排班 的英文怎麼說

中文拼音 [bèibān]
排班 英文
arrange an order according to class and grade
  • : 排構詞成分。
  • : Ⅰ名詞1 (編成的組織) class; team 2 (一天之內的一段工作時間) shift; duty 3 (軍隊的基層單位) s...
  1. Roster management : calendar setup and over - time handling

    完善的考勤排班設置加管理
  2. Between march 2006 to june 2006, i worked in electrical wire company, responsible for the managememt in base layer and technological study. though it is not a long time, i got work experience from there as well as bear myself

    2006年3月到6月在電線廠工作,主要從事基層的管理(排班,寫報告,傳文件)和技術的學習(電線的製作及質量檢驗) ,雖然時間不錢,但在那裡學到了工作經驗,也了解到了一些為人處世的道理。
  3. When solving the tna problem based on fleet balance application, a flight pairing network model is build, by which the primary problem transferred to a directed path decomposition problem to minimize target function, and a simulated annealing algorithm is constructed

    在解決使飛機均衡使用的飛機排班問題時,本文利用航節的網路模型將原問題轉化為一個使目標函數最小的航節編組問題,在此基礎上構造了一個模擬退火演算法。
  4. When solving the tna problem based on fleet dispatching commands, a stage - assignment algorithm is build to overcome the defect of fifo algorithm, which can be widely applied to cope with fixed job scheduling problem. 3

    在解決基於飛機調度指令要求的飛機排班問題時,本文提出的分階段指派演算法較好地克服了標號演算法的缺陷,該演算法能普遍地應用於處理類似的固定工件序問題。
  5. Did scheduling allow personnel adequate sleep

    排班讓工作人員有適當的睡眠嗎?
  6. Mooj, we try to be fair with the schedule but it ' s hard

    穆吉,我們試圖讓排班表公平不過這很難
  7. Prepare monthly work schedule for staff

    準備員工排班表。
  8. Research on the modeling and algorithm of multi - objective crew rostering

    解決排班問題的多目標優化模型及演算法研究
  9. Okay, but why every damn schedule comes up, i get most early shift

    好,可是為什麼每次排班之後大部分的早給我了?
  10. Optimization of crew scheduling for urban rail transportation based on time costs

    基於時間耗費的城市軌道交通乘務排班優化
  11. To assign duties and responsibilities to subordinates and to assist them in their duties

    負責下屬的排班並在需要時給予他們幫助。
  12. All these research sets a primary foundation for developing airline tail number assigning system software

    該項研究為研製飛機排班決策支持系統軟體奠定了理論基礎。
  13. Every morning, the chief concierge will review all limousine bookings for next day for arranging drivers ' duty roaster

    每天早上,禮賓部主管檢查第二天訂車單來安司機的排班
  14. On the basis of operational characters of domestic airline by now, a mathematical model describing tna problem is constructed, and by classifying a specific tna problem into one of three typical tna modes, corresponding heuristic algorithms are reconstructed. this research supplies a domestic gap in this field. 2

    根據當前國內航空公司的運營組織模式特點,以及飛機排班工作的實際需求,提出了描述飛機排班問題的數學模型,並通過將一般形式的飛機排班問題歸結為三種典型的飛機排班模式,構造出相應的啟發式演算法,填補了國內在此領域的研究空白。
  15. Firstly, a 0 - 1 integer programming mathematical model is constructed to describe tail - number - assigning work happened in domestic airline, since the problem is npc, a unified polynomial algorithm which satisfies engineering requirement is unavailable. illuminated by the practical experience, a specific tna problem is classified into one of three typical tna modes : tna based on fleet dispatching commands, tna based on fleet balance application, tna based on minimum fleet requirement ; secondly, by simplifying and relaxing some minor constraints, corresponding mathematical models and heuristic algorithms are reconstructed for each typical tna mode ; finally, computing complexities are discussed

    為此論文在借鑒手工編制排班計劃經驗的基礎上,將一個具體的飛機排班問題,歸結為三種典型排班模式中的一種,即:基於飛機調度指令要求的排班問題,基於飛機使用均衡要求的排班問題和基於最少需用飛機數的排班問題,對于每種典型的飛機排班模式,在對次要的約束條件進行簡化、松馳的基礎上構造出相應的能夠滿足工程應用要求的啟發式演算法,並分析了演算法的復雜性。
  16. Qdml arranges their employees working on a good roster of 3 ~ 7week - on / 9 ~ 21days - off depending on work requirement and pays for employees ' travel between the work site and the point of hire

    青海大柴旦礦業有限公司根據工作需要為員工安了很好的工作/休假排班: 3 ~ 7周工作/ 9 ~ 21天休假,並支付員工的休假旅行(工作地點與招聘地之間)費用。
  17. The shift arrangement problem belongs to the domain of combination optimization and plays an important role in airlines ’ operating control

    機組排班問題是屬于組合最優化的問題,在航空公司的運營控制中佔有重要地位。
  18. 4. when solving the tna problem based on minimum fleet requirement, a bipartite graph describing flight - pairing - link property is constructed, by which the primary problem is transferred to two weighted bipartite matching

    在解決最少需用飛機數要求的飛機排班問題時,本文將尋找航節銜接方案問題,描述成一個二部圖的匹配問題,進而通過解兩個二部圖的最小權最大匹配,尋找需用飛機數最少的飛機調度方案。
  19. The challenges of attendance tracking management include the need for flexible shift or roster plans, control of labor costs and real - time attendance monitoring and analysis

    企業要建立高效的考勤管理所面臨的挑戰包括:靈活合理的排班計劃,勞動力成本的有效控制,實時的考勤數據審核和分析。
  20. From march to june in 2006, i worked for a electrical wire factory in charge of management for grass roots ( arrange shifts, write reports, deliver documents ) and technology training ( wire manufacturing and quality check ). it was not long, but brought me a lot of experience both in work and life

    2006年3月到6月在電線廠工作,主要從事基層的管理(排班,寫報告,傳文件)和技術的學習(電線的製作及質量檢驗) ,雖然時間不錢,但在那裡學到了工作經驗,也了解到了一些為人處世的道理。
分享友人