of resting area were highly affected by its water and wastewater engineering

    摘要高速公路服務區為高速公路上的重要設施,給程設施對其投資和環保影響甚大。
  17. After acquiring the land for the hsr taichung station, the following public construction projects will be conducted : land preparation, road engineering, sewerage system, water engineering, foul sewer, public illumination, traditional piping and bridge work

    高鐵臺中車站地區區段徵收公共程施項目包括:整地程道路程自來程污程公共照明及傳統管線埋設程橋梁程等。
  18. Because suction operations e. g. from floods are performed quite routinely, the pressure gauges are designed for indication of over - and underpressure

    在日常生活中十分常見例如放洪,因此,我們的壓力表上設計有過壓和欠壓指示裝置。
  19. The salary package wasn ' t unimportant but came well behind what might be called the holistic details of the job

    情況不是不重要,而是應的整體細節情況之後。
  20. As far as the lists of urban engineering layout are considered, city general planning, district planning and detailed local planning all include the related contents of city infrastructures planning. in the recent years, some cities have commenced to compile the special planning such as " city transportation planning ", " water drainage works planning ", etc., but considering the contents, deepness and expressional method they still should be ranked in general planning. they mainly control macroscopically and reveal the aspects of large - scale establishments, construction standards and framework

    就市政程規劃的序列而言,城市總體規劃、分區規劃、城市局部地區詳細規劃都包含了市政基礎設施規劃的有關內容,近年來,一些城市著手編制了諸如「城市道路交通規劃」 、 「程規劃」等專業規劃,但其內容深度及表達形式仍屬總體規劃的序列,主要是對一些大型設施、建設標準、布局結構方面的宏觀控制和展現,其成果圖紙多為1 /萬以上比例,其內容深度難以直接為設計和建設的依據,控制性詳細規劃或修建性詳細規劃層面的市政基礎設施規劃在內容深度上已具有了一定的可操性,但其多為局部地段的規劃,無法保證市政設施整體性、系統性要求。
分享友人