排泥管道 的英文怎麼說
中文拼音 [bèiníguǎndào]
排泥管道
英文
mud pipe- 排 : 排構詞成分。
- 泥 : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
- 管 : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
- 道 : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
- 管道 : [工業] pipeline; channel; tunnel; piping; canalis; pipe run; duct; conduit; conduit pipe; ducting...
-
To comply with monitor and inspection of the quarterly, half yearly, and yearly inspection and remedy of rooftop, roof space, deck, ground, basement, down pipe, sanitary pipe, air vent, cement & concrete, structural, foundation, beams, ironmongery and all related
對屋頂,地板,地下室,下水道,排水管,排氣口,水泥和混凝土,地基等相關的結構設備進行每季度,每半年,每年的檢查和修理。Fibre - cement pipes for sewers and drains - manholes and inspection chambers
下水管和排水道用纖維水泥管.人孔和檢驗井Fibre - cement pipes for sewers and drains - pipes, joints and fittings for gravity systems
下水管和排水道用纖維水泥管.第1部分:重力管路系統用管道管連接件和管配件A total of 48 km of sewage pipes were installed, serving an area of 20 square km. as a result, lhasa is no longer muddy during the rainy season. two waterworks were built and connected through a 70 - km network of pipes to some 60 percent of homes
全城新修柏油馬路15條,全長70公里,拉薩街道變得平坦寬闊了;鋪設上下排水管道48公里,服務面積20平方公里,拉薩再也不是下雨滿城水滿城泥了;新建自來水廠兩個,鋪設水管70公里,供水面積占城區的60 ,拉薩人從此能喝上新鮮清潔的自來水了。Correspondingly, its theory is up to developed to a higher level. in this thesis, taking the risk management activities of the two parties of insurance as the perceptive and the process of engineering insurance as the clue, the establishment of risk management system is analyzed during the process of risk identification and evaluation, insurance contract arrangement, disaster prevention and loss reduction, and the compensation management. furthermore
本文在查閱大量文獻的基礎上,對疏浚泥泵及排泥管道的動態特性現象進行了分析,並應用面向對象的c + +語言開發了比較通用的計算機程序,對緊急關閥、水下挖掘機具(如絞刀、斗輪等)吸泥口堵塞以及事故拋泵等典型的動態工況特性進行了計算和分析。Fibre cement pipes for drains and sewers - part 2 : manholes and inspection chambers ; german version en 588 - 2 : 2001
排水管和下水道纖維水泥管.第2部分:人孔和檢查室En 588 - 1 fibre - cement pipes for sewers and drains. part 1 : pipes, joints and fittings for gravity systems
地下排水管道用纖維水泥管.第1部分:重力循環系統用管子接頭和配件Practice for installation of poly vinyl chloride linear and cementitious grout for rehabilitation of existing man - entry sewers and conduits
現有排污管和管道修復用聚氯乙烯管線襯里和水泥薄漿安裝慣例Fibre - cement pipes and fittings for discharge systems for buildings - dimensions and technical terms of delivery ; german version en 12763 : 2000
建築物排水系統纖維水泥管道和配件.尺寸和交貨技術條Standard specification for asbestos - cement storm drain pipe
石棉水泥排雨水管道標準規范Sludge disposal system availability range from c13 superscript bin discharging sludge dewatering mouth, until dry sludge provide material, burning, smoke and ash emissions purification of the entire output of mechanical equipment, process pipelines, electrical equipment, instrument control system and civil engineering, including the whole project within the scope of the design, construction, manufacture, installation, and trial run and test run after the normal operation of the after - sales service
污泥處置系統供貨范圍從c13標脫水污泥料倉出料口開始,直到干化污泥出料、焚燒、煙氣凈化排放和灰渣輸出為止的整套機械設備、工藝管道、電氣設備、儀控系統和土建工程,包括整個工程范圍內的設計、施工、製造、安裝調試、試運行及正常運行后的售後服務。Based on the activated sludge model no. 1, and a sewer model, which was put forward by t. hvitved - jacobsen in 1998, and combined with reactor principles, a sewage quality mathematical model was proposed in gravity sewer
本文在解析活性污泥1號模型( asm1 )和hvitved - jacobsen排水管道模型的基礎上,結合反應器原理,建立了重力流排水管道內水質變化數學模型。Standard practice for installation of poly vinyl chloride profile strip liner and cementitious grout for rehabilitation of existing man - entry sewers and conduits
排污管和管道修復用聚氯乙烯異型條襯里和水泥薄漿安裝的標準實施規程分享友人