控制段單位 的英文怎麼說

中文拼音 [kòngzhìduàndānwèi]
控制段單位 英文
block control unit (bcu)
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
  1. The ordered and micro - phase structures of the molecular of pu materials are decided directly by its synthesis technology, composition and other materials compounded with it, and they will influence the possessive properties of pu materials. in this paper, general studies on pu have been carried out by the methods of controlling the prepolymerize technology, taking off dissociative tdi from prepolymer through decompress boiling distilling technology, polymerized in - situ with nano - particles and interpenetrated with ps, the relationship between properties and structure of pu / omt, pu / sio2 nano - composites and pu / ps ipns were characterized by ftir, dmta, tem andtga

    本文用預聚體反應中體的摩爾比、減壓共沸蒸餾去除預聚體中游離tdi 、用納米填料參與聚氨酯原復合和與聚苯乙烯進行互貫等方法,合成了聚氨酯蒙脫土納米復合材料、聚氨酯sio _ 2納米復合材料和兩步法合成的基於聚醚( ppg )和聚酯( 3010 )的聚氨酯苯乙烯互穿網路聚合物材料,研究了其性能;運用ftir 、 dmta 、 tem 、 tga等表徵手,對復合材料的結構進行了研究。
  2. The real estate development cost control methods are specified of decision, design, execution stage to reduce the construction cost, and it is compiling feasibility study report and capital invest estimation in decision, optimizing the design scheme and designed rationally in the technique and construction drawing design stage, electing rational construction scheme in construction stage, controlling the change in the work and field visas strictly, examining and approving budge detailed, budge planning use the quantities list, electing the best subcontractor, preventing some monopoly raise the price, collecting the detailed data in the fieldwork, making strict bargain

    討論了房地產開發項目的決策階、設計階、實施階分別需要採取的相關措施和方法,以盡量降低項目的工程造價,即在決策階編寫詳細的可行性研究報告和編投資估算;在設計階優化設計方案,進行合理的技術設計和施工圖設計;在實施階選擇合理的施工方案,嚴格工程變更和現場簽證,嚴格審核工程施工圖預算,工程造價的預算採用工程量清報價,擇優確定專業分包,防止少數壟斷性行業任意抬價,深入現場,收集和掌握施工有關資料,定嚴密的合同條款。
  3. Block control unit

    控制段單位
  4. As a self - restriction mechanism of an enterprise, internal audit has become a vital part of modern enterprise ' s system. it is an important measure for departments and units to consummate interior control system, maintain fiscal discipline, meliorate management and improve economic efficiency

    內部審計作為企業的自我約束機,已成為現代企業度的重要組成部分,是部門和健全內部度、維護財經紀律、改善經營管理、提高經濟效益的重要手
  5. The thesis comprehensively deliberates stochastic and fuzzy character of controlling the cost of engineering construction ; it takes quantitative analysis as the dominant factor, takes qualitative analysis as the secondary factor, establishes an comprehensive system of controlling the cost, and make various theories, the basic principles and the methods of engineering maths in the analysis and calculation of controlling the cost of engineering construction, such as effect theory, fuzzy maths, value engineering, grey system and system simulation. it also establishes the simple and effective practical model. on the basis of practical example, it puts forwards the train of thought and method to controls the cost of engineering construction in the different stage

    本論文綜合考慮了工程造價的隨機性和模糊性,以定量分析為主,定性分析為輔,構造了造價的綜合體系,將效用理論、模糊數學、價值工程、灰色系統、計算機模擬等多種理論及工程數學的基本原理和方法應用到工程項目造價的分析和計算中,建立了簡便而有效的實用模型,並結合工程實例,提出來了不同階工程造價的思路和方法,針對不同的情況,綜合應用定性與定量的方法,消除了以往工程項目造價只停留于項目實施階的缺陷,提高了量化研究的水平和準確性,為政府建設管理部門進行科學管理及各建設參與今後進一步改進自身的項目造價管理工作提供了寶貴的理論依據。
  6. According to the situation request, we combine with the fact on the railway for the time being, raised the whole views and suggestions to the railway improvement, the first : to realise railway shareholding entreprises is the basic way of railway improvement winder the public ownership circumstance, the second : it is gotton the whole locatim to the function of ministery of rail ways, railway bureau. the branch of railway bureau and the units of railway department, it is designed the whole developing frame that the funtion of ministry of railways is macro - controler, the railway bureau or its branch is management substance which ouur legal qualifaction the unit of railway department is the basic product unit, the third : it describes kinds of faults on the present four level management, and tolal the data auording to the fact

