撐架橋 的英文怎麼說

中文拼音 [chēngjiàqiáo]
撐架橋 英文
strut-framed bridge
  • : Ⅰ動詞1 (抵住; 托住) prop up; support 2 (用篙使船行進) push or move with a pole 3 (支持) mai...
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  1. Corrosion may have played a role here as well : the minneapolis bridge ? what ' s known as a deck steel truss bridge ? was a concrete roadway supported by gridwork of steel

    金屬的銹蝕也許在這些事故中扮演者某種角色:明尼阿波利斯是一座鋼板桁,也就是有鋼格來支混凝土面。
  2. The design and construction of obliquely supported high bent for pier cap beams of lu pu bridge

    上海盧浦大墩柱蓋梁斜高排的設計和施工
  3. Steel - wood composite support scaffold was employed for construction of danhe river super major bridge, a stone arch bridge with a main span of 146 m

    晉焦高速公路丹河特大為主跨146m的石拱,該在施工中採用鋼、木結合的支
  4. Because railway bridges are subjected to cyclical loading, their designs must account for the significant effects that fatigue can have on connections

    由於技術和建築學的考慮,一種獨特的軋制鋼被選用於拱和高身的某些特定支
  5. Because of technical and architectural considerations, a unique combination of rolled and cast steel was selected for the arch bridge as well as for certain supports elsewhere along the viaduct

    由於技術和建築學的考慮,一種獨特的軋制鋼被選用於拱和高身的某些特定支
  6. This paper mainly makes the research of construction method for cast - in - situ concrete box girder of continuous girder bridge, using assembled highway bridge steel truss ( often known as bailey truss ) as the falsework, technical schemes for the falsework erected over river, particularly the rigid slant supports of the falsework on piers, and analysis, calculation methods and deformation of the falsework in accordance with the related tests in field

    摘要主要研究了採用裝配式公路鋼(通常稱為貝雷)做為支進行連續梁現澆箱梁混凝土的施工方法;研究了跨河施工支的技術方案,特別是施工支墩上的剛性斜,同時結合現場試驗研究了施工支的分析計算方法及變形。
  7. Rostov did not think of the meaning of the need of stretchers. he ran along, trying only to be ahead of all. but just at the bridge, not looking at his feet, he got into the slippery, trodden mud, and stumbling fell on his hands

    羅斯托夫沒有去思考,把擔叫來意味著什麼,他一直跑著,只是想方設法要跑到大夥兒前面去,可是一到了頭,因為沒有當心自己腳下的東西,陷入了踩得稀爛的泥濘中,他絆了一跤,跌倒了,兩只手在地上。
  8. The maximum load, span of supports yuelong brand type cable tray must be less allowable load and span of supports

    「躍龍」品牌系列電纜的最大載荷、支間距應小於允許載荷和支荷和支跨距。
  9. The paper has five parts : part i discusses the original cause of the core competence based corporate diversification strategy, and academic and positive researches " sustain of this strategy ' s validity ; part ii demonstrates the essence ' s universal blur of the core competence is the root of difficult to discerning and measuring the core competence itself. and because the base of synergic effect which diversification pursues is blur, the shortcoming of difficult to operating the strategy is exposed ; in order to improve the strategy ' s operating, partlll introduces corporate strategic assets into the strategy to build a bridge between the core competence and corporate diversification. this part clarifies the logic between the core competence and corporate diversification that only if through strategic assets, the core competence ' s competitive advantages can be achieved and corporate diversification must be strategic assets correlative to pursue synergic advantages ; basing on the above discusses, partiv modifies the old strategy properly, and then designs the core competence based strategic assets correlative corporate diversification strategy mode ; the last part takes haier ' s diversification growing mode for example to testify the modifying mode ' s effective use in practice, and hopes other chinese corporations can benefit from this mode too

    本文共分為五部分:第一部分論述了基於核心能力的企業多元化戰略產生的原因,以及理論與實證研究對該戰略有效性的支;第二部分論證了核心能力本質的普遍模糊是核心能力難以識別與測度的根源,進而使多元化追求的協同效應基礎模糊不清,暴露出該戰略難以操作的缺陷;為提高該戰略操作性,第三部分通過引入企業戰略資產,在核心能力與多元化之間構了一座梁,闡明核心能力的競爭優勢要通過戰略資產才能得到具體實現,同時,多元化應相關于戰略資產尋求協同優勢;在此基礎上,第四部分對原有戰略進行適當修正,構建了基於核心能力的戰略資產相關多元化戰略模式;第五部分以海爾企業多元化成長模式為例進行具體剖析,以例證該修正模式在中國的實際運用,期望能給予我國其他企業以有益的借鑒。
  10. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預應力張拉帶來一定困難;支系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁梁的設影響大;懸吊結構未完體系(設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
分享友人