排泥系統 的英文怎麼說

中文拼音 [bèitǒng]
排泥系統 英文
sludge - discharge system
  • : 排構詞成分。
  • : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : Ⅰ名詞1 (事物間連續的關系) interconnected system 2 (衣服等的筒狀部分) any tube shaped part of ...
  • 系統 : 1. (按一定關系組成的同類事物) system 2. (有條理的;有系統的) systematic
  1. The paper is based on the construction of the express - highway between yiyang and changde in hunan province, aiming at enhancing the serviceability of cement concrete pavement, probing into the structural assemblage of the cement concrete pavement, the roadway drainage system, contraction joint with the dowel bar and precaution of bumping at the end of the abutment. it presents some achievements of the research, including more reasonable structural assemblage and roadway drainage system, the method of setting dowelled bar in contraction joint, putting forward the concept of stage - transition from rigid to flexile behind abutment

    本文以湖南省益陽至常德高速公路項目為依託,以提高水混凝土路面使用性能為目標,就水混凝土路面結構組合、路面、縮縫設置傳力桿、橋頭跳車問題的防治等方面開展研究和工程實踐,取得了豐富的研究成果,如研究採用了更合理的路面結構組合,設置了較完善的路面,在國內高速公路上率先全面採用縮縫加傳力桿技術,對所有橋涵構造物臺背全部採用剛柔過渡技術處理橋頭跳車問題等。
  2. Standard features include : 3 ” waste outlet valve, left side service, 2 ” fresh water outlet valve, sight glasses, hose bracket, strap tie - down brackets, bumper hitch, rear mud - flaps, wand holster, unique baffle design, keyed locking cabinets

    標準包括: 3 "大小污口閥,左邊服務, 2 "大小清水閥、視鏡、軟管支架、捷牽制下拉支架、防撞緩沖器、後方瓣、棒皮套、獨特設計擋板、可鎖壁櫃。
  3. The studies on flocculation parameters of high turbidity water are completed more integrally, including establishing the equation about the relationship between the covering ratio of flocculent on silt surface 6 and the surface area of silt particles s. the re - concentration law of thickener underflow is studies

    建立了一定沉速下,沙固體顆粒表面覆蓋率與沙顆粒表面積s間的函數關式;較地完成了高濁度水絮凝參數的研究。研究了高濁度水沉澱池的再濃縮規律。
  4. Highways sewerage, drainage, dredging, solid waste railroads and railways management

    污水治理、、挖、土地資源管理
  5. Sludge liquor is recirculated in the secondary system to assure its purity before discharge.

    水迴流到二級處理,以保證放前的澄清度。
  6. Fibre - cement pipes for sewers and drains - pipes, joints and fittings for gravity systems

    下水管和水道用纖維水管.第1部分:重力管路用管道管連接件和管配件
  7. The main aim of system harness of man - made debris flow is to make potential debris flow not broken out and present debris flow decreased

    控制固體物質補給是關鍵,合理設計規劃棄土石渣的放場地是重點,搞好匯水區水土保持工程是基礎,調整溝床比降,減少水流動能,使石流暴發減少到最低程度。
  8. Abstract : a self - designed conensate treating system is used to treat thewaste gas from a foundry sand core according to an analysis of its emission features, an obvious treating effect is obrained, which reaches the national emission standard

    文摘:通過對鑄造芯廢氣放特性的分析,採用自行設計的冷凝水洗處理,廢氣治理效果明顯,達到了國家放標準。
  9. En 588 - 1 fibre - cement pipes for sewers and drains. part 1 : pipes, joints and fittings for gravity systems

    地下水管道用纖維水管.第1部分:重力循環用管子接頭和配件
  10. Based on plenty of investigations and researches, the thesis developed lots of lively, vivid, visual integrative monitor and alarm interfaces with excellent interactive quality by processing graphical edit software in the integrative monitoring and alarming system. the thesis managed to make them to be an ordinal, clear and distinct system, by programming and designing as a whole, arranging and organizing systematically

    疏浚模擬訓練器集中監控報警以國產1750m ~ 3 h絞吸式挖船集中監控報警為模擬母型,在大量調查研究基礎上,通過對各種監控數據、報警提示適當取捨、擴充,並進行總體規劃設計,經過分門別類地編組織,採用過程圖形編輯軟體開發了大量生動、形象、直觀、交互性強的集中監控報警界面,使之組成脈絡分明、層次清晰的有序
  11. The pattern of shoujinliao ' s climatic design : first, it talks about shoujinliao ' s ventilation, analyses every stale belong to each compose of space appeared in shoujinliao. sum up that ventilation system is made up by draught and wind route, by showing data and photograph, then, it talks about shoujinliao ' s methods of sunshade and heat insulation, that is, sunshade of concentrated, sunshade of small yard, sunshade of eaves, sunshade of balcony. heat insulation of outward wall, clay tiled roof and composition neatly