    根據形勢要求,結合目前鐵路的實際情況,對當今鐵路的改革提出了整體的看法和建議:第一、實現鐵路企業股份是公有條件下鐵路改革的根本出路;第二、對鐵道部、鐵路局、鐵路分局、基層站的功能給予了整體的定;設計了鐵道部的功能是宏觀調者,鐵路局或分局為法人代表的經營實體,基礎站為生產基本的整體改革框架;第三、對目前四級管理體的種種缺陷作了描述,並根據實際情況進行了數據統計。
  7. An array of regulatory proteins have been found, which inhibit the formation of central enzymes involved in early stages of the complement activation pathway. these include membrane cofactor protein ( mcp cd46 ), decay - accelerating factor protein ( daf cd5 5 ), complement receptor 1 ( cr1, cd35 ), as well as cd59, which inhibits formation of the membrane attack complex during later stages. these regulatory factors are widely expressed and abundant on many cells, and in fluids of reproductive system

    目前發現,機體多種細胞以及生殖系統的體液中表達和分泌豐富的補體調蛋白,包括作用於補體活化早期階的cd55 、 cd46 、 cd35和作用於補體活化終末階的cd59 ,它們分別通過抑補體活化過程中關鍵的c3 、 c5轉化酶和抑形成膜攻擊,抵抗補體對自身組織細胞的攻擊。
  8. However the data transferred from the jk2000 system must be deal with. thus the realization of management information system in locomotive depot and so on must be completed as soon as possible. there are lots of work which are being done in handwork fashion still in more than 100 locomotive depots, such as drawing locomotive turnover picture and managing the dispatching of stewards and the reporting of data to leadership units and so on

    然而,監裝置中的數據要求轉移到地面進行相關的處理,因此鐵道部機務局、鐵路局、鐵路分局、機務實現信息化管理迫在眉睫;全國100多個機務運用室的管理有的目前還是停留在原始的手工作業方式上,例如:機車周轉圖的繪,乘務員派班管理,定期通過人工傳遞報表數據上報到上級等等。
  9. It takes much space to expatiates the strong function of the sixteen - bits singlechip which control the winding machine to the whole running. there is a deeper study for the two electromotors ' ( ac main electromotor and step motor ) using and driving circuit for actual winding, . i also expatiated the detect of those signals. the control program which has been compiled and simulated to debug is listed in the end of the dissertation

    本文重點闡述了16片機在繞線機整體中所顯示出來的強大功能,並對用於實施具體繞線的兩個電機(交流主電機和步進電機)的使用與驅動電路作了比較深入的研究,對于信號的檢測有較詳細的闡述,在文末列出了已通過編譯模擬調試的用c語言所編寫的製程序,並對程序分進行分析。
  10. The following paragraphs describe our commitment to the protection of personal information as it applies to the ups web sites, which are web sites controlled or operated by a ups entity such as a ups business unit or a ups affiliate, unless the web site expressly publishes a different or modified privacy policy

    下列落為我們在保護ups網站中個人資料所作的承諾。 ups網站指由某ups實體例如某ups業務或某ups關系的網站,除非該網站明確發布不同或修訂的隱私權原則。
  11. Dsp56f805 samples the ultrasonic pulse coming back from the target, then measures the distance and shows it on led. tms320vc5509a is accomplished the detecting speed and the main control of the radar system, is 16 fixed dsp with high performance and low power produced by ti company. dsp5509a samples the wave coming from t / r module, then measures the target ’ s speed and send this information to the assistant control chip - p89v51 based on boost c51 core mcs produced by philips company, which controls the lcd

    測距雷達系統的和信號處理的核心晶元是motorola公司的dsp型16片機56f805 ,由它對超聲波回波脈沖進行ad采樣后,計算目標距離並在七數碼管上顯示。測速雷達系統中信號處理的核心晶元是ti公司的超低功耗、高性能的16定點dsp ? ? tms320vc5509a ,由它對收發組件輸出的多普勒回波進行采樣,計算出目標運動速度后,送給輔助晶元? ?飛利浦公司生產的基於c51內核的增強型片機p89v51 ,並且在液晶顯示器上顯示速度信息。
  12. Aiming at main project of the xiaoxihu bridge, a low pylon cable - stayed bridge, based on the existing theory and method of the bridge construction controlling theory, using the basic function of " ansys ", farther exploitation was done on concrete elasticity and creep calculating distinguishingly, nonlinearity analysis theory was used to construct the space model, the main beam, string pylon and abutment were simulated by the beam elements which was considered the shearing effect. which is worthy of considering that using the geometric non - linear truss elements to simulate the stayed - cable, form traveler is modeled as structure elements and participate in stress analysis. four stages are used to model the construction stage, which are : ( 1 ) the erection of form traveler ; ( 2 ) placing the segmental concrete ; ( 3 ) jacking the tendons ; ( 4 ) tensioning the stay cables

