控制抬 的英文怎麼說

中文拼音 [kòngzhìtái]
控制抬 英文
co ole
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : 動詞1 (往上托; 舉) lift up; raise 2 (共同用手或肩膀搬) carry together 3 (指抬扛) argue for ...
  • 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
  1. The function of optimization cutting and automatically change the tools : when the tools in the middle should jump cut ( or all working tools should changeover ), the computer can automatically control the tools in the middle ( or all working tools ) up and down, and also the gap of up and down just on the cut trace of the cross cutter so that reach optimization cutting and changing the size

    優化切裁和自動換刀:當縱切機中間刀需要跳刀(或所有工作刀換刀)切割時,計算機自動中間切刀(或所有工作刀)落刀並且落刀的間隙恰好在橫切劃痕上,以實現優化切裁和變尺功能。
  2. The construction bureau of beijing has launched several policies to regulate the overall beijing property market since april 2006, with the emphasis on mortgage information bulletin of presale property projects ; qualifications of property agents ; strengthening the monitoring and control of property market ; regulating the contract - signing process of property transaction ; developing the regulations for property transaction and other specific issues

    4月以來,北京市建委先後出臺政策,從房地產預售項目抵押信息公示、商品房的售樓人員資格認證、加強商品房交易市場動態監管、規范商品房合同簽約行為、規范商品房預銷售管理、開展房屋交易市場秩序專項整頓等方面開展了對北京房地產市場秩序的全面整頓;並且對不符合條件擅自預售商品房,捂盤惜售、囤積房源,惡意炒作、哄房價等行為進行了約束和
  3. The real estate development cost control methods are specified of decision, design, execution stage to reduce the construction cost, and it is compiling feasibility study report and capital invest estimation in decision, optimizing the design scheme and designed rationally in the technique and construction drawing design stage, electing rational construction scheme in construction stage, controlling the change in the work and field visas strictly, examining and approving budge detailed, budge planning use the quantities list, electing the best subcontractor, preventing some monopoly raise the price, collecting the detailed data in the fieldwork, making strict bargain

    討論了房地產開發項目的決策階段、設計階段、實施階段分別需要採取的相關措施和方法,以盡量降低項目的工程造價,即在決策階段編寫詳細的可行性研究報告和編投資估算;在設計階段優化設計方案,進行合理的技術設計和施工圖設計;在實施階段選擇合理的施工方案,嚴格工程變更和現場簽證,嚴格審核工程施工圖預算,工程造價的預算採用工程量清單報價,擇優確定專業分包單位,防止少數壟斷性行業任意價,深入現場,收集和掌握施工有關資料,定嚴密的合同條款。
  4. A part or surface, such as a wing, propeller blade, or rudder, whose shape and orientation control stability, direction, lift, thrust, or propulsion

    翼剖面;機翼;翼面一個部件或平面,如機翼、螺旋槳葉、方向舵等,其形狀或方位穩定性、方向、升、沖擊或驅動
  5. When the simulation calculation procedure is applied to the rib - hoisting process of nannidu arch bridge, simplification model suited to the case is established, the pre - rising elevation on the rib - hoisting course is predicted, and real - time control is discussed

    將模擬計算程序應用於南里渡特大橋拱肋吊裝過程,建立了適合現場計算的簡化模型,預測了拱肋吊裝階段的預標高,並對吊裝過程進行實時
  6. When the three - gorge reservoir is sluiced, the underground water level will ascend obviously and mechanics parameters of the slip strip below the reservoir water level can drop further, sidaogou landslide can lose stability wholly in controlled condition influenced by buoyancy of underground water and saturation stress at water level dropping

    三峽水庫蓄水后,滑體內的地下水位將明顯高,庫水以下的滑帶力學參數會進一步降低,受滑體內地下水揚壓力及水庫水位降落時滲透壓力的影響,四道溝滑坡在工況下可能整體失穩。
  7. The cutter has high reliable cylinder and proportional electro - magnet for force, and the tools lift and down all controlled by computer so that the system has good stable

