排程問題 的英文怎麼說

中文拼音 [bèichéngwèn]
排程問題 英文
scheduling problem
  • : 排構詞成分。
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • : Ⅰ動詞1 (請人解答) ask; inquire 2 (詢問; 慰問) question; ask about [after]; inquire about [aft...
  • : Ⅰ名詞1. (題目) subject; title; topic; problem 2. (姓氏) a surname Ⅱ動詞(寫上) inscribe; write
  • 問題 : 1 (需回答的題目) question; problem 2 (需研究解決的矛盾等) problem; matter 3 (事故或意外) tr...
  1. Drainage way with floor blocked up, drainage with back outlet sanitary facilities and drainage with floor descended are discussed and summarized. a new drainage way with floor descended is introduced which solves the problem of seeper drainage

    在工實例中,提出了一種新的下沉式水方式,徹底解決了目前下沉式作法的下沉空間積水
  2. Analysis of experimental data indicates that there exist several following problems during the whole operation : first, the emission is serious and the density of hc and co smoke is very high at on and off period. second, there is oil dripping from the dripping vitta as a result of the fault of ignition system and combustion structure. the last, there might be accidents of disabled ignition resulted from the improper operation at the beginning

    通過對樣機的試驗分析和研究表明,汽車空氣燃油加熱器在整個工作過中,其放存在以下三個:一、開機和關機兩個階段的嚴重,廢氣中hc和co的濃度值及煙度測量值都很高;二、因點火系統和燃燒結構的缺陷而導致開機后一段時間內有油滴從滴油管滴落;三、在點火過中,會出現因操作不當而點火失效的現象。
  3. T. p. hong, p. y. huang, and g. horng, ( 2004 ) " combining the lpt and the gupta approaches to solve group flexible flow - shop problems, " 15th international conference of information management, taiwan, may 29, 2004

    洪國寶,王乾隆,洪宗貝,黃?瑩, "擴展pt演演算法以解決彈性流, " 2003人工智慧、模糊系統及灰色系統聯合研討會, 2003年12月
  4. 3 based on the shape of conic plug, the profile modeling - annulus equipment which can make plug in a line is designed. this equipment can not only solve the plug lining - up problem in mechanizing way when plug seedlings are transplanted, but also can raise the working speed of no - tillage transplanter, and reduce the working intensity of operator

    3利用圓臺形缽體的外形特點,採用仿形導向輪式隊裝置,解決了栽植過的缽苗機械化,提高了免耕栽植機的作業速度,減輕了操作人員的勞動強度。
  5. Abstract : the paper presents the study on problems of self - excitation , over - voltage , frequency and voltage stability , organizational measures and arrangement in the course of black start and restoration of the system. through simulation of black start on east china power system , above problems are analyzed and solved , it shows that working out strict black start scheme may not only speed up system restoration , reduce outage losses , but also have important significance to emergency release or power system islanding

    文摘:研究電力系統黑啟動的過及恢復中存在的自勵磁、過電壓、頻率和電壓穩定、組織措施及安,並通過華東系統黑啟動模擬對上述進行分析和解決,證明制定嚴格的黑啟動計劃不僅可以迅速恢復系統、降低事故損失,而且對處理緊急狀態或地區性解裂有重要意義。
  6. By this algorithm, the optimal solution can been obtained in transportation problem n assignment problem, traveling salesman problenu flow shop sequencing problems hamilton problem. in addition, numerical examples have been given to demonstrate the actual applicant procedure

    並且通過對、貨郎擔貨、指派、 hamilton等線形規劃典型算例的求解,表明新的分配原則在一定度上簡化了原有的分配過,具有更強的通用性。
  7. In this study, we consider the maintenance scheduling problem in a textile company where different maintenance situations exist

    在本研究中,我們考慮一家化纖公司,存在著不同維修情形的維修排程問題
  8. The wafer probing scheduling problem ( wpsp ) is a variation of the parallel - machine problem, which carries with the objective to minimize the total workload to enhance the utilization rate of machine capacity

    摘要晶圓針測排程問題為平行機臺排程問題的一種,且的目標在最小化所有機臺的工作負荷以提高機臺利用率。
  9. Then, a restricted - aco ( ant colony optimization ) algorithm is proposed to solve the car - sequencing problem with buffer restriction under a round painted body storage, which reaches the objective to minimize the total conveyor stoppage time

    在此基礎上,設計了約束集蟻群演算法求解環型油漆車身緩沖區約束下,以傳送帶中斷時間最短為目標的汽車製造排程問題
  10. However, to minimize the maximum completion time for the wafer probing scheduling problem ( wpsp ) is very important for equally utilizing the capacity of parallel - machine, while satisfying the requirements of product types, product family, sequence dependent setup time, product - type dependent processing time, due dates of jobs, and capacities of machines

    然而求解晶圓針測排程問題最大完工時間的最小化以均勻的利用平行機臺的產能是非常重要的,該尚考慮以下的特性:產品別與產品族、順序相依設置時間、決定於產品別的工作處理時間、工作交期與機臺產能限制等。
  11. Concretely we discuss the application of the shortest path problem, traveling salesman problerm and project management method on the touring itinerary improvement of travel agency. furthermore, we explore the use of minimum spanning tree problem, overlaid problerm and maximum flow problerm on the touring itinerary improvement of scenic spots. and also enclosed detailed spreadsheet solutions