    針對建設中的小西湖矮塔斜拉橋的主體工程,結合已有的橋梁施工的理論和方法,利用大型通用計算軟體ansys的基本功能,並著重在混凝土彈性計算及徐變計算方面做了相應的二次開發,採用非線性分析理論並建立了空間結構模型、用考慮剪切作用的梁元模擬主梁、索塔和橋墩;用可考慮幾何非線性的桁元模擬斜拉索、施工掛藍作為結構元進行拆裝,參與受力計算,整個施工過程按施工循環周期分為若干階,每個階又分為四個工況,即:空掛藍就、澆築完畢階混凝土、張拉預應力鋼筋和張拉斜拉索。
  13. During unit startup and load is lower than 15 %, drum level is controlled by feedwater control valve, feedwater pump remains at minimum safety speed ; when load is between 15 % and 25 %, feedwater control valve is closing at fixed speed determined by function module, main motor - operated - valve is opened automatically, control mode of drum level is transferred to feedwater pump automatically and bumplessly ; when load is between 25 % and 50 %, control valve is closed fully, and main motor - operated - valve is open fully, drum level is controlled by one pump ; when load is more than 50 %, first pump is kept in operation, second pump is putting into operation automatically and

    在機組啟動、沖轉及機組並網至15 %負荷階,給水泵維持在最低安全轉速下運行,汽包水由低負荷給水調節閥自動; 15 %至25 %負荷階,給水調節閥由函數模塊按照一定的速率自動平滑關閉,主給水電動門自動打開,汽包水方式自動無擾切換為給水泵自動;負荷在25 %至50 %階時,給水調節閥已完全關閉,主給水電動門已完全打開,水已全由臺給水泵承擔;負荷大於50 %后,在第一臺給水泵運行的同時,第二臺給水泵自動無擾投入。
  14. Next in order this paper presents the idea of establishing abc thought in the erp financial accounting module, mostly including first is establishing the relationship between cost driver and product 、 cost 、 expenses ; second is designing appropriate accounting evidence ; the third is establishing abc accounting process in financial system. and then bring up to reform the erp system from four aspects to adapt to the demand of abc cost accounting process design, we ( 1 ) divide activity center according to process means 、 process object 、 process craft and concentration degrees of geography position, ( 2 ) revise production craft flow detailed list, ( 3 ) compile resource requirements planning, ( 4 ) compile activity input / output control statement

    其次提出在erp財務會計模塊中構建abc思想的思路,主要包括建立成本動因與產品、成本、費用之間的聯系、設計適當的會計憑證、建立財務系統abc核算流程;而後提出從四個方面改造erp系統以適應abc成本核算流程設計的需要,一是按加工手、加工對象、加工工藝和地理置集中程度四個條件劃分作業中心、二是對生產工藝流程清進行修訂、三是編資源需求計劃、四是編製作業投入/產出報表。
  15. The analyses indicate that the shm ' s control ability has strong adaptability to various slender body at high angles of attack, and its control ability is determined by the original state of the flowfield around the slender body

    實驗分析表明,微吹氣擾動這一大迎角非對稱具有較強的適應能力,其能力的大小則由該頭部形狀的初始狀態決定。
  16. Referring to the standard nema dual ring phase scheme, it analyzes the candidate phase transition and presented the concept of 3 - stage phase transition process, which can generate the phase combination and phase transition with high flexibility and is able to reduce the complexity of decision making process

    參考nema標準的雙環相結構,分析了點自適應策略的備選相切換方案,提出「三階」相切換過程,能靈活地實現相組合和相切換,降低相切換決策方法的復雜程度。
  17. The control system adopts high capability singlechip, aduc812 ( 8052 - compatible core ). it can expediently achieve a / d ( 12bit ), d / a ( 12bit ), phase compensation of the rotor position singles, and speed closed - loop control, and fully resolves the well - off switch from the out - synchronization to the in - synchronization. the practical prototype of the system is developed for the control of a dentist " sensorless brushless dc drill motor

    系統採用高性能aduc812 (兼容8052內核)片機作為微處理器,方便的實現a / d ( 12) 、 d / a ( 12) 、電機轉子置信號相檢測與補償以及系統速度閉環,很好地解決了無置傳感器bldcm從外同步運行階到內同步運行階的順利切換。
分享友人