    切刀裝置採用高可靠性的汽缸和比例電磁鐵加壓,以保證系統穩定,落刀過程均由計算機,準確可靠
  8. While the capital controls helped to prevent capital from flowing out of the country, the competition - mitigating administrative controls sought to avoid the driving up of returns on various financial assets and thus to allow the government to maintain a source of cheap capital for financing soes ' investments ( li 1994 ; li 2001 ; gordon and li 2003 )

    當資本幫助阻止資本流出國外時,限競爭的行政管試圖避免導致哄各種金融資產利潤的上升因而允許政府堅持給國有公司的投資提供廉價資本的源泉。
  9. On the analyzing of the technology trend, a plan of developing a multifunctional mark printer is brought forward the procedure of the development of a multifunctional mark printer is detailed in this thesis. a interface - card and a photoelectric board is designed, a control circuit is assembled by using them, through which a computer can control the mark printer ; a mark printer driver is developed by using com technology ; the mechanical part of the mark printer is designed by imitating milling machine ; a database software for components management is developed for high - speed train bearing industry. the managements include the registering for components, unique mark printing on components and analyzing of useful parameters. the user can complete the lifetime tracing for a component expediently

    設計介面卡和光電隔離放大電路,組成了電機電路,通過它們pc機可以標號印表機工作;採用組件化技術開發了標號印表機軟體,驅動標號印表機工作;參考刻模銑床原理,設計了機械部分;針對高速客車軸承廠,開發了零件標號管理軟體,使標號列印和信息管理系統有機結合起來,達到在登記零件信息的同時,自動列印零件的標號,方便了對零件的跟蹤管理。
  10. Based on analysis of the inherent relationship between the changes of erosion and deposit in tongguan reaches and in lower reaches of weihe river, the author pointed out that the changes of erosion and deposit downstream of weihe river is in good agreement with the changes of erosion and deposit at tongguan reaches

    摘要三門峽水庫運用以來,潼關高程持續升,渭河下游仍在淤積發展,究竟是潼關高程升引起渭河下游淤積發展,還是渭河下游淤積發展造成潼關高程的緩慢上升,一直是三門峽問題的焦點。
  11. Effects of maintenance and raise of water level at yichang station by river bottom protection and roughness addition method and pool back - fill method in the reach from yichang to zhicheng of the changjiang river are calculated and compared by using a 2 - d flow numerical simulation method

    摘要運用二維水流數值模擬方法,計算比較了在宜昌枝城的長江河段內選取重點河段,進行護底加糙及回填深槽對維護並高宜昌水位的效果。
  12. Preliminary studies suggest that the mutual relations of the security, economic and risk should be adjusted and made into organic unity during determination of design flood standards for construction, the concepts on the cascade exploitation of the river should be transferred from flood control to flood management, the design flood standards for construction at the initial, middle and later stages of high dam projects should be driven up gradually according to reservoir capacity

    初步研究認為,在施工洪水設計標準選擇時,應處理好安全、經濟和風險相互之間的關系,以達到三者有機的統一;在梯級開發河流上應實施從施工洪水到施工洪水管理的觀念轉移;高壩大庫工程的初期、中期、後期三個時段的施工洪水設計標準應根據庫容等指標逐步高。
  13. We can learn from the result that adopted the different limited water levers in flood season could raise the benefit of reservoir but not increasing the risk of reservoir at the same time. the risk rate of flood control will increase if the limited water level is raised, but the increased flood control risk will not very large at frequent flood owing to the discharge capacity of reservoir is larger

    分析發現,水庫實現分期汛限水位,可以在不增加水庫防洪風險的同時提高水庫的興利效益,高水庫的汛限水位,防洪風險率會增加,但由於水庫的下泄能力較大,在常遇洪水情況下其防洪風險率增加幅度並不會很大。
  14. To accept the current signal from high negative voltage circuit, the analog ground is raised to a certain positive voltage, which makes it possible for the signal amplitude to be compressed at the same time of its polarity reversion. a pi control program special for laser gyro current control is brought forward according to the conventional pid control method, in which the control signal is figured out corresponding to the difference between the sample and the reference value by turn of proportion - short step integral - long step integral. and at the end of this paper, a comparison of system performance on different conditions is made and the key elements influencing system performance are educed

