擋土墻擋土墻 的英文怎麼說
中文拼音 [dǎngtǔdǎngtǔ]
擋土墻擋土墻
英文
retaining wall-
Application of bitumen paint to retaining wall at to yuen wai
擋土墻上塗油瀝青Effect of foundation trench strength to endogen force and failure model of cantilever retaining wall
基槽強度對懸臂式擋土墻內力和破壞模式的影響Ming, h. y. and li, x. s. ( 2007 ). " numerical study of impact of soil anisotropy on seismic performance of retaining structure. " international journal of geomechanics, asce, 7 ( 5 ). in press
明海燕,李相崧( 2007 ) . "砂土各向異性對擋土墻抗震性能影響數值分析. "深圳大學學報理工版,第24卷,第3期,出版中Landslip preventive remedial works to slopes retaining walls
斜坡擋土墻的防止山泥傾瀉修補工程The results of field observation showed that mucky clay in the shore slope of the wharfs was the stratum with the most obvious horizontal displacement and most of the pile heads close to the retaining walls inclined towards the land to different degrees, agreeing well with the inclination of pile heads as observed on site
原型觀測結果表明:碼頭岸坡內的淤泥質粘土層為水平位移最明顯土層,靠近擋土墻的大部分樁頂都出現了不同程度的向陸側傾斜,這與實際見到的樁端傾斜狀況完全相符。This general form leads to the unification of coulomb ' s earth pressure theory and rankine ' s earth pressure theory, and makes the classical earth pressure theory to consummate, and enables the computation for retaining wall ' s engineering design to be more convenient
一般形式的提出,使朗肯土壓力理論和庫倫土壓力走向統一,使經典土壓力理論得以完善,使擋土墻工程設計時的計算更加便捷。As the balancing platform tends to make the barycenter move backward, a more balancing stress distribution under the wall, a higher and steadier wall can be achieved. furthermore, the resupine back of the downward wall not only works reasonably, but also can reduce the amount of excavation and filling obviously. so gravity retaining walls with balancing platform are applied heavily
衡重式擋土墻因具有衡重臺使墻身重心后移、墻底應力趨于平衡,可提高擋土高度、增強墻體穩定性;且仰斜式下墻不僅受力合理、還可減少開挖與回填量等優點而被大量採用。Construction of retaining wall no. 36 near cheung sha
鄰近於長沙豎設擋土墻編號36Prefabricated architectural walls and finishes screens, sound barriers and retaining walls
加工前建築墻壁及批蕩隔板隔音屏障及擋土墻Prefabricated architectural walls and finishes screens, sound barriers and retaining walls public works category
加工前建築墻壁及批蕩隔板隔音屏障及擋土墻Design and application of multiple arch trestle type retaining wall of whole section construction
全拼裝連拱支架式擋土墻的設計與應用Wave motion analysis of earthquake action on the toe of retaining walls
擋土墻墻趾地震作用的波動分析The main contents of testing the strength of subgrade abamurus using earthquake wave velocity are as follows : the influence of the lithology and strength of flag stones and the shape of block upon wave velocity, the influence of the strength of cement mortar upon earthquake wave velocity, the estimation standards of the strength and completion of abamurus. this paper puts forward an accurate no - destructive testing using the different reflect of elastic wave velocity for abamurus stones, the strength of mortar, the plumpness of mortar and the type of abamurus, on the basis of laboratory tests and field tests. it can be used to accurately distinguish the completion of abamurus
地震波速法檢測路基擋墻強度,研究的主要內容有:片石巖性和強度及塊體形體對波速的影響;水泥砂漿強度對墻體波速的影響;擋墻整體強度和完整性的評估標準。應用彈性波速度對擋土墻石材、砂漿強度、砂漿飽滿度及擋墻類型的不同反映,在室內外模型試驗和現場生產試驗的基礎上,提出了一種正確的無損檢測法,可以正確判別漿砂片石擋墻墻身的完整性。Construction of retaining walls and noise barrier footings along yuen long highway
興建中的擋土墻和隔音屏墻基Paving granite block facing of rw003 near lung tseng tau
鋪設鄰近於井頭擋土墻編號003的花崗石磚砌石面The works mainly comprise the ground investigation field works at some 23 man - made slopes and retaining walls maintained by the highways department in the new territories and outlying islands, and associated laboratory testing
工程主要包括為約23幅位於新界及離島而由路政署負責維修及保養的人造斜坡及擋土墻進行探土工程及土壤測試。Closure of hard shoulder for construction of retaining wall rws7 and rws8
封閉路肩作建造擋土墻For the purpose of assisting, within the scope of the first paragraph, existing enterprises that have already developed hot spring utilization in hot spring areas to comply with the provisions of the law concerning building use, the municipal or county ( city ) government with due jurisdiction shall, giving consideration to the development characteristics of the hot spring area as well as public safety, stipulate in the assistance program appropriate provisions concerning the setback distance of their building ( s ) from the foot of a retaining wall, the distance between the outer wall of their building ( s ) and retaining wall facilities, and the setback distance of their building ( s ) from a river bank, and submit these together with the program to the executive yuan for approval
為輔導第一項?圍內,現有已開發供溫泉使用事業使用之建築物符合相關法令,直轄市、縣(市)政府應考量溫泉區發展特性併兼顧公共安全,就其建築物至擋土墻坡腳間之退縮距離、建築物外墻與擋土墻設施間之距離及建築物座落河岸之退縮距離,于輔導方案中訂定適用規定,併案報請行政院核定。Stability of retaining wall
擋土墻擋土墻穩定性Fifteen degree or so of nail and anchor inclination is the optimized. some certain value of nail space is proposed by which soil nailing structure and earth nail wall can be differentiated. the method to analyze the gravity retaining wall is applied to earth nail wall
建議土釘和錨桿傾角採用15左右為宜;當土釘間距小於某一值,或土釘密度大於某一定值時,土釘支護形成重力式擋土墻,即土釘墻,此時可以採用重力式擋土墻的分析方法對土釘支護進行分析。分享友人