    具體的,討論了最短路、旅行商排程問題在旅行社線路優化中的應用;討論了最小支撐樹、覆蓋和最大流在旅遊景區線路優化中的運用,並在附錄中給出了詳細的電子表格解法。
  12. So research on the problem is of importance in theory and practice

    因此,開展對的研究具有重要的理論意義和工應用價值。
  13. Firstly, a 0 - 1 integer programming mathematical model is constructed to describe tail - number - assigning work happened in domestic airline, since the problem is npc, a unified polynomial algorithm which satisfies engineering requirement is unavailable. illuminated by the practical experience, a specific tna problem is classified into one of three typical tna modes : tna based on fleet dispatching commands, tna based on fleet balance application, tna based on minimum fleet requirement ; secondly, by simplifying and relaxing some minor constraints, corresponding mathematical models and heuristic algorithms are reconstructed for each typical tna mode ; finally, computing complexities are discussed

    為此論文在借鑒手工編制班計劃經驗的基礎上,將一個具體的飛機,歸結為三種典型班模式中的一種,即:基於飛機調度指令要求的,基於飛機使用均衡要求的和基於最少需用飛機數的,對于每種典型的飛機班模式,在對次要的約束條件進行簡化、松馳的基礎上構造出相應的能夠滿足工應用要求的啟發式演算法,並分析了演算法的復雜性。
  14. Based on the analysis of the features, key procedure and research tendency of various algorithms for cutting stock problem, this paper proposes that the increasing of material utility ratio can not be reached by solving cutting stock problem only. a integrated solution should be resolved from both management and application optimization technology in view of system engineering

    通過分析各樣演算法的特點、關鍵步驟與研究趨勢,本文從系統工的觀點出發,指出提高材料利用率不僅僅只是一個的求解,而是要從下料生產管理和優化技術方法兩個方面同時入手,建立完整的解決方案。
  15. Abstract : in this paper, we discussed a new kind of single machine scheduling problems with controllable processing times. the objective function being considered was the sum of weighted completion times of all jobs plus the maximum dissatisfaction of all jobs ' processing times that deviated from their specified ones. we presented a polynomial algorithm to solve the problem

    文摘:本文討論了一類新的加工時間可控的單機.我們所考慮的目標函數由所有工件的加權完工時間之和與對所有工件的實際加工時間偏離額定加工時間的最大不滿意度這兩部分組成.對此,我們提出了一個多項式演算法
  16. In addition, the pmx operator as well as other genetic operators for these two problems are very efficient, and so is the responding program

    另外,本文針對指派提出的pmx交叉運算元以及設計的運行序非常有效。
  17. The major tasks include : ( 1 ) expand the schema theorem for ga. the schema theorem with binary coding advanced by professor holland is expanded to limited integer, letter, floating point numbers the number of which value is limited, and their hybrid coding. ( 2 ) put forward replacing by the excellent chromosome ga ( recga ), superiority colony first ga ( scfga ) and improve the ga ; ( 3 ) make probability convergence analysis of recga using the theory of markov chain, random process ; ( 4 ) make convergence analysis of scfga using the principle of contractive mapping in functional analysis theory ; ( 5 ) design the test programs ( cap ) to resolve np problems ( course arrangement ) with gas ; based on recga, modify the arithmetic and then conduct tests

    主要有以下幾方面工作: ( 1 )將二進制編碼遺傳演算法的模式定理擴展到由有限整數、字母或取值個數有限的浮點數編碼,或它們混合編碼的遺傳演算法范圍; ( 2 )提出最佳個體替換策略遺傳演算法( recga ) 、優勢群體優先策略遺傳演算法( scfga ) ,對遺傳演算法進行改進; ( 3 )使用隨機過理論markov鏈對recga進行了收斂性分析; ( 4 )使用泛函分析理論壓縮映射原理對scfga進行了收斂性分析; ( 5 )使用遺傳演算法設計了解決np類)的測試序( cap ) ,並根據recga對演算法進行改進並進行測試。
  18. The mathematical mode of a sequencing problem in management system is raised and it is solved successfully by designing the responding hga computer program

    提出了生產管理中一類的數學模型並設計了有效的混合式遺傳演算法求解序。
  19. The subject focus on the issues about how to optimize the usage of material for manufacturing, especially on wood plate, the core arithmetic of the system is algorism genetic algorithms using the computer technology, the system is developed to realize the algorithms, which can optimize layout of two - dimensional cutting stock automatically the genetic algorithms overcome shortcomings of some traditional optimization, which can only get the local optimal solutions. the algorithms step out from local optimization to get the global optimization through the gene mutation of chromosome

    本課對目前製造業生產工藝中存在的下料,尤其是板式傢具的優化,進行了深入地分析和研究,將實數型遺傳演算法作為核心演算法,引入到系統設計中,提出了解決板材下料的一套實用演算法,結合計算機編,實現了二維板材傢具優化下料的自動優化料系統。
  20. The most important task object of all in the process of tunnel construction is karst groundwater. without investigating thoroughly basic condition and dealing appropriately with drainage problems, enormous economic loss would be occurred with hazards to tunnel construction

    巖溶地下水是隧道施工建設過中最主要的工作對象,如果未能搞清楚巖溶地下水的基本情況,解決好,將會給施工帶來嚴重危害,造成重大的經濟損失。
分享友人