控制預算差異 的英文怎麼說

中文拼音 [kòngzhìsuànchā]
控制預算差異 英文
control-budget variance
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ動詞1 (計算數目) calculate; reckon; compute; figure 2 (計算進去) include; count 3 (謀劃;計...
  • : 差Ⅰ名詞1 (不相同; 不相合) difference; dissimilarity 2 (差錯) mistake 3 [數學] (差數) differ...
  • : 形容詞1 (有分別; 不相同) different 2 (奇異; 特別) strange; unusual; extraordinary 3 (另外的;...
  • 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
  • 預算 : budget1991
  1. Combining with the performances of danshan bridge, discussing the methods on the construction controlling and calculation of cable - stayed bridge, this paper raises an efficient construction controlling system, and realizes collecting construction data of the real bridge and technical information. by analyzing on the difference of theoretical calculation and real construction state, the author determines to take self - adapting construction controlling method which uses kalman filter method to identify and adjust construction parameters. by getting rational construction state from forward iteration method, this paper, taking concrete creep effect in consideration, raises a rational scheme to pre - remain deformation and adjust cable force

    結合丹山橋的結構特點,通過對斜拉橋施工及結構計方法的探討,提出了有效的施工系統,實現了對實橋施工數據和技術信息的採集;通過分析理論計與實際施工狀態的,確定了以卡爾曼濾波法作為施工參數識別與調整的自適應施工方法;通過正裝迭代法確定其合理施工狀態,並考慮混凝土的徐變效應,提出了合理的留拱度和索力調整方案。
  2. Based on the introduction of the principles of takagi - sugeno ( t - s ) fuzzy model and generalized predictive control ( gpc ) algorithm, the fuzzy predictive control method combining gpc and t - s model is classified as three kinds of algorithms. the design method of these algorithms is presented in detail. a comparison of these fgpc strategies in control performance and complexity of computation is given by simulation

    在介紹了t - s模糊模型和gpc基本原理的基礎上,將基於t - s模型的gpc歸納為三種演法,從理論上對這三種演法進行了詳細地推導,並通過模擬研究比較了三種演法的性能和計負擔上的;從而為這一類模糊的實際應用提供了選擇的依據,也為進一步的性能分析奠定了基礎。
  3. Daily cost control method ( cost control in the process of activity ) employing the accounting cost controlling theory and method with the reality of liaohe oilfield considered, we are able to establish the cost accounting method, cost difference computing method, co rrecting cost difference method and the frame of monitoring cost implementation and alarming difference analysis

    日常成本(事中成本)方法。主要是應用成本理論和方法,結合遼河油田實際,建立了成本核方法、成本方法、糾正成本方法和成本執行情況監分析系統框架。
  4. We study the design of haar wavelet for scale = a ( a2 ) and present a decomposition and reconstruction algorithm in chapter 3. secondly, in chapter 4 we study the design of orthonormal mutiwavelets of multiplicity r with scale = a ( a2 ). by the factorization theory, we give parametric expressions for orthonormal causal fir multifilter banks of r = 2 and scale = 4, and we found the length of scaling function can be controlled by the parameters. finally, we provide the error analysis between discrete multiwavelet transform coefficients and continue multiwavelet transform coefficients

    由於多小波變換系數的計是直接與其濾波方式相聯系的,而在單小波變換系數計中之所以能由近似表示就是因為尺度函數具有低通特性和平移正交性,由此我們研究了能滿足以上要求的濾波,並對離散小波變換系數和連續小波變換系數之間的作了分析,從誤分析結果我們可以見:為了減少誤我們可以通過對濾波的進一步設計來
分享友人