    著重分析手巾寮結合氣候的模式,首先談及手巾寮建築通風經驗,深入分析各種空間高低組合情況下手巾寮的通風情況,藉助調研資料和實景照片對通風中通風口和風道的合理安進行介紹;其次是手巾寮其他氣候經驗,如遮陽方式主要體現在連房密集遮陽、小天井遮陽、檐下灰空間遮陽、陽臺遮陽等,又如隔熱途徑有墻體隔熱、灰苫背瓦屋面隔熱及規整形隔熱,再如綠化水體的降溫措施,上升到環境高度看待建築,探討手巾寮組織天井綠化、利用街巷綠化、配合周邊水域的建造經驗。
  12. By means of inquisition, the paper analyzes the causes of cement concrete pavement damage in earlier period, divides its damage into stages and analyzes the damage mechanism in theory, then puts forward relevant countermeasure for all stages. on base of these, by studying large quantity of experiments indoors combined testing road, the technique of pressing mortar under cement concrete plank and changing pavement plank, the material used to quickly repair pavement and system for draining off water are analyzed and researched in detail from principle to craft. at same tune, all kinds of repairing material and technique adaptable to cement concrete pavement are put forward

    本文通過對水混凝土路面破損的調查,分析了造成水混凝土路面早期破損的原因;劃分了水混凝土破壞階段,對不同階段的破壞機理進行了理論分析,並相應的提出了各階段的維修養護對策;在此基礎上,通過大量的室內試驗並結合試驗路的研究,重點對水混凝土板底壓漿技術、水混凝土路面的換板技術、水混凝土路面的快速修補材料以及對水混凝土路面的從技術、原理到材料工藝進行了詳細研究和理論分析,提出了適應各種水混凝土路面破壞的修補材料和修補技術;最後本文還對修築水混凝土路面提出了具有指導性的建議。
  13. The routine maintenance, distress treatment and pavement drainage improvement are presented to solve this problem

    對水混凝土的日常養護、病害處治和完善等技術問題進行了分析,提出了相應的解決方法。
  14. Fibre - cement pipes and fittings for discharge systems for buildings - dimensions and technical terms of delivery ; german version en 12763 : 2000

    建築物纖維水管道和配件.尺寸和交貨技術條
  15. Based on the investigation and analysis on the design structure, factual structure, damage, drainage, traffic volume, construction of cement concrete pavement in zhengzhou, this paper finds out the defect on design, construction and maintenance of cement concrete pavement, and discusses the main reasons which cause it to damage in theory and practice

    本文通過對鄭州市具有代表性的水混凝土路面結構設計狀況、實際路面結構狀況、破損狀況、水狀況、交通量狀況、施工情況、養護情況的詳細調查和較的分析,找出了水混凝土路面設計、施工、養護等方面存在的不足,並從理論和實踐上論證了這些不足是造成水混凝土路面損壞的主要原因。
  16. The problems of carbon source supply and sludge age control could be effectively solved in the processes by means of " one carbon source for two uses " and " two - sludge system ", meanwhile phosphorus and nitrogen can be removed with less oxygen requirements and sludge production

    該工藝以其特有的「一碳兩用」和「雙」 ,有效解決了常規生物脫氮除磷工藝的碳源供求矛盾和齡控制問題,可同時獲得較高的除磷和脫氮效率,並具有所需曝氣量少,剩餘污放量低等特點。
  17. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪底水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐設計有3條沙洞,擔負著泄洪、沙、調節徑流和保證進水口不被沙淤堵的任務.根據沙洞的水庫運用要求,灌漿帷幕下游沙洞洞身段設計為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例
  18. Sludge disposal system availability range from c13 superscript bin discharging sludge dewatering mouth, until dry sludge provide material, burning, smoke and ash emissions purification of the entire output of mechanical equipment, process pipelines, electrical equipment, instrument control system and civil engineering, including the whole project within the scope of the design, construction, manufacture, installation, and trial run and test run after the normal operation of the after - sales service

    處置供貨范圍從c13標脫水污料倉出料口開始,直到干化污出料、焚燒、煙氣凈化放和灰渣輸出為止的整套機械設備、工藝管道、電氣設備、儀控和土建工程,包括整個工程范圍內的設計、施工、製造、安裝調試、試運行及正常運行后的售後服務。
  19. The basic physical and mechanical properties, mineral composition, micro structures, swelling potential, consolidated drained triaxial shear strength, parameters of constitutive model and residual strength of the soft clayey rocks were tested in laboratory with a large number of natural samples. the changing trend of the strength about these rocks is obtained by modeling the condition of softening due to immersion. from the principles of modern soil mechanics, the structural and swelling characteristics of soft clayey rocks were analyzed systematically

    本文通過現場調查,查明風化質軟巖的宏觀結構特徵,利用現代試驗測試手段,取原狀土進行特殊土室內土工試驗,測定土的基本物理力學特性、礦物成分及微觀結構、膨脹性、三軸水剪強度及本構模型參數、軟化殘余強度,並模擬土體在長期浸水軟化后的強度變化趨勢,測試該類土的浸水軟化殘余強度。
  20. Research work of the lab is focused on biological wastewater treatment ; biological nutrient removal ; microbiology of bnr ; automatic & intelligent control of activated sludge process ; wastewater treatment equipment of an organic whole ; sludge disposal ; micropollution treatment ; wastewater reuse ; management information system ( mis ) of water environment and waste water treatment et al

    本研究室研究方向:以污水生物處理為主、污水脫氮除磷技術、污水處理的自動控制與智能控制、污水處理設備成套化、分子生物學在污水處理方面的應用、高濃度難降解工業廢水處理新技術、污處理與資源化、微污染水源水處理、城市污水資源化與再生利用、水環境與水工程的地理信息等。
分享友人