    利用集成a / d 、 d / a轉換器的新型晶元aduc824 ,實現了電流(電壓)采樣?數據處理?電流的閉環結構;地電位的升解決了a / d轉換器對負高壓迴路電流采樣時的輸入范圍匹配問題;信號反相的同時進行幅度壓縮,使得輸出調整電壓的解析度提高;根據常規的比例?積分?微分( pid )調節模型,針對陀螺系統的特性,給出了一種可以滿足系統要求、據采樣值偏差大小進行的比例?大步長積分?小步長積分、分層次比例?積分演算法;不同條件下系統穩流性能的對比、分析在論文最後給出,並據此找出了決定該系統穩流精度的關鍵因素,提出了系統的改進意見。
  15. Computerized high - speed lockstitch se4wing machine simplified the working process and improved the efficiency. with features of automatic thread trimmer, thread - wiper, reverse - feed and presser footlifter

    採用電腦的高速平縫機簡化了普通平縫機的操作程序,減少了工人的勞動強度,大大提高了生產效率.具有自動剪線、自動停針、自動倒縫及自動壓腳等功能。
  16. And the fundamental way out for the realization of the judicial impartiality lies in its reformation. on the basis of the principle of rule of law in constitution and by using the advanced experience of china and foreign countries for reference, we ought to reform the outdated judicial system which does n ' t conform to the operating law of administration of justice inside, to better the leadership system of judiciary by the party, to improve the relationship of power between legislative bodies ( the npc at all levels ) and judicial organs, to restrict the unjustified interventions of judicial powers by administrative authority, and to repres s the local, implemental and administrative trends in judicial powers. and within the operating mechanism of judicial powers, we should perfect the selection of judges and their job security and enhance the requisite qualifications to be judges

    司法改革的根本目標是司法公正,實現司法公正的根本出路在於司法改革,我們應當根據憲法的法治原則,借鑒中外司法度中的先進成果,改革不符合司法權內在運作規律要求的舊的司法度,改革黨對司法的領導體,完善立法機關(各級人大)與司法的權力關系,行政權對司法權的不當干預,阻止司法權的地方化、工具化及行政化的趨勢;在司法權運作機內部,完善法官的選拔及職業保障,高法官的資格門檻,同時廢除違反司法權性質的上下級之間請示、匯報、審批度等等。
  17. Based on the water supply risk and its variable process of dalian city, this paper proposes a cost - benefit analysis method for flood resources to inquire into the control range of the reservoir ' s flood limit water level, according to the use course of the flood resources and flood range analysis

    摘要以大連市碧流河水庫為例,根據大連市供用水系統的風險及其變化過程,分析超蓄洪水資源的利用情況及其效益,並在對高水庫汛限水位造成的淹沒損失分析的基礎上,利用邊際成本分析方法確定的范圍。
  18. It is suggested that the distribution of the depositional systems and the depositional facies have the clear characteristic that in the north of the research area, the alluvial fan sediment, the fluvial system and the delta system are the main styles of the depositional system, towards to the direction of basin the lacustrine, the barrier, the carbonate ramp system become the main depositional systems

    受海平面升降變化,區內沉積體系和沉積相的分佈具有明顯的分帶性,北部靠近源區以沖積扇或河流及三角洲沉積為主,向盆地方向以湖泊或海岸障壁-瀉湖、碳酸鹽緩坡沉積為主。中二疊世北部源區發生構造升,當時古氣候逐漸乾燥,成煤環境結束,沉積物以陸相河流、湖泊三角洲占優勢。
  19. The emergency - use electrically powered stretcher eximobiler 5000sp is the first device of its kind to replace the conventionally manual type or hydraulic type system for raising and lowering the mattress height and head section height with an electrically powered system

    急救用電動擔架5000sp摒棄了以往的手動式和油壓式首次採用電動式,只需輕輕一按遙器就能實現升降及床頭放操作,大大減輕了醫生和護士的負擔。
  20. Cost of commodity of drive up china, control china commodity exports the united states in great quantities

    高中國商品成本,中國商品大量出口到美國
